Interior Cost Estimating as a Design Marketing Tool - for Executive Office Interior (디자인 마케팅을 위한 인테리어 공사비 초기 예측기법- 일원공간의 인테리어 프로젝트를 중심으로 -)

  • 이혜연
    • Korean Institute of Interior Design Journal
    • /
    • no.23
    • /
    • pp.68-73
    • /
    • 2000
  • The purpose of this research is to develop interior construction cost-estimating system at the early stage of the project. Though general construction estimates are typically in quantitative, interior construction should be in rather qualitative. Therefore, design-concerned cost-estimating methods should be developed to manage interior projects from the early statge. 30 estimates of VIP-Zone interior projects, were examined to develop the general type of composition and material classification. The cost has been classified by construction parts such as wall, ceiling, floor, and doors & windows and their treatments. The composition and material related estimating system (CMRES) was consisted of the unit average costs of classification and the variation coefficients. The CMRESS was verified by the case study, and the results sowed that the difference between the actual estimate and the CMRES was competitively confident.

  • PDF

A Study of the Application for Proper Construction Cost Estimating Method based on the Actual Cost Data (실적자료에 의한 적정 건축공사비 산정 방법에 관한 사례연구)

  • Cho Jae-Ho;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-386
    • /
    • 2001
  • The ability to make good cost overruns predictions is a very important aspect of in major construction project. The probabilistic cost models can provide more reliable than traditional cost models which have been used in korea to prepare Bill of Quantities, if the actual cost data are sufficient enough to analyze the trends of the variables. The paper considers non-deterministic methods in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The objectives of this research is to develop a method to forecast the probabilistic total construction cost and the elemental work cost

  • PDF

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.

Development of a Cost Index for Site Developing Project (단지조성공사용 공사비 지수의 개발)

  • Bae Keon;Lee Tai-Sik;Park Jong-Hyun;Lee Won-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.423-426
    • /
    • 2002
  • The foundation for developing a cost estimation system based on historical data has been being prepared in Korea. Historical data is a priori of developing a cost estimation model. Cost Index, one of the historical data, is used to estimate construction cost and to adjust the amount of contract money in the foreign country, whereas it is not used in domestic except for the road construction project in Korea. Construction cost indices can be used by an estimator in tender analysis, pricing, price adjustment, cost planning, and forecasting. In this regards, this paper identified the problems in developing Cost Index evaluation process by comparing the standard of framing Cost Index used in British to the one used in Korea. Then, the scheme for improving a Cost Index required for Site Developing Construction was proposed. Twenty-two cases of engineering estimate data were used to compare the domestic standard to the foreign one in deriving a Cost Index.

  • PDF

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

Computation and Verification of Approximate Construction cost of Steel Box Girder Bridge by Using Case-Based Reasoning (사례기반추론을 이용한 강박스거더교의 개략공사비 산정 및 검증)

  • Jung, Min-Sun;Kyung, Kab-Soo;Jeon, Eun-Kyoung;Kwon, Soon-Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.5
    • /
    • pp.557-568
    • /
    • 2011
  • To effectively come up with and secure a national budget, it is very important to estimate the reasonable construction cost of each step in public construction projects. In this study, the approximate construction cost of a steel box girder bridge in the early stages of the project, on which available information is limited, was proposed using case-based reasoning. In addition, construction cost estimation models were used for existing sample design models, and the accuracy of the estimation model for the presented cost was verified. The analysis results showed that the error rate was comparatively stable. Therefore, it is expected that construction cost estimation will be effectively suggested in the country's budget preparation.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.

A Method of Assigning Weight Values for Qualitative Attributes in CBR Cost Model (사례기반추론 코스트 모델의 정성변수 속성가중치 산정방법)

  • Lee, Hyun-Soo;Kim, Soo-Young;Park, Moon-Seo;Ji, Sae-Hyun;Seong, Ki-Hoon;Pyeon, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2011
  • For construction projects, the importance of early cost estimates is highly recognized by the project team and sponsoring organization because early cost estimates are frequently a foundation of business decisions as well as a basis for identifying any changes as the project progresses from design to construction. However, it is difficult to accurately estimate construction cost in the early stage of a project due to various uncertainties in construction. To deal with these uncertainties, cost estimates should be made several times over the course of the project. In particular, early cost estimates are essential process for successful project management. For accurate construction cost estimates, it is necessary to compare cost estimates with actual costs based on historical project data. In this context, case-based reasoning (CBR), which is the process of solving new problems based on the solutions of similar past problems, can be considered as an effective method for cost estimating. To obtain this, it is also required to define the attribute similarities and the attribute weights. However, no existing method is capable of determining attribute weights of qualitative variables. Consequently, it has been a well-known barrier of accurate early cost estimates. Using Genetic Algorithms (GA), this research suggests the method of determining the attribute weight of qualitative variables. Based on building project case studies, the proposed methodology was validated.