• Title/Summary/Keyword: 건축시공시뮬레이션

Search Result 112, Processing Time 0.026 seconds

Financial Analysis Model Development by Applying Optimization Method in Residential Officetel (최적화 기법을 활용한 주거용 오피스텔 수지분석 모델 개발)

  • Jang, Jun-Ho;Ha, Sun-Geun;Son, Ki-Young;Son, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.67-76
    • /
    • 2019
  • The domestic construction industry is changing according to its preference for demand and supply along with urbanization and economic development. Accordingly, initial risk assessments is more important than before. In particular, demand for lease-based investment products such as commercial and office buildings has surged as a substitute for financial products due to low interest rates of banks. Therefore, the objective is to suggest a basic study on financial analysis model development by applying optimization method in residential officetel. To achieve the objective, first, the previous studies are investigated. Second, the causal loop diagram is structured based on the collected data. Third, the system dynamics method is used to develop cost-income simulation and optimization model sequentially. Finally, the developed model was verifed through analyzing a case project. In the future, the proposed model can be helpful whether or not conduct execution of an officetel development project to the decision makers.

Noise Simulation of Road Traffic in Urban Area Using LiDAR Data for U-City Construction (U-City 건설을 위한 LiDAR 자료를 이용한 도심지 도로교통소음 영향의 시뮬레이션 분석)

  • Cho, Jae-Myoung;Lee, Dong-Ha;Yun, Hong-Sic;Lee, Seung-Huhn
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.25 no.3
    • /
    • pp.199-205
    • /
    • 2007
  • In this study, we have intended to precisely analyze the aspect of propagation and the extent of damage due to the traffic noise as hon as a main source of noise in urban area. The propagation of traffic noise has a strong relationship between distance and shape of surface. Thus, it is necessary to consider the distribution of buildings for estimating effects of noise in urban area because noise propagations will be affected by buildings. For this, we developed the DEM and DBM using the airborne LiDAR data in the study area and compared with results from the noise simulations using the each model. The extent of damage occurred by the traffic noise above 60 dB(A) from the case of DEM were shown at the 60% of a whole study area, whereas the extent from other case of DBM were shown at the 30% of a whole study area. Also, the extent of the noise levels between 45 dB(A) and 50 dB(A) will be generally recognized as calm environment was increased(the 0% to the 43%) in the case which simulated with building informations. These results indicated that the shape informations of buildings like a DBM is a essential source to simulate the propagation of traffic noise in urban area especially. With results in this study, the effect of traffic noise at a specific area will be easily and precisely estimated if we have the LiDAR data and a traffic census for Korea. Furthermore specific area's traffic noise simulation could be possible using only road traffic information once we have DBM data from LiDAR surveying. This also could be applied as a base data for noise pollution petitioning, traffic planning, construction, etc. in huge city planning projects like a U-City.

Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project (4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안)

  • Kim, Hyeon-Seoug;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.269-278
    • /
    • 2018
  • In Korea, BIM technology is applied mainly to building construction projects, but is expected to be applied rapidly to civil engineering projects because the government is currently considering the mandatory application of BIM for infrastructure facilities. Because the infrastructure project is processed in a horizontal work area, the application of BIM technology is more useful in the schedule management of the construction phase than the interference management of the design phase. The 4D CAD system is a typical BIM technology applied to the schedule management in the construction phase, but the application to the actual project is limited due to the lack of practical functions. This study examined the functions of four representative 4D CAD systems commercialized so that the selection criterion can be provided according to the characteristics of the project, and suggests that the functions that should be improved to have practicability. As a result of functional analysis, the application characteristics of each system were analyzed and the user convenience was suggested. In addition, a linear 4D simulation methodology was developed to improve the functions applicable to civil engineering projects, and ways to improve the utilization of the infrastructure projects as the construction phase BIM were suggested. In railway and road construction projects, most activities, such as earthwork, bridges, and tunnels proceed along the distance axis in a horizontal space. Therefore, a linear 4D simulation method, in which an activity is expressed along a distance axis, can be more practically useful rather than a simple 4D simulation method with a Gantt chart.

The Implications of Amore-Pacific's New Office Landscaping Through the Ground Theory (근거이론을 통해 본 아모레퍼시픽 신사옥 조경의 함의)

  • Park, Seong-uk;Hong, Youn-Soon;Kim, Woo-Jin
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.6
    • /
    • pp.84-95
    • /
    • 2022
  • The landscaping of Amore-Pacific's new building has received various awards since its construction. This study attempted to identify the mechanisms of planning, design, and construction of this project through the ground theory. The results of the study are summarized as follows. The client's place attachment of the sites, which was the company's parent, was the driving force for an international design competiton in which architecture and landscaping were integrated. After that, in the detailed design stage for the actual implementation of the contest-winning plan, competent local designers and contractors were selected, and a consultative body was operated to engage in various opinions and promote rational decision-making. As for consultative body's operation method, simulation, physical model production, and detailed drawings were created after sharing opinions, and landscape design supervