• Title/Summary/Keyword: 공사비계획

Search Result 178, Processing Time 0.02 seconds

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

Rehabilitation with the Green Method for the Huge Pipeline Using a Dry-Type Equipment (녹색공법을 이용한 대형 수도관 갱생)

  • Kim, Young-Ju;Choi, Byoung-Seub;Lee, Sang-Hyun;Hong, Dae-Sung;An, Hyo-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.282-286
    • /
    • 2009
  • 1979년 준공된 수도권 광역상수도 1단계 시설은 상당한 노후화가 진행되었을 것으로 예상되며, 또한 향후 한강하류권 용수공급계획이 예정되어 있어 내부부식 및 관로손상부 개량의 시급성이 제기되었다. 이에 따라 직경 2,800${\sim}$800mm의 초대구경 도수관 53.9km의 개량을 위한 사업이 추진되었으며 시공성, 환경성, 경제성 등의 여러 항목에 대한 검토 결과 신개념 녹색공법인 비굴착식 건식일체형 공법이 최종 선정되었다. 그동안 기존관 개량공사에서 주로 사용되었던 굴착공법이 굴착에 따른 공기지연, 소음 분진 악취 등의 환경오염, 전구간 굴착에 따른 공사비 증가 등 많은 문제점을 안고 있는 것에 반해, 동사업에서 채택된 비굴착공법은 관로내에서 작업이 이루어지므로 공기단축, 환경오염 최소화에 따른 민원발생 최소화, 작업구만 굴착함에서 오는 공사비 절감 등 상대적으로 훨씬 우수한 것으로 평가된다. 동공법에 따르면 관내부 갱생공사는 '배수 및 잔류토사 제거'${\to}$'관내건조'${\to}$'표면처리'${\to}$'프라이머도장'${\to}$'본도장'의 순으로 진행된다. 일체형 장비에 의한 이와 같은 초대형관의 자동화시공은 세계에서 처음 적용되는 것이다.

  • PDF

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.

Study of Construction Costs in South and North Korea: Focusing on Construction Cost in Ryomyong Street Project, Pyongyang (남북 건축공사비 연구: 평양 려명거리 사업 건설조립액을 중심으로)

  • Kim, Jang-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.371-378
    • /
    • 2022
  • The Ryomyong Street project is the only construction project for which the construction cost is known, but its scale cannot be estimated because it is marked in North Korean Won. In this paper, the construction cost per m2 of North Korean apartment building construction was calculated based on the construction and assembly amount of the Ryomyong Street project. 160 to 1 was calculated as the ratio of the building construction cost per m2 between South and North Korea based on the Ryomyong Street project in Pyongyang and Seoul Housing & Communities Corporation. This ratio can be used to assume the construction size presented in North Korean won as there is no official exchange rate between the two Koreas.

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

Efficient Evaluation Method of Operation Cost for Wastewater Treatment Plant by BTL Contract Type (하수처리시설 BTL사업의 합리적인 운영비 산정방안)

  • Kang, Leen Seok;Yoon, Sun MI;Kwon, Joong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.627-634
    • /
    • 2009
  • The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.

경량전철계획시 고려되어야 할 특성들

  • 이종호
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.10a
    • /
    • pp.467-476
    • /
    • 1998
  • 우리 나라에서 사용되고 있는 경량전철의 의미는 특정 대중교통수단을 지칭하기보다는 좀 더 폭넓은 의미로서 기존 지하철 또는 전철과 같이 대용량보다는 적으나, 도시버스나 직행버스와 같이 기존의 우리 나라에서 흔히 볼 수 있는 교통수단보다 용량이 큰 대중교통수단을 의미한다. 본 글에서는 각종 경량전철시스템들의 국내 적용 시 고려되어야 할 측면들을 분석한다. 수송용량, 비용, 운영, 시설, 이용자 측면에서 경량전철의 국내 적용가능성을 검토해 보고 현재 우리 나라에서 추진되고 있는 경량전철계획중 주요 문제점과 대처방안을 논한다. 현재 정부의 재원조달방안으로는 경량전철사업의 추진은 매우 어려울 것으로 보인다. 이들 타개하기 위해서는 먼저 중앙정부의 과감한 보조가 선행되어야 한다. 선진국과 같이 초기투자비에서 자기자본비율을 줄일 수 있도록 중앙정부와 해당지방자치단체에서 총 공사비의 최소 50% 이상을 지원하여야 한다. 외국에서의 운영사례와 시스템 평가경험에서 보더라도 기존 이국에서 운행되고 있는 대부분의 경량전철시스템들이 국내에서 요구하는 수송용량 등의 기본 요구사항을 만족할 수 있을 것으로 판단된다. 따라서 시스템의 선정은 시스템의 가격, 유지보수시의 국내기술적용 정도 및 국산화 등 협상시의 계약조건이 시스템이 결정에 중요한 요인이 될 것으로 보인다.

  • PDF