A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

Independent Production Routines and Environmental Changes In 'Comprehensive Programming Television Channels' in Korea Focusing on Interviews with Independent Producers, Broadcast Writers and Individuals Involved with the TV Channels (종합편성채널의 독립제작 환경과 관행에 관한 연구 독립PD, 작가 및 종합편성채널 관계자 심층인터뷰를 중심으로)

  • Choi, Sun Young;Han, Hee Jeong
    • Korean journal of communication and information
    • /
    • v.73
    • /
    • pp.56-91
    • /
    • 2015
  • This study examined changes in the independent production environment in the perspectives from flexible specialization of labor and media routines since January 2011, when comprehensive programming television channels (JTBC, MBN, Channel A, TV Chosun) emerged in Korea. In-depth interviews were conducted with thirteen individuals, including producers from independent production companies, broadcast writers, and individuals involved with these TV channels. The interview results indicated that a flexible specialization production system had been established by the comprehensive programming channels. This means that they were heavily dependent on independent producers, except in relations to their own news programs. Moreover, it was identified that the production of diverse programs could be difficult due to absurd contract practices such as those related to TV ratings and performance systems. Second, these channels have implemented some positive changes such as the payment of higher production costs and an incentive system, compared to terrestrial TV stations. However, the incentive system also helps to aggravate internal competition in the channel and also instigate contract competitions among independent companies, which can eventually result in the channels for holding exclusive rights to certain content and, hence, unfair business practices. Third, as a result of the newspaper and broadcast cross-owenership system of the comprehensive programming channels, hierarchical independent production practices can be established under the influence of newspaper proprietors and executives or managers who have previously worked for newspapers. Lastly, as a result of interviews with independent producers and individuals involved with the TV channels concerning the awareness of comprehensive programming channels, it could not be ascertained whether it is difficult to produce programs dealing with diverse items and genres, because programming autonomy has been distorted by capital or the advertisement market. In this circumstance, it is not surprising that some comprehensive programming channels mentioned that they prioritize profit and performance in programming. In conclusion, it is absolutely imperative that complementary and legal measures be implemented institutionally in order to redress the existing systematic dysfunctional routines in the independent productions of the comprehensive programming TV channels in Korea.

  • PDF

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

Payment Refusal against Discrepancy in Transport Document under L/C Transaction (신용장거래에서 운송서류 불일치에 대한 지급거절)

  • Lee, Jung-Sun
    • Korea Trade Review
    • /
    • v.42 no.2
    • /
    • pp.205-225
    • /
    • 2017
  • The study attempts to verify the case related to the notice of payment refusal by issuing bank regarding discrepancy in transport document under L/C(Letter of Credit) transaction. Considering the high portion of trade between Korea and China, Korean companies and banks in L/C transaction should be careful about many unpredictable situations. The case of this study is that Chinese seller(beneficiary) initiated a civil suit against Industrial Bank of Korea to Chinese court and Chinese courts in the first and second trials judged that the notice of payment refusal by Industrial bank of Korea doesn't satisfy Article 16, (c) (ii) (iii) in UCP 600. However, Industrial Bank of Korea implements the judgement even though the judgement is highly biased to Chinese seller. Considering the judgement by Chinese courts, the study suggests some countermeasures to Korean companies and banks which opened L/C. First, the issuing bank should describe the contents of discrepancy specifically based on Article 16, (c) in UCP 600. Second, it is necessary to insert a clause regarding governing law in the L/C contract like sales contract. Third, considering the biased judgement by Chinese court and difficulty in execution of foreign judgement in China, it is recommended to using arbitration as a method of dispute resolution such as ICLOCA and DOCDEX Rules which are international system operated by international instruments because it has legal effects to parties in L/C contracts if the issuing bank inserts arbitration clause in L/C.

