• Title/Summary/Keyword: 고속도로 합류부

Search Result 38, Processing Time 0.023 seconds

Effectiveness Analysis of Improved Passing Method Considering Traffic Pattern on Climbing Lane (오르막차로 통행방법 개선에 따른 효과분석)

  • Lee, Eui-Joon;Park, Kwon-Je;Han, Ki-Hwan;Baek, Kyong-Min
    • International Journal of Highway Engineering
    • /
    • v.12 no.2
    • /
    • pp.91-97
    • /
    • 2010
  • This study started from the problem recognition of climbing lane installed in Korea roads. Because design standards of climbing lane installed don't match traffic pattern of korean drivers, coefficient of utilization of climbing lane is low and merging section between climbing lane and main lane has traffic accident possibilities. For this, brand-new design standards developed from the present lane design criterion, taper lenghs, and traffic signs, then field adoption test was carried out to prove the effectiveness. As a result, coefficient of utilization of climbing lane and average traffic velocity in climbing section are improved and the economic analysis also shows that brand-new standards has high feasibility for low cost. In case of broad application to not only expressway but national and local road based on the study, it could be a significant contribution to traffic flow improvement.

Construction of Speed Predictive Models on Freeway Ramp Junctions with 70mph Speed Limit (70mph 제한속도를 갖는 고속도로 연결로 접속부상에서의 속도추정모형에 관한 연구)

  • 김승길;김태곤
    • Journal of Korean Port Research
    • /
    • v.14 no.1
    • /
    • pp.66-75
    • /
    • 2000
  • From the traffic analysis, and model constructions and verifications for speed prediction on the freeway ramp junctions with 70mph speed limit, the following results were obtained : ⅰ) The traffic flow distribution showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy distribution was also shown to be varied by a big difference depending on the time periods. Especially, the occupancy in the morning peak period showed over 100% increase when compared with the 24hours average occupancy, and the occupancy in the afternoon peak period over 25% increase when compared with the same occupancy. ⅲ) The speed distribution was not shown to have a big difference depending on the time periods. Especially, the speed in the morning peak period showed 10mph decrease when compared with the 24hours'average speed, but the speed did not show a big difference in the afternoon peak period. ⅳ) The analyses of variance showed a high explanatory power between the speed predictive models(SPM) constructed and the variables used, especially the upstream speed. ⅴ) The analysis of correlation for verifying the speed predictive models(SPM) constructed on the ramp junctions were shown to have a high correlation between observed data and predicted data. Especially, the correlation coefficients showed over 0.95 excluding the unstable condition on the diverge section. ⅵ) Speed predictive models constructed were shown to have the better results than the HCM models, even if the speed limits on the freeway were different between the HCM models and speed predictive models constructed.

  • PDF

Construction of Delay Predictive Models on Freeway Ramp Junctions (고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구)

  • 김정훈;김태곤
    • Journal of Korean Port Research
    • /
    • v.14 no.2
    • /
    • pp.175-185
    • /
    • 2000
  • Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the purpose of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the rap junctions of freeway with 70mph speed limit. From the traffic analyses, and model construction and verification for delay prediction on the ramp junctions of freeway, the following results were obtained : ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junctions of freeway. ⅲ) The delay-occupancy curve showed a remarkable shift based on the occupancies observed : O$\_$d/〈9% and O$\_$d/$\geq$9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under O$\_$d/$\geq$9%, but lowly for delay prediction on the ramp junctions of freeway under O$\_$d/〈9%. Rather, the driver characteristics or transportation conditions around the freeway were thought to be a little higher explanatory for the delay prediction under O$\_$d/〈9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

  • PDF

Construction of Speed Predictive Models on Freeway Ramp Junctions with 70mph Speed Limit. (70mph 제한속도를 갖는 고속도로 연결로 접속부상에서의 속도추정모형에 관한 연구)

  • 김승길;김태곤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.111-121
    • /
    • 1999
  • From the traffic analyses, and model constructions and verifications for speed prediction on the freeway ramp junctions with 70mph speed limit, the following results obtained: ⅰ) The traffic flow distribution showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy distribution was also shown to be varied by a big difference depending on the time periods. Especially, the occupancy in the morning peak period showed over 100% increase when compared with the 24hours average occupancy, and the occupancy in the afternoon peak period over 25% increase when compared with the same occupancy.ⅲ) The speed distribution was not shown to have a big difference depending on the time periods. Especially, the speed in the morning peak period shown 10mph decrease when compared with the 24hours' average speed, but the speed did not show a big difference in the afternoon peak period.ⅳ) The analyses of variance showed a high explanatory power between the speed predictive models(SPM) constructed and the variables used, especially the upstream speed. ⅴ) The analysis of correlation for verifying the speed predictive models(SPM) constructed on the ramp junctions were shown to have a high correlation between observed data and predicted data. Especially, the correlation coefficients showed over 0.95 excluding the unstable condition on the diverge sectionⅵ) Speed predictive models constructed were shown to have the better results than the HCM models, even if the speed limits on the freeway were different between the HCM models and speed predictive models constructed.

