• Title/Summary/Keyword: 격자지보재

Search Result 23, Processing Time 0.017 seconds

Load Bearing Capacity Evaluation of New Lattice Girder by Laboratory Test Techniques (실내평가기법에 의한 새로운 격자지보재의 하중지지력 평가)

  • Choi, Young-Nam;Kim, Dong-Gyou;Bae, Gyu-Jin;Jang, Yeon-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.666-672
    • /
    • 2010
  • Load bearing capacity of new lattice girder has been evaluated with optimized spider for lattice girder utilized in the construction of tunnels. This newly developed lattice girder is different from existing lattice girder as its design is associated with existing spider with newly developed 2 types of form. The spacing of lattice girder's spider is linked with the weight and it decides the unit cost and construction therefore, different spacing of the developed spider has been produced to evaluate the measurement of load bearing capacity. As the result of the tests by producing the spacing of spider as 0cm and 4cm for developed lattice girder-2, the load bearing capacity of 0cm with spacing of 21%, and 4cm with 25% of increase when they are compared with the existing lattice girder, and the weight of specimen was decreased. As the result of the tests by producing the spacing of 1cm and 6cm for developed lattice girder-3, the spacing of 1cm with 42%, and the spacing of 6cm with 11% of increase which presented higher load bearing capacity in all newly developed forms, and there was a certain degree of increase in weight in case of 1cm of spacing. The result of evaluation regarding on the displacement by applying the evaluation method suggested by the German Railroad administration, the entire specimens were found to satisfy all the evaluation standard suggested by the administration.

  • PDF

A Study on Load Bearing Capacity of Composite Member with Steel Rib and Shotcrete in NATM Tunnel (NATM 터널에서 강지보와 숏크리트 합성부재의 하중지지력에 관한 연구)

  • Moon, Sang Hwa;Shin, Young Wan;Kim, Seung Hwan;Yoo, Han Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.221-229
    • /
    • 2012
  • Steel ribs such as H-beam or lattice girder are often reinforced to secure the stability of NATM tunnel when the ground is in the bad condition. When designing, however, steel ribs are not often taken into consideration on the numerical analysis when they are regarded as temporary tunnel supports until shotcrete shows its best performance or if they are, there are various modeling methods. This study shows behavior and loading capacity of steel ribs and shotcrete through the strength test on the bending, pressure and full-scaled. Also, we conducted and analyzed the experiment of composite member consisting of shotcrete and steel ribs under the same condition. Through the result, we can find the fact that shotcrete and steel ribs do not work as one unit because of slipping on the boundary. Also, when numerical analyzing, it was concluded that steel ribs cover all bending moment and shotcrete and steel ribs share with axial force according to the compressive strength.

A study on the excavation cycle by the drill-and-blast method for a room-and-pillar underground structure (주방식 지하구조물의 발파 굴착공정 분석 연구)

  • Lee, Chul-Ho;Hyun, Young-Hwan;Hwang, Je-Don;Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.6
    • /
    • pp.511-524
    • /
    • 2016
  • Since a room-and-pillar underground structure is characterized by its grid-type array of room and pillar, its economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill-and-blast method as a excavation method for a room-and-pillar underground structure was examined. In addition, the parallel excavation sequence was considered as the main sequence of a room-and-pillar underground structure. Sequences of mucking and support installation were derived to estimate the total excavation cycle by taking the case of a road tunnel into consideration. From the excavation cycle of room-and-pillar underground structure, the relationship between available maximum and minimum numbers of jumbo drill machines depending on the number of faces in operation was suggested.