• Title/Summary/Keyword: 고장모드해석(FMEA)

Search Result 3, Processing Time 0.017 seconds

Failure Mode Analysis of Molded Case Circuit Breakers for the Reliability Assessment (배선용차단기의 신뢰성평가를 위한 고장모드해석)

  • Kim, Min-Kyu;Lee, Jeong-Gi;Jeong, Ju-Young;Kim, Ik-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2004.07c
    • /
    • pp.1994-1996
    • /
    • 2004
  • 본 논문에서는 배전반 또는 분전반에서 널리 이용되고 있는 1000 V 이하의 배선용 차단기, 즉 MCCB(Molded Case Circuit Breakers)의 신뢰성을 평가하기 위한 시험계획 및 시험방법을 검토하기 위한 전단계에서 반드시 필요한 고장모드영향분석(FMEA)의 결과를 서술하고, 또한 고장모드별로 대응되는 스트레스를 이용한 신뢰성평가 방안에 대해서 제시한다.

  • PDF

다목적실용위성 2호기 신뢰성 및 FMECA

  • Lee, Chang-Ho
    • Aerospace Engineering and Technology
    • /
    • v.2 no.1
    • /
    • pp.44-53
    • /
    • 2003
  • The purpose of reliability prediction is to estimate the basic reliability and basic reliability and mission reliability of system and to make a determination of whether these reliability requirements can be achieved with the proposed design. Also, potential design weakness can be identified through the FMECA process. This technical memo summarizes the KOMPSAT-2 reliability and FMECA analysis results.

  • PDF

A Study on the Risk Evaluation of Construction Management Based on Risk Identification (위험도 기반 건설경영 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Lee, Gun;Yeo, Sang-Ku;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.83-91
    • /
    • 2009
  • Construction industry is a complex industry which should be invested with plenty capital, manpower and resources. Investment factors and inner and outer environmental factors should be managed systemically in terms with risk factors possible to occur. It maximizes the profit to establish construction management by managing risk systemically. While previous studies were executed with risk related to some special progress lively, studies about risk in managing construction company leave much to be desired. Therefore, this study examined risk in the whole construction management, showed the checklist and deduced the quantitative factors through questionnaire analysis from specialists. Also, priority and grade of construction management factors were evaluated by analyzing weight of construction risk factors.