• Title/Summary/Keyword: 공사계약일반조건

Search Result 25, Processing Time 0.021 seconds

Risk Mitigation Methodology of the General Conditions of Contract (공사계약일반조건의 위험요인 감소방안)

  • Yoon, Chul-Sung;Kwon, Soon-O;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.177-185
    • /
    • 2005
  • Construction uncertainties are frequently exposed to the claims. In most cases, an interpretation of the claims is based on the construction contract. Therefore, the key points of contract negotiation are how to fairly distribute the contract risks to the client and contractor. For these, a FIDIC that is considered as an international standard contract form would be a good reference to decide reasonable contract risk distribution. In order to find out any unreasonable and unfair contract clauses at the general conditions of contract applying generally to public construction project in Korea, this study surveys, analyses and evaluates the general conditions of contract based on a FIDIC, and then proposes a risk mitigation methodology to response those clauses' risk factors reasonably.

A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims (국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구)

  • Jung, Min-Jung;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.239-242
    • /
    • 2007
  • Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.

  • PDF

국가계약법 회계예규 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.11 s.208
    • /
    • pp.29-40
    • /
    • 2007
  • 국가계약법 시행령이 개정됨에 따라 재정경제부는 공사계약 일반조건, 입찰조건, 입찰유의서 등 회계예규를 개정하고 지난 10월 12일부터 시행에 들어갔다. 개정된 시행규칙은 공사계약일반조건에서 설계서와 물량내역서 등의 범위에 대한 정의규정 보완/손해보험 관련 손해공제 포함/설계변경 관련 조문정리/설계변경 계약금액조정 제한대상 추가 및 입찰금액조정 규정 마련/특정규격의 자재별 가격변동에 따른 계약금액조정 관련 등이 개정되었고, 공사입찰유의서에는 입찰에 관한 서류의 열람 및 교부/입찰무효사유 보완/낙찰자가 부적격자로 판명된 경우 낙찰자 결정 방법 개선/조문정리 등이 개선되었다.

  • PDF

A Proposal of Improvement Devices for General Conditions of Contract in Claim-related Provisions (공사계약일반조건의 클레임 관련 조항의 개선방향)

  • paik, Hwa-Sook;Yang, Chang-Hyun;Yoon, Ja-Young;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.273-276
    • /
    • 2007
  • Construction work has character which claim or dispute is frequently raised. This means that each construction project has it's own contract documents due to the difference of environment and time. Therefore to overcome the associated risks, domestic contract rules and acts should be reformed. Several well-recognized contract documents developed by FIDIC, AlA, CMAA and general conditions of the contract is investigated and analyzed. Based on the research outcomes the direction of reformation is suggested.

  • PDF

An Analysis on the Problems of General Conditions for Domestic Design-Build Construction Projects (국내 설계${\cdot}$시공일괄발주방식을 위한 공사계약 일반조건의 문제점 분석)

  • Seo Young-Min;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.303-306
    • /
    • 2003
  • Although design-build construction projects have recently increased. general conditions of construction contract are not reflecting the characteristic of design-build construction projects neither performing its fundamental roles as implying many claim elements. So. this study aims to propose the basis for improving the general conditions of the domestic design-build construction projects. This study reviews literatures associated with design-build construction contract and analyses domestic general conditions into foreign standard forms of general conditions. Additionally, it is examined the problems of design-build construction contracts and performed questionnaire survey to the practitioner in the construction contract field. In doing so, this study suggests the direction for improving general conditions of domestic design-build construction projects.

  • PDF

A Study of 'Payment' related provisions in the Conditions of Contract (대가지급과 관련된 계약조건에 대한 고찰)

  • Hyun Hak-Bong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.17-22
    • /
    • 2001
  • "대가지급"은 시공자(계약상대자)가 계약의 이행을 통해 얻고자 하는 궁극적인 목적이므로 "대가지급"과 관련된 계약조건은 발주자와 시공자 모두에게 공정하고 합리적인 내용이 되어야 할 것인데 우리나라 건설계약에 적용되고 있는 "공사계약일반조건(회계예규 2200.04-104-9, 2001.2.10)"에 규정된 "대가지급" 관련 조항의 내용은 그러한 합리성이 결여되어 있는 문제점이 있다. 대표적인 문제점으로 발주자가 대가지급을 하지 못하거나 지연시키는 경우 지급지연에 따른 이자에 대한 보상규정만을 두고 있을 뿐인데 이는 국제건설계약에 적용되고 있는 계약조건에 규정된 시공자의 권리와는 너무도 큰 차이가 있다 할 것이다. 그러므로 본 고에서는 세계건설시장에서 공정성과 합리성을 인정받고 있는 FIDIC 계약조건에 규정된 "대가지급" 관련 조항의 내용들을 구체적으로 알아보고 이를 통해 우리나라 건설계약에 적용되고 있는 계약조건의 문제점을 파악함으로써 건설제도의 선진화에 일조 하고자 한다.

