• Title/Summary/Keyword: 계측의 불확실성

Search Result 118, Processing Time 0.028 seconds

Measurement of Two-Dimensional Velocity Distribution of Spatio-Temporal Image Velocimeter using Cross-Correlation Analysis (상호상관법을 이용한 시공간 영상유속계의 2차원 유속분포 측정)

  • Yu, Kwonkyu;Kim, Seojun;Kim, Dongsu
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.537-546
    • /
    • 2014
  • Surface image velocimetry was introduced as an efficient and sage alternative to conventional river flow measurement methods during floods. The conventional surface image velocimetry uses a pair of images to estimate velocity fields using cross-correlation analysis. This method is appropriate to analyzing images taken with a short time interval. It, however, has some drawbacks; it takes a while to analyze images for the verage velocity of long time intervals and is prone to include errors or uncertainties due to flow characteristics and/or image taking conditions. Methods using spatio-temporal images, called STIV, were developed to overcome the drawbacks of conventional surface image velocimetry. The grayscale-gradient tensor method, one of various STIVs, has shown to be effectively reducing the analysis time and is fairly insusceptible to any measurement noise. It, unfortunately, can only be applied to the main flow direction. This means that it can not measure any two-dimensional flow field, e.g. flow in the vicinity of river structures and flow around river bends. The present study aimed to develop a new method of analyzing spatio-temporal images in two-dimension using cross-correlation analysis. Unlike the conventional STIV, the developed method can be used to measure two-dimensional flow substantially. The method also has very high spatial resolution and reduces the analysis time. A verification test using artificial images with lid-driven cavity flow showed that the maximum error of the method is less than 10 % and the average error is less than 5 %. This means that the developed scheme seems to be fairly accurate, even for two-dimensional flow.

The Study on the Confidence Building for Evaluation Methods of a Fracture System and Its Hydraulic Conductivity (단열체계 및 수리전도도의 해석신뢰도 향상을 위한 평가방법 연구)

  • Cho Sung-Il;Kim Chun-Soo;Bae Dae-Seok;Kim Kyung-Su;Song Moo-Young
    • The Journal of Engineering Geology
    • /
    • v.15 no.2 s.42
    • /
    • pp.213-227
    • /
    • 2005
  • This study aims to assess the problems with investigation method and to suggest the complementary solutions by comparing the predicted data from surface investigation with the outcome data from underground cavern. In the study area, one(NE-1) of 6 fracture zones predicted during the surface investigation was only confirmed in underground caverns. Therefore, it is necessary to improve the confidence level for prediction. In this study, the fracture classification criteria was quantitatively suggested on the basis of the BHTV images of NE-1 fracture zone. The major orientation of background fractures in rock mass was changed at the depth of the storage cavern, the length and intensity were decreased. These characteristics result in the deviation of predieted predicted fracture properties and generate the investigation bias depending on the bore hole directions and investigated scales. The evaluation of hydraulic connectivity in the surface investigation stage needs to be analyze by the groundwater pressures and hydrochemical properties from the monitoring bore hole(s) equipped with a double completion or multi-packer system during the test bore hole is pumping or injecting. The hydraulic conductivities in geometric mean measured in the underground caverns are 2-3 times lower than those from the surface and furthermore the horizontal hydraulic conductivity in geometric mean is six times lower than the vertical one. To improve confidence level of the hydraulic conductivity, the orientation of test hole should be considered during the analysis of the hydraulic conductivity and the methodology of hydro-testing and interpretation should be based on the characteristics of rock mass and investigation purposes.

Development of Modeling to Find the Hub Nodes on Growing Scale-free Network based on Stochastic Community Bridge Node Finder (확장하는 Scale-free 네트워크에서의 허브노드 도출을 위한 Stochastic Community Bridge Node Finder 개발)

  • Eun, Sang-Kyu;Kim, Soo-Jin;Bae, Seung-Jong;Kim, Dae-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.1
    • /
    • pp.1-10
    • /
    • 2017
  • The community bridge node finder, based on the stochastic method of network analysis, can compute hubs spot, which would enable the use of network structures with limited information. However, applying this node finder to heterogeneity networks, which are efficient to analyze the main farm complex in fields and the spread of infectious disease, is difficult. These problems, The most connected point that is called hub is often a major role in the heterogeneity network. In this study, we therefore improved the community bridge node finder to enable it to be applied to heterogeneity networks. We attempted to calculate the bridge node quantitatively by using the modularity of cohesion analysis method and the community bridge node finder. Application of the improved method to the HPAI(Highly Pathogenic Avian Influenza) spread in Korea 2008 produced a quarantine coefficient that was 4 - 37% higher than the quarantine coefficient obtained with the centrality method for the first 14 days after the HPAI outbreak. We concluded that the improved method has the ability to successfully calculate the bridge node in heterogeneity networks based on network structures with scant information, such as those describing the spread of infectious disease in domestic animals. And Our method should be capable to find main farm complex in fields.