  • PDF

A Study on the Legal Explanation and Cases of the Buyer's Obligation to Pay the Price for the Goods under CISG (CISG하에서 매수인의 물품대금지급 의무에 관한 법적 기준과 판결례에 관한 고찰)

  • Shim, Chong-Seok
    • International Commerce and Information Review
    • /
    • v.15 no.3
    • /
    • pp.199-224
    • /
    • 2013
  • Section I of Chapter III ('Obligations of the Buyer') in Part III ('Sale of Goods') of the CISG consists of six articles addressing one of the fundamental buyer obligations described in article 53 of the CISG: the obligation to pay the price. Although the amount of the price that the buyer must pay is usually specified in the contract, two articles in Section I contain rules governing the amount of the price in particular special circumstances: article 55 specifies a price when one is not fixed or provided for in the contract, and article 56 specifies the way to determine the price when it is 'fixed according to the weight of the goods'. The remaining four provisions in Section I relate to the manner of paying the price: they include rules on the buyer's obligation to take steps preparatory to and to comply with formalities required for paying the price (article 54); provisions on the place of payment (article 57) and the time for payment (article 58); and an article dispensing with the need for a formal demand for payment by the seller (article 59). Especially article 53 states the principal obligations of the buyer, and serves as an introduction to the provisions of Chapter III. As the CISG does not define what constitutes a 'sale of goods', article 53, in combination with article 30, also sheds light on this matter. The principal obligations of the buyer are to pay the price for and take delivery of the goods 'as required by the contract and this CISG'. From this phrase, as well as from article six of the CISG, it follows that, where the contract provides for the performance to take place in a manner that differs from that set forth in the CISG, the parties' agreement prevails.

  • PDF

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

A Study on the Types of Dispute and its Solution through the Analysis on the Disputes Case of Franchise (프랜차이즈 분쟁사례 분석을 통한 분쟁의 유형과 해결에 관한 연구)

  • Kim, Kyu Won;Lee, Jae Han;Lim, Hyun Cheol
    • The Korean Journal of Franchise Management
    • /
    • v.2 no.1
    • /
    • pp.173-199
    • /
    • 2011
  • A franchisee has to depend on the overall system, such as knowhow and management support, from a franchisor in the franchise system and the two parties do not start with the same position in economic or information power because the franchisor controls or supports through selling or management styles. For this, unfair trades the franchisor's over controlling and limiting the franchisee might occur and other side effects by the people who give the franchisee scam trades has negatively influenced on the development of franchise industry and national economy. So, the purpose of this study is preventing unfair trade for the franchisee from understanding the causes and problems of dispute between the franchisor and the franchisee focused on the dispute cases submitted the Korea Fair Trade Mediation Agency and seeking ways to secure the transparency of recruitment process and justice of franchise management process. The results of the case analysis are followed; first, affiliation contracts should run on the franchisor's exact public information statement and the surely understanding of the franchisee. Secondly, the franchisor needs to use their past experiences and investigated data for recruiting franchisees. Thirdly, in the case of making a contract with the franchisee, the franchisor has to make sure the business area by checking it with franchisee in person. Fourthly, the contracts are important in affiliation contracts, so enacting the possibility of disputes makes the disputes decreased. Fifthly, lots of investigation and interests are needed for protecting rights and interests between the franchisor and franchisee and preventing the disputes by catching the cause and more practical solutions of the disputes from the government.

