• Title/Summary/Keyword: 결속자료 보정

Search Result 1, Processing Time 0.015 seconds

Estimation of Annual Energy Production Based on Regression Measure-Correlative-Predict at Handong, the Northeastern Jeju Island (제주도 북동부 한동지역의 MCP 회귀모델식을 적용한 AEP계산에 대한 연구)

  • Ko, Jung-Woo;Moon, Seo-Jeong;Lee, Byung-Gul
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.18 no.6
    • /
    • pp.545-550
    • /
    • 2012
  • Wind resource assessment is necessary when designing wind farm. To get the assessment, we must use a long term(20 years) observed wind data but it is so hard. so that we usually measured more than a year on the planned site. From the wind data, we can calculate wind energy related with the wind farm site. However, it calculate wind energy to collect the long term data from Met-mast(Meteorology Mast) station on the site since the Met-mast is unstable from strong wind such as Typhoon or storm surge which is Non-periodic. To solve the lack of the long term data of the site, we usually derive new data from the long term observed data of AWS(Automatic Weather Station) around the wind farm area using mathematical interpolation method. The interpolation method is called MCP(Measure-Correlative-Predict). In this study, based on the MCP Regression Model proposed by us, we estimated the wind energy at Handong site using AEP(Annual Energy Production) from Gujwa AWS data in Jeju. The calculated wind energy at Handong was shown a good agreement between the predicted and the measured results based on the linear regression MCP. Short term AEP was about 7,475MW/year. Long term AEP was about 7,205MW/year. it showed an 3.6% of annual prediction different. It represents difference of 271MW in annual energy production. In comparison with 20years, it shows difference of 5,420MW, and this is about 9 months of energy production. From the results, we found that the proposed linear regression MCP method was very reasonable to estimate the wind resource of wind farm.