Evaluation of Available Water Resources of Soyang Reservoir and Chungju Reservoir according to Climate Change Scenarios (기후변화 시나리오에 따른 소양강댐과 충주댐의 가용수자원 평가)

  • Choi, Sung-Gyu;Yi, Jae-Eung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.147-151
    • /
    • 2007
  • 인위적인 온실가스 증가의 영향으로 지구의 기온이 상승하고 있으며, 우리나라에서도 이러한 전 지구적인 온난화 추세를 상회하는 경향을 보이고 있다. 20세기 후반부터 기후변화에 따른 강수량 및 집중호우의 증가 추세가 보고되고 있으며, 이에 따른 피해 또한 증가하고 있다. 이러한 이상기후 현상이 전 세계적으로 빈번히 발생하여 가용 수자원의 변동이 커지고 있다. 추가적인 댐 건설이 어려운 상황이고, 댐 운영의 불확실성에 의한 현실적인 운영의 어려움으로 인하여 보수적인 댐 운영이 이루어지고 있는 실정이므로, 한정된 수자원의 효율적인 이용과 예측이 요구되고 있다. 본 연구에서는 기상연구소에서 개발된 A2, B2 기후변화 시나리오에 따른 다목적댐에서의 용수공급능력의 변화에 대한 평가를 수행하였다. 대규모 유역의 대표적인 다목적댐을 선정하고 기후변화 시나리오별 유입량을 분석하였으며, 이를 저수지 모의운영 기법을 이용하여 기후변화 시나리오에 따른 각 댐의 신뢰도 95% 용수공급능력과 예상발전량을 산정함으로써 가용수자원을 평가하였다. 또한 다목적댐의 과거 실적 유입량 자료를 이용한 모의운영 결과와 비교하여 제시하였다. 과거 실적에 의한 결과와 비교할 때, 기후변화 시나리오에 따른 향후 국내 가용 수자원량에도 큰 변화가 있을 것으로 예측되었다. 이로부터 댐 운영에 있어서 홍수기의 안정적인 댐관리와 갈수기의 적절한 수자원 분배를 위한 방향을 제시할 수 있다. 본 연구의 결과는 향후 기후변화에 따른 저수지의 효율적인 운영을 위한 유역의 수자원 영향 평가에 활용할 수 있을 것으로 기대된다.댐의 순기능에 대한 정량적인 분석을 수행하였다. 또한 댐별 방류량을 변동하여 하류 주요지점에 미치는 유황개선효과를 정량화하였다. 마지막으로 댐의 효율을 최대화한 하류확보가능하천유지유량을 월별평균량으로 산정하였다. 이는 향후 오염총량제 기준유량 및 환경용수의 법제화를 통한 하천유지용수의 증가시 비구조적 대책의 공급가능 최대량으로 활용가능할 것으로 사료된다.원에서 인위적으로 방류한 양이 많았기 때문으로 추정할 수 있다. 두 지점의 1월 유출이 100 % 이상인 것은 동절기 하천 결빙으로 인한 유량파악이 힘든 것으로 나타났다. 1월의 하천수위는 계측기에 기록된 수위값으로 유량을 산정한 것이다. 3월, 10월, 12월의 유출이 많은 것은 전월말 발생한 강우의 영향으로 크게 나타났다.다. 5. 초장의 절대치는 품종간에 차이는 있으나 비교적 조파구간에는 초장에 큰 변이가 없었고 파종기가 늦어짐에 따라 짧아졌다. 초장의 신장속도는 파종기가 늦어짐에 따라 현저하게 빨라지고 특히 조생종이 만생종보다 더욱 가속적인 경향이었다. 따라서 최고초장과 최저초장과의 절대치의 차이는 조생종일수록 적고 만생종일수록 큰 격차를 보이었다. 6. 간직경에 있어서도 만생종은 일반적으로 조기파종할수록 굵고, 조생종과 중생종은 4월 25일 파종기가 가장 굵은 편이며 이보다 파종기가 지연 가늘어지는 경향이었다. 7. 간중은 품종의 조만생에 따라 약간의 차이는 있으나 대체로 적기(4월 25일~5월 15일)보다 조기 혹은 만기 파종하면 작아지나 파종기 이동에 따른 간중의 변화는 품종의 조만성에 따라 양상을 달리하여 조생종은

  • PDF

3-Dimensional Tunnel Analyses for the Prediction of Fault Zones (파쇄대 예측을 위한 터널의 3차원 수치해석)

  • 이인모;김돈희;이석원;박영진;안형준
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.99-112
    • /
    • 1999
  • When there exists a fault zone ahead of the tunnel face and a tunnel is excavated without perceiving its existence, it will cause stress concentration in the region between the tunnel face and the fault zone because of the influence of the fault zone on the arching phenomena. Because the underground structure has many unreliable factors in the design stage, the prediction of a fault zone ahead of the tunnel face by monitoring plans during tunnel construction and the rapid establishment of appropriate support system are required for more economical and safer tunnel construction. Recent study shows that longitudinal displacement changes during excavation due to the change of rock property, and if longitudinal displacement and settlement, which are measured in the field, are considered together in displacement analysis, the prediction of change in rock mass property is possible. This study provided the method for the prediction of fault zones by analyzing the changes of L/C and (Ll-Lr)/C ratio (L= longitudinal displacement at crown, C = settlement at crown, Ll = longitudinal displacement at left sidewall, Lr = longitudinal displacement at right sidewall) and the stereographic projection of displacement vectors which were obtained from the 3-D numerical analysis of hybrid method in various initial stress conditions.

