• Title/Summary/Keyword: 공사비 영향요인

Search Result 117, Processing Time 0.027 seconds

Influencing Factors on Knowledge Adoption of Administrator in an Online Idea Proposal Community: Focusing on the Tourism Idea Bank of Korea Tourism Organization (온라인 아이디어 제안 커뮤니티에서 담당자 지식수용에 영향을 미치는 요인: 한국관광공사 관광아이디어뱅크 게시판을 중심으로)

  • Park, Jong-Won;Koo, Chulmo;Yang, Sung-Byung
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.10
    • /
    • pp.1-17
    • /
    • 2016
  • Recently, although many government agencies, including the Korea Tourism Organization, have been operating two-way interactive online idea proposal communities in order to reflect the various ideas of citizens in business, the utilization rate is still extremely low due to the lack of public's understandings and management's commitments. Therefore, based on previous studies on the characteristics of information quality, this research (1) derives key factors constituting idea quality in the context of online idea proposal communities, (2) classifies them into the content cues (value-added, relevancy, originality, and completeness) and the non-content cue (amount of writing) according to the heuristic-systematic model, and (3) finally validates how these content/non-content cues influence the knowledge adoption of administrators in an online idea proposal community. The findings of the structural equation modeling analysis with all of the 240 completed idea proposals in the 'Tourism Idea Bank' of Korea Tourism Organization reveal that, among content cues, value-added, relevancy, and originality have a significant effect on knowledge adoption. Moreover, it is also found that amount of writing as a non-content cue has a positive moderation effect on the relationships between originality and knowledge adoption.

Development of Reliability for Conceptual Cost Estimates in Construction Projects (건축프로젝트 개산견적 신뢰도 향상 방안)

  • An, Sung-Hoon;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.175-180
    • /
    • 2006
  • Total conceptual cost estimates and the assessment of the reliability of these estimates are critical in the early stages of a building construction project. The purpose of this study is to propose the method to clients or estimators for improving the reliability of conceptual cost estimates by evaluating the reliability of conceptual cost estimates. The data from 83 building construction projects were collected for this study. The results showed that the proposed method can propose alternatives to clients or estimators for improving the reliability of conceptual cost estimates with the process of evaluation, review and feedback. This process can assist clients in their evaluation of the reliability of the estimated cost and the probability of exceeding the target cost, and in their re-estimation after dealing with the elements that influence the conceptual cost estimate badly.

  • PDF

Analysis of Causes of Increase in Construction Cost and Minimize Increase of Cost through Performance Evaluation of Public Construction Projects (공공건설사업의 성과평가를 통한 공사비 증가 원인 분석 및 증가 최소화 방안)

  • Moon, Hyunseok;Ryoo, Geunho;Hong, Hyunki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.567-575
    • /
    • 2024
  • The government and local governments are utilizing regulations, policies, and various project management techniques at each project stage to effectively and systematically manage public construction projects. However, the increase in construction costs continues to occur. In order to solve these problems, this study attempted to collect cases of existing public construction projects and analyze historical data. And it would like to derive the impact factor of increased construction costs. Based on the results, a plan was proposed to prevent the causes of increase and minimize in construction costs. The main reasons for the increase in costs were the occurrence of civil petition, differences between design documents and site conditions, and changes due to requests from the owner and changes in the business plan. And to solve these problems, this study proposed improvement for each cause from an institutional perspective, along with interview with experts and project owners. The results of this study are significant in improving the process of existing public construction process and presenting key inspection and review items for each major inspection stage in order to solve problem resulting from the analysis of the performance of public construction projects.