  • PDF

물가변동 - 물가변동 관련 질의응답 (4)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.278
    • /
    • pp.67-69
    • /
    • 2013
  • 입찰 후 계약금액을 구성하는 각종 품목 또는 비목의 가격이 상승 또는 하락된 경우 그에 따라 계약금액을 조정하는 것을 '물가변동으로 인한 계약금액 조정'이라 한다. 이와 관련된 규정으로는 국가계약법의 국가계약법 시행령, 공사계약일반조건, 정부 입찰 계약 집행기준, 기타 관계법규, 회계통첩 및 지침이 있고, 지방계약법으로는 지방계약법 시행령 시행규칙, 지방자치단체 입찰 및 계약집행기준이 적용되는 등 매우 광범위하고 복잡하다. 이에 따라 조달청은 물가변동과 관련한 계약 업무에 도움을 주기 위해 질의응답집을 발간하고 있다. 본지는 조달청이 최근에 발간한 '물가변동 검토실무와 질의응답집(2012)'에 수록된 Q&A 사례를 게재한다.

  • PDF

물가변동 - 물가변동 관련 질의응답(8)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.298
    • /
    • pp.89-95
    • /
    • 2015
  • 입찰 후 계약금액을 구성하는 각종 품목 또는 비목의 가격이 상승 또는 하락된 경우 그에 따라 계약금액을 조정하는 것을 '물가변동으로 인한 계약금액 조정'이라 한다. 이와 관련된 규정으로는 국가계약법의 국가계약법 시행령, 공사계약일반조건, 정부 입찰 계약 집행기준, 기타 관계법규, 회계통첩 및 지침이 있고, 지방계약법으로는 지방계약법 시행령 시행규칙, 지방자치단체 입찰 및 계약집행기준이 적용되는 등 매우 광범위하고 복잡하다. 이에 따라 조달청은 물가변동과 관련한 계약 업무에 도움을 주기 위해 질의응답집을 발간하고 있다. 본지는 조달청이 최근에 발간한 '물가변동 검토실무와 질의응답집(2012)'에 수록된 Q&A 사례를 게재한다.

  • PDF

물가변동 - 물가변동 관련 질의응답 (5)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.280
    • /
    • pp.74-75
    • /
    • 2013
  • 입찰 후 계약금액을 구성하는 각종 품목 또는 비목의 가격이 상승 또는 하락된 경우 그에 따라 계약금액을 조정하는 것을 '물가변동으로 인한 계약금액 조정'이라 한다. 이와 관련된 규정으로는 국가계약법의 국가계약법 시행령, 공사계약일반조건, 정부 입찰 계약 집행기준, 기타 관계법규, 회계통첩 및 지침이 있고, 지방계약법으로는 지방계약법 시행령 시행규칙, 지방자치단체 입찰 및 계약집행기준이 적용되는 등 매우 광범위하고 복잡하다. 이에 따라 조달청은 물가변동과 관련한 계약 업무에 도움을 주기 위해 질의응답집을 발간하고 있다. 본지는 조달청이 최근에 발간한 '물가변동 검토실무와 질의응답집(2012)'에 수록된 Q&A 사례를 게재한다.

  • PDF

물가변동 - 물가변동 관련 질의응답(7)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.293
    • /
    • pp.109-113
    • /
    • 2014
  • 입찰 후 계약금액을 구성하는 각종 품목 또는 비목의 가격이 상승 또는 하락된 경우 그에 따라 계약금액을 조정하는 것을 '물가변동으로 인한 계약금액 조정'이라 한다. 이와 관련된 규정으로는 국가계약법의 국가계약법 시행령, 공사계약일반조건, 정부 입찰 계약 집행기준, 기타 관계법규, 회계통첩 및 지침이 있고, 지방계약법으로는 지방계약법 시행령 시행규칙, 지방 자치단체 입찰 및 계약집행기준이 적용되는 등 매우 광범위하고 복잡하다. 이에 따라 조달청은 물가변동과 관련한 계약 업무에 도움을 주기 위해 질의응답집을 발간하고 있다. 본지는 조달청이 최근에 발간한 '물가변동 검토실무와 질의응답집(2012)'에 수록된 Q&A 사례를 게재한다.

  • PDF