• Title/Summary/Keyword: 계류설비

Search Result 21, Processing Time 0.022 seconds

Calculating the Mooring Force of a Large LNG Ship based on OCIMF Mooring Equipment Guidelines (OCIMF 계류설비지침 기반 대형 LNG선박 계류력 계산)

  • Wang, Jian;Noh, Jackyou
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.4
    • /
    • pp.594-600
    • /
    • 2022
  • When a large liquefied natural gas (LNG) carrier is anchored at a coastal terminal, calculations on mooring forces of mooring cables induced by environmental loads such as strong winds and currents are needed to secure mooring safety. The advantages and disadvantages of several existing mooring force calculation methods are compared and analyzed with their application conditions. Resultingly, mooring equipment guidelines of the Oil Companies International Marine Forum (OCIMF) are chosen as the computational method for this study. In this paper, the mooring forces of a large LNG carrier with spectrum was calculated using the OCIMF mooring equipment guidelines. The calculation shows similar maximum forces resulted from the calculation using experiment data of a wind tunnel test. To verify the results, OPTIMOOR, a dedicated mooring force calculation software, is used to calculate the same mooring conditions. The results of both calculations show that the computational method recommended by OCIMF is safe and reliable. OPTIMOOR calculates more detailed tensile force of each mooring cable. Thus, the calculation on mooring forces of mooring cables of a large LNG carrier using OCIMF mooring equipment guidelines is verified as an applicable and safe method.

Design of quay mooring rope of Floating Dock against Typoon (태풍 시 플로팅도크 안벽 계류 로프 설계)

  • Kim, Ho-Kyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.569-574
    • /
    • 2020
  • A floating dock is the main facility for launching ships. In the early 2000s, ship-launching technology using floating docks was developed in Korea. Therefore, the opportunity to participate in new construction projects without investment in dry docks has expanded. In this paper, a basic calculation for the safe mooring of a floating dock was performed, and a mooring system was designed based on this. This study was conducted considering the typhoon situation, which is the most serious environmental requirements of Daebul Pier, a site to be installed and operated, for a floating dock. The design load was calculated by wind load, tidal load, and wave-induced load in accordance with the internationally accepted standards. After performing the initial arrangement of the mooring line of the floating dock using the existing mooring facilities of Daebul Pier, the minimum breaking load for each mooring line was calculated for the given load. Based on the calculation, the mooring arrangement was modified to minimize the breaking load, and a final specification of each mooring line was selected.

A Study on Analysis of Mooring Safety Sensitivity According to the Arrangement of Bitt Against Gust (돌풍 대비용 직주 배치에 따른 계류안전성 민감도 분석 연구)

  • Kim, Seungyeon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.7
    • /
    • pp.767-776
    • /
    • 2020
  • Due to the recent climate change caused by global warming, weather changes in a different pattern from the past have occurred, and the increase in seawater temperature has led to an increase in the size and intensity of typhoons. Accordingly, there is an increasing need for bitts that can be used to secure mooring safety of the ship when a sudden gust occurs. Based on 12 scenarios of a mooring safety evaluation program, this study analyzed the criteria for arranging bollard and bitt, and analyzed the sensitivity of mooring safety when using storm bitts. As a result of the evaluation, it was analyzed that the mooring factor value decreased compared to the general mooring line arrangement when the fore and stern breastline were added to the bitts for gusts. The results of this study can be used as basic data for proposing storm bitts arrangements for gusts in consideration of the characteristics of berth ships and ports. From the perspective of ship operators, storm bitts at the pier will be an effective method for securing the ship's mooring safety in case of a gust of wind.

Mooring Layout Angle and Maximum Tension for Spread Moored FPSOs in Various Metocean Conditions (다점계류식 FPSO의 해양환경별 계류선 각도와 최대 장력에 대한 연구)

  • Park, Sung-Boo;Lee, Seung-Jae;Chung, Yun-Suk;Lee, Min-Kyeong;Jung, Kwang-Hyo
    • Journal of Ocean Engineering and Technology
    • /
    • v.30 no.4
    • /
    • pp.253-259
    • /
    • 2016
  • This study demonstrates the result of mooring analysis for five spread-moored FPSOs having different length-to-breadth (L/B) ratios from 4.5–6.5. FPSOs are subjected to four metocean conditions, ones from the Gulf of Mexico (Hurricane/Loop current condition), West Africa, Nigeria, and Brazil Campos Basin, which are amongst the most typical offshore oil and gas fields. With change in design parameters of OBA (Outer bundle angle) and IBA (Inner bundle angle) combinations, a change in the line tension is demonstrated and the OBA-IBA combinations having the smallest line tension are presented for each L/B ratio and sea, respectively. This study is expected to influence the preliminary design layout of an FPSO spread-mooring system as a function of the L/B ratio and metocean conditions.