  • PDF

Optimum Design of Soil Nailing Excavation Wall System Using Genetic Algorithm and Neural Network Theory (유전자 알고리즘 및 인공신경망 이론을 이용한 쏘일네일링 굴착벽체 시스템의 최적설계)

  • 김홍택;황정순;박성원;유한규
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.113-132
    • /
    • 1999
  • Recently in Korea, application of the soil nailing is gradually extended to the sites of excavations and slopes having various ground conditions and field characteristics. Design of the soil nailing is generally carried out in two steps, The First step is to examine the minimum safety factor against a sliding of the reinforced nailed-soil mass based on the limit equilibrium approach, and the second step is to check the maximum displacement expected to occur at facing using the numerical analysis technique. However, design parameters related to the soil nailing system are so various that a reliable design method considering interrelationships between these design parameters is continuously necessary. Additionally, taking into account the anisotropic characteristics of in-situ grounds, disturbances in collecting the soil samples and errors in measurements, a systematic analysis of the field measurement data as well as a rational technique of the optimum design is required to improve with respect to economical efficiency. As a part of these purposes, in the present study, a procedure for the optimum design of a soil nailing excavation wall system is proposed. Focusing on a minimization of the expenses in construction, the optimum design procedure is formulated based on the genetic algorithm. Neural network theory is further adopted in predicting the maximum horizontal displacement at a shotcrete facing. Using the proposed procedure, various effects of relevant design parameters are also analyzed. Finally, an optimized design section is compared with the existing design section at the excavation site being constructed, in order to verify a validity of the proposed procedure.

  • PDF

Evaluation of the Standard Support Pattern in Large Section Tunnel by Numerical Analysis and Field Measurement (수치해석 및 현장계측에 의한 대단면 터널 표준지보패턴의 적정성 검증)

  • Byun, Yoseph;Chung, Sungrae;Song, Simyung;Chun, Byungsik;Park, Duhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.7
    • /
    • pp.5-12
    • /
    • 2011
  • When choosing the support pattern of tunnel, the characteristics of rock are identified from the result of the surface geologic survey, boring, and geophysical prospecting and laboratory test. And a rock mass rating is classified and excavation method and standard support pattern are designed considering rock classification, domestic and international construction practices, numerical analysis. According to the revised design standard for tunnel, it was recommended to classify the rock mass rating for the design of tunnel into a rating based on RMR. If necessary, it proposed a flexible standard allowed applying more atomized the rock mass rating and Q-System. Also, the resonable verification of the support pattern must be accompanied because the factors affecting the structure and behavior of ground during the construction of tunnel are the main factors of uncertainty factors such as the nature of ground, ground water and the characteristics of structural materials. These days, such verification method is getting more specialized and diversified. In this study, the empirical method, numerical analysis and comparative analysis of in situ measurements were used to prove the reasonableness in the support pattern by RMR and Q-value on the Imha Dam emergency spillway.

Error Analysis of Image Velocimetry According to the Variation of the Interrogation Area (상관영역 크기 변화에 따른 영상유속계의 오차 분석)

  • Kim, Seojun;Yu, Kwonkyu;Yoon, Byungman
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.8
    • /
    • pp.821-831
    • /
    • 2013
  • Recently image velocimetries, including particle image velocimetry (PIV) and surface image velocimetry (SIV), are often used to measure flow velocities in laboratories and rivers. The most difficult point in using image velocimetries may be how to determine the sizes of the interrogation areas and the measurement uncertainties. Especially, it is a little hard for unskilled users to use these instruments, since any standardized measuring techniques or measurement uncertainties are not well evaluated. Sometimes the user's skill and understanding on the instruments may make a wide gap between velocity measurement results. The present study aims to evaluate image velocimetry's uncertainties due to the changes in the sizes of interrogation areas and searching areas with the error analyses. For the purpose, we generated 12 series of artificial images with known velocity fields and various numbers and sizes of particles. The analysis results showed that the accuracy of velocity measurements of the image velocimetry was significantly affected by the change of the size of interrogation area. Generally speaking, the error was reduced as the size of interrogation areas became small. For the same sizes of interrogation areas, the larger particle sizes and the larger number of particles resulted smaller errors. Especially, the errors of the image velocimetries were more affected by the number of particles rather than the sizes of them. As the sizes of interrogation areas were increased, the differences between the maximum and the minimum errors seemed to be reduced. For the size of the interrogation area whose average errors were less than 5%, the differences between the maximum and the minimum errors seemed a little large. For the case, in other words, the uncertainty of the velocity measurements of the image velocimetry was large. In the viewpoint of the particle density, the size of the interrogation area was small for large particle density cases. For the cases of large number of particle and small particle density, however, the minimum size of interrogation area became smaller.