주요국가에 있어서의 경쟁법$\cdot$경쟁정책의 개정 움직임

  • 한국공정경쟁연합회
    • Journal of Korea Fair Competition Federation
    • /
    • no.26
    • /
    • pp.34-45
    • /
    • 1997
  • 세계 경제질서의 급속한 변화에 따라 최근에 많은 선진국들이 경쟁법을 개정하거나 앞으로 개정할 움직임을 활발히 전개하고 있다. 특히 이중에서 글로벌 경제의 급속한 진전에 따라 여기에 대응하기 위한 경쟁법의 개정 움직임도 활발하게 이루어지고 있음을 음미해보아야 할 것이다. 미국은 반트러스트법의 개정을 검토하기 위하여 공청회를 개최하고 ''95년 5월 ''새로운 하이테크 글로벌 시장에서의 경쟁정책''이라는 보고서를 발표하였으며, 이에 따라 합병심사에서 효율성을 앞세워 미국 국내기업의 해외 진출을 지원하고 합병을 용이하게 하도록 ''92년에 제정된 합병 가이드라인을 개정하였다. EU의 구주위원회도 기업결합의 글로벌화가 촉진되도록 ''96년 7월 합병규제규칙을 개정하여 업계가 손쉽게 합병을 할 수 있도록 절차에 있어 일원적 처리의 범위를 확대하였으며, 기업의 규제대상이 되는 연간 매상고기준을 인하하고 합병심사의 대상기업이라도 경쟁상 중대한 문제가 발생하지 않는 것으로 판단되면 공동체 시장에서 적합성을 선언할 수 있도록 하고, 경쟁제한법 협정의 적용제외 규정에서 수직적 제한에 대한 경쟁법 적용여부의 결정은 당사자의 시장점유율을 고려해서 적용여부를 결정하는 등 폭넓은 선택이 가능하도록 개정하였다. 이에 따라 EU국가인 독일, 영국, 프랑스 등의 EU회원국들은 EU합병규제규칙 및 EU경쟁법과의 조화가 이루어지도록 자국의 법체계를 정비하고 있다. 이에 따라 독일은 지난 ''97년 7월 31일에 경쟁제한금지법 제정 이후 40년만에 근본적인 개정의 필요에 따라 EU경쟁법과의 조화, 카르텔에서 적용제외 규정을 글로벌 경제구조에 맞도록 과감히 삭제$\cdot$축소하고, 합병규제대상의 매상고기준을 상향(5억$\right$10억마르크)하고 법체계를 명확하고 알기 쉽게 정리하는 개정(안)을 발표한 바 있다. 그리고 영국 무역산업성 장관은 지난 ''97년 8월 7일 영국의 경쟁법개정(안)을 금년 가을까지 성립을 목표로 발표하였는데, 그 주요 내용은 반경쟁적 협정 및 시장지배력 남용에 대한 강력한 억제력과 중대한 남용행위에 제재금을 부과함으로써 경쟁을 통한 소비자의 이익과 선택을 확보하고 산업계의 불필요한 부담을 경감토록 하여 글로벌시장 경쟁에서 혁신과 투자를 자극하도록 유도하였고, 프랑스는 생산업자와 유통업자에 의한 부당염매금지 제도를 도입하고 경쟁제한행위금지 위반시의 벌칙을 강화했다. 일본은 치열한 국제경쟁에 대응하고 경제구조의 개혁과 사업자활동을 보다 촉진하기 위하여 지난 1997년 6월 11일 일본독점금지법을 개정하여 독점금지법에 위배되지 않는 범위에서 지주회사 설립 금지를 해체하고 대규모회사 주식보유총액제한 규제대상을 완화하는 한편 국제계약신고제도를 폐지하였다. 캐나다는 합병신청서 제출기간을 연장하고 통신판매를 직접규제대상으로 경쟁법 개정을 준비하였고, 호주는 거래관행법을 개정하여 연방정부와 주$\cdot$준주 정부간의 경쟁정책의 법적용을 통일하고 거래관행법 적용을 모든 사업에 확대하며, 재판매가격유지행위의 금지대상에 용역(전기통신서비스)도 포함시키고 시장참입을 촉진하는 제도를 신설하였다. 뉴질랜드는 합병이 국내시장에 영향을 주는 경우에는 외국에서의 합병에도 경쟁법을 확대적용하도록 하였다. 위와 같이 세계의 많은 국가에서 경쟁정책에 대한 새로운 동향과 공정거래법에 대한 개정작업이 활발히 이루어지고 있는데, 본고는 미국, EU, 독일, 영국, 프랑스, 일본, 캐나다 및 호주와 뉴질랜드 등 주요선진국에서의 공정거래법 개정 동향에 대한 주요 내용을 소개한 것이다.

  • PDF

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

A Coordinative Committee Model between Architects and Contractors in Design-Build Projects (설계시공일괄공사에서 설계자와 시공자 간의 단계별 중간협의체 운영모델)

  • Kong Seung-Hwan;Kong Seung-Hwan;Eom Ik-Joon;Koo Kyo-jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.323-328
    • /
    • 2004
  • Domestic Design-Build, which has applied for client's convenience, has many problems Because It is being applied in the building law, which devides between architects and contractors. Among problem the relation between architects and contractors is a typical problem. It makes a quality decline and a design skill decline. In result, it causes insufficience of competitive power in overseas projects from now on. So we present the plans to improve mutual relations between architects and contractors. And we induce development of design skill and good quality of building by presenting a coordinative committee model between them in Design-Build projects.

  • PDF