Extreme Mooring Analysis of Turret Moored LNG-FSRU (터렛 계류된 LNG-FSRU의 극한 계류 해석)

  • Lee, Min-Kyeong;Jung, Kwang-Hyo;Park, Sung-Boo;Yu, Byeong-Seok;Chung, Yun-Suk
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.5
    • /
    • pp.435-446
    • /
    • 2016
  • In this study, hydrodynamic and mooring analysis for LNG FSRU moored by an internal turret with 9 mooring lines are numerically performed using commercial softwares, Hydrostar and Ariane. Met-ocean combinations for screening method are taken from wave governed condition(BV Rule Note NR 493) with relative heading between wave and wind between −45° and +45° and relative heading between wind and current between −30° and +30°. Extreme mooring analysis and sensitivity analysis are performed for intact and damaged (=one line missing) conditions and the parameters for sensitivity analysis are wave peak period, peak enhancement factor and line pretension. In the viewpoint of the design tension in mooring line, chain diameter is designed to satisfy safety factor for each conditions. As the chain diameter is increased from 152mm to 171mm, the designtension is reduced while the minimum breaking load is increased.

Development of the Large-Capacity Mooring Fittings according to MEG4(Mooring Equipment Guideline 4) (MEG4(Mooring Equipment Guideline 4) 적용에 따른 대용량 무어링 피팅 개발)

  • Myung-Su Yi;Kwang-Cheol Seo;Joo-Shin Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.7
    • /
    • pp.950-957
    • /
    • 2023
  • For safe mooring and towing between the ship and port, the equipment must be designed in accordance with the relevant international regulations. However, some small shipyards and engineering companies often do not fully comprehend the core contents. Therefore, the international regulations regarding towing and mooring equipment are reviewed and the bollard and chock are newly developed based on the Mooring Equipment Guideline 4 (MEG4) standards. A bollard is a mooring equipment used to fix a mooring rope to the hull. It has two columns and is mostly used in a figure eight pattern knots under the mooring condition. The chock, which is used to change the mooring rope direction coming into the ship from outside, is manufactured using a casting with curvature. The two mooring equipment are widely used in the stern, bow, and mid-side. Owing to the increase in the size of container vessels and LNG ships, the mooring rope load has increased and the safe working load of the mooring equipment must be revised. This study summarizes and examines the results of the allowable stress method obtained using finite element analysis modelling. To consider the mesh size effect, a reasonable criteria was suggested by referring the existing class guidance. Additionally, the safe working load was verified through nonlinear collapse analysis, and the elastic region against load increments was confirmed. Furthermore, the proposed evaluation method can be used to develop similar equipment in the near future.

The Technique of Installing Floating Photovoltaic Systems (수상태양광의 시공기술에 관한 실증연구)

  • Choi, Young-Kwan;Yi, Jong-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.9
    • /
    • pp.4447-4454
    • /
    • 2013
  • In October 2011, a commercialized 100kW class floating photovoltaic system positive plant was installed at Hapcheon dam a multi-purpose reservoir the first time ever in the nation. Floating photovoltaic system differs in water float, mooring device and underwater cable process from land photovoltaic system. As for land and building photovoltaic power generation equipments, many installation cases and skilled experiences are available, and thus installation is not difficult. However, commercial power generation floating photovoltaic system, which is attempted for the first time in the nation, requires to be designed and installed through a series of processes like technical review and verification of data by process in comparison with similar cases. The structure of floating photovoltaic system, an equipment for float photovoltaic module and other electrical equipment, is required to withstand weather environments like wind or typhoon etc and yet not affect water quality negatively, and for implementation of this system, construction efficiency and economy etc should be considered comprehensively. In this paper, the techniques of installing floating photovoltaic structure, mooring device, underwater cable, electrical equipment and remote monitoring control system are explained. The 100kW floating PV system is operating with 15% average capacity factor.