GHGs Emissions Calculation Method and Influence Factors (온실가스 배출량 산정 방법 및 영향 요인 연구)

  • Choi, Seonghun;Chang, Hyunho;Yoon, Byungjo
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.550-557
    • /
    • 2020
  • Purpose: Greenhouse gases are one of the major causes of global warming, a global disaster. In this study, the priority that affects when calculating the GHG emissions in the road sector is accurately calculated based on the speed of individual vehicles from the existing section average speed. I have the purpose of finding a possible factor. Method: A comparative analysis is conducted between the conventional method of the general passage section, the rest area section, the entrance section, and the confluence section of the highway and the speed-based emission calculation method of individual vehicles. Result: As a result of analyzing a total of 6 sections of the Gyeongbu Expressway, it was found that the standard deviation of the speed and the congestion of the sections had a great influence. Conclusion: When comparing the existing GHG emission calculation method with the speed-based emission calculation method of individual vehicles, it is clear that the speed-based method of individual vehicles is more precise. However, since it is difficult to apply it all over the country, this study compares the existing method with the speed-based method of individual vehicles and presents factors that have a significant difference.

Determination of Base Capacity Values for Short-Term Freeway Work Zone (고속도로 단기공사구간 기본용량 결정에 관한 연구)

  • Kim, Sang Gu;Hong, Gil Seong
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.37-46
    • /
    • 2013
  • Lane closure in freeway work zone due to maintenance and repair of freeway facilities results in abrupt change of traffic flow. Sudden change of traffic flow results strong interactions among vehicles, and reduces capacity compared to the ordinary traffic condition. Such capacity reduction is likely to cause congestion, traffic queues, and economic loss cost. This study aims to determine the base capacity for a short-term freeway work zone that can be used to establish a work zone schedule in advance without any traffic impact. First, the research collected detector data and schedule data of road works on all freeways in Korea. Second, the research determined 23 study sites finding the capacity values of work zone after matching two kinds of data. All study sites had varying characteristics regarding traffic flow being adjacent to work zone during road works. The capacity values were reviewed in terms of lane closure configuration, the types of work, and design speed. Finally, research proposed capacity values for a short-term freeway work zone with the design speeds of 100 kph, 120 kph and 1,700 pcphpl, 1,750 pcphpl, respectively.

The Ramp Metering System Construction of Urban Freeway by the Intelligent Transportation System (ITS) Technology (첨단교통체계(ITS)에 의한 도시고속도록의 Ramp Metering 시스템 구축에 관한 연구)

  • 김태곤
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.333-350
    • /
    • 1999
  • Today freeway is thought to be a very important transportation facility carrying tremendous traffic flow as the main corridor within the area of between the areas. However freeway is experiencing severe congestion and accidents by increased entrance ramp flow especially at peak time period. Ramp meters on the freeway entrance ramps that supply traffic to the freeway in a measured or appropriately regulated amount are needed for alleviating freeway congestion. Because ramp meters can be operated to discharge traffic at a measured or regulated rate thus maintaining more uniform speed on the mainline section maximizing the throughput to the freeway within the capacity of a downstream bottleneck and reducing the congestion related accidents. Thus the objectives in this study were to analyze the traffic characteristics on the freeway I-94 with ramp metering system before/after ITS technology in Detroit (Michigan) area compare shifts of the traffic characteristics on the freeway I-94 before/after ITS technology and finally suggest a better ramp metering strategy for the freeway system The following results were obtained: i)Flow occupancies and speeds on the mainline merge section of freeway were shown to be a big difference depending on the peak periods areas and directions based on the distribution of traffic flow characteristics on the freeway. ii)Reduced speed was shown to be more than 5 mph and ramp flow was also shown to be more than 240 vph at peak periods if there was the ramp metering system constructed on the freeway. iii)Ramp metering system was shown to be optimally operated on the freeway if ramp flow could be maximized within the range of over 900 vph and reduced occupancy could be also maximized by no more than 2 percent at peak periods. iv)The average flows on the freeway after the ITS technology were shown to be a decrease of over 20% depending on the peak periods areas and directions when compared with those flow on the freeway before the ITS technology. over 20% depending on the peak periods areas and directions when compared with those speeds on the freeway before the ITS technology. vi)The average metering rates on the freeway after the ITS technology were shown to be an increase of over 10% depending on the peak periods areas and directions when compared with those metering rates on the freeway before the ITS technology.

  • PDF

Dynamic Network Loading Model based on Moving Cell Theory (Moving Cell Theory를 이용한 동적 교통망 부하 모형의 개발)

  • 김현명
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.5
    • /
    • pp.113-130
    • /
    • 2002
  • In this paper, we developed DNL(Dynamic Network Loading) model based on Moving cell theory to analyze the dynamic characteristics of traffic flow in congested network. In this paper vehicles entered into link at same interval would construct one cell, and the cells moved according to Cell following rule. In the past researches relating to DNL model a continuous single link is separated into two sections such as running section and queuing section to describe physical queue so that various dynamic states generated in real link are only simplified by running and queuing state. However, the approach has some difficulties in simulating various dynamic flow characteristics. To overcome these problems, we present Moving cell theory which is developed by combining Car following theory and Lagrangian method mainly using for the analysis of air pollutants dispersion. In Moving cell theory platoons are represented by cells and each cell is processed by Cell following theory. This type of simulation model is firstly presented by Cremer et al(1999). However they did not develop merging and diverging model because their model was applied to basic freeway section. Moreover they set the number of vehicles which can be included in one cell in one interval so this formulation cant apply to signalized intersection in urban network. To solve these difficulties we develop new approach using Moving cell theory and simulate traffic flow dynamics continuously by movement and state transition of the cells. The developed model are played on simple network including merging and diverging section and it shows improved abilities to describe flow dynamics comparing past DNL models.