Soil erosion and sediment in the construction area (도로공사지역의 토양침식 및 토사유출)

  • Park, Sang-Deog;Ji, Min-Gyu;Shin, Seung-Sook;Kim, Ho-Sup;Lee, Jong-Seol
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1760-1763
    • /
    • 2010
  • 산지환경급변지역에서 집중호우에 의한 다량의 토사유출은 하천유역내 사회기반시설을 파괴하는 재해요인으로 작용할 수 있다. 본 연구에서는 산지환경급변지역 중 인위적인 지표교란 지역으로 대표되는 도로공사지역을 선정하여 집중호우가 발생하는 6월, 7월, 8월의 강우사상별 강우에너지와 토양침식 및 토사유출의 관계를 조사하였다. 조사결과 강우에너지가 커질수록 토양침식 및 토사유출량이 증가하는 결과를 나타내고 있다. 토양침식 조사를 위한 조사구에서 토양침식량은 식생요인과 관리상태에 따라 크게 영향을 받았다. 일반적으로는 강우에너지 증가에 따라 토양침식량이 증가한다. 도로공사지역에서는 심각한 지표교란뿐만 아니라 선행강우, 세류의 존재 여부, 그리고 외부적 요인들 때문에 상대적으로 작은 규모의 강우에 대해서도 다량의 토양침식량이 발생하는 것을 확인할 수 있었다. 교란이 발생하지 않은 인근 산지의 대조구와 공사에 의한 교란 나지사면 조사구를 비교해보았을 때, 평균 토양침식량은 약 7,352배의 차이를 보였으며, 섬유매트처리 및 사면포장처리 조사구처럼 인공적인 관리를 수행한 조사구와는 약 132배의 차이를 보였다. 또한, 인공적인 관리를 수행한 조사구는 지표사면관리의 영향과 야생종의 유입으로 지표가 안정되어 나지사면 조사구에 비해 상대적으로 적은 양의 토양침식이 발생하였다. 이는 지표교란이 심한 공사활동 지역에서는 지표특성에 따른 적합한 사면 응급처리 기법의 적용이 중요함을 나타내는 것이다.

  • PDF

A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects (공동주택 리모델링 초기 단계 의사결정을 위한 확률론적 리스크 기반 비용 예측 모델 개발)

  • Lee, Dong-gun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.70-79
    • /
    • 2016
  • The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.

Analysis of Causes and Impact of Change Orders in the U.S. Military Construction Projects (미군 시설공사 설계변경 요인과 영향에 대한 연구)

  • Park, Insung;Kim, Harim;Lee, Hak-Ju;Kim, Do-Hyung;Min, Yoon-Gi;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.213-219
    • /
    • 2021
  • Change orders that occur frequently during the construction phase, af ect the construction performance in terms of cost, time, quality, safety and environment, and place a huge burden for stakeholders of given projects. This study analyzed the causes of change orders and their impact on the basis of 721 cases and a questionnaire of 164 domestic U.S. military construction participants in a total of 24 U.S. military projects. Important factors for change orders in the US military construction projects were engineering change due to design errors (348 cases, 48.3%), user requests change(86 cases, 11.9%), and different site conditions (69 cases, 9.6%). In addition, due to the change orders, construction cost increased by 6.56% on average and construction period was extended by 21.1% compared to the original schedule. As a result, it is anticipated that domestic construction companies can obtain a better understanding of change orders and construction performance, which may be difficult due to accessibility and limitations to military facilities. Also, it is proposed a successor study that guides in the right direction for the U.S. Military Construction.

The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

Direction of Selecting the Alternative considered Correlation between Building Systems in Remodeling Design Process (리모델링 설계단계에서 건축시스템 상관관계를 고려한 대안선정 방안)

  • Lee Dong-Jun;Park Chan-Gil;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.415-418
    • /
    • 2002
  • As Remodeling is proceed in the limited condition that is utilization of existing resource, the selection of remodeling objects and scope are affected by the correlation of building systems. Unexpected problems have occurred in construction phase by lack of the consideration about correlation of building systems; increasing of cost, delaying of schedule etc. Therefore, this research suggests the Building System Correlation Diagram Model and the direction of cost estimation .for selecting alternative reasonably in remodeling design process.

  • PDF

A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects (건설프로젝트의 품질결함의 발생요인간 상관분석)

  • Chi, Sungjoon;Cha, Yongwoon;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.21-28
    • /
    • 2015
  • Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.