Experimental Study on Field Applicability of Tightened Coupler with Two-Way Threading (양방향 나사산 체결방식을 활용한 완전밀착형 커플러의 시공성 분석)

  • Park, U-Yeol;Hong, Seong-Wook;Yang, Jin-Kook;Ko, Suck-Hwa;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.87-93
    • /
    • 2014
  • A tightened coupler with two way-threading is suggested to overcome the previous one-way threaded coupler. The experiment and a mock-up test were conducted to analyze the constructability of the suggested coupler. The aim of the mock-up test was to assemble the suggested coupler in horizontal rebar of mat footing and vertical rebar of semi-fabricated column bars. The method using the suggested coupler in semi-fabricated column bars is developed by analyzing the problem of fabricated column bars using the one-way threaded coupler. The result of the mock-up test showed that the time required to assemble the suggested coupler in the horizontal bars is shorter than it is for the one-way threaded coupler. In addition, the method using the suggested coupler in semi-fabricated column bars has advantages such as lower working loads, supporting safe work and strongly tightening the rebar. From these results, it is revealed that the suggested coupler is adequate to use in rebar work in terms of cost, quality and time.

Experimental Study of Flip-Bucket Type Hydraulic Energy Dissipator on Steep slope Channel (긴구배수로 감세공의 Filp Bucket형 이용연구)

  • 김영배
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.13 no.1
    • /
    • pp.2206-2217
    • /
    • 1971
  • Spillway and discharge channel of reservoirs require the Control of Large volume of water under high pressure. The energies at the downstream end of spillway or discharge channel are tremendous. Therefore, Some means of expending the energy of the high-velocity flow is required to prevent scour of the riverbed, minimize erosion, and prevent undermining structures or dam it self. This may be accomplished by Constructing an energy dissipator at the downstream end of spillway or discharge channel disigned to dissipated the excessive energy and establish safe flow Condition in the outlet channel. There are many types of energy dissipators, stilling basins are the most familar energy dissipator. In the stilling basin, most energies are dissipated by hydraulic jump. stilling basins have some length to cover hydraulic jump length. So stilling basins require much concrete works and high construction cost. Flip bucket type energy dissipators require less construction cost. If the streambed is composed of firm rock and it is certain that the scour will not progress upstream to the extent that the safety of the structure might be endangered, flip backet type energy dissipators are the most recommendable one. Following items are tested and studied with bucket radius, $R=7h_2$,(medium of $4h_2{\geqq}R{\geqq}10h_2$). 1. Allowable upstream channel slop of bucket. 2. Adequate bucket lip angle for good performance of flip bucket. Also followings are reviwed. 1. Scour by jet flow. 2. Negative pressure distribution and air movement below nappe flow. From the test and study, following results were obtained. 1. Upstream channel slope of bucket (S=H/L) should be 0.25<H/L<0.75 for good performance of flip bucket. 2. Adequated lip angle $30^{\circ}{\sim}40^{\circ}$ are more reliable than $20^{\circ}{\sim}30^{\circ}$ for the safety of structures.

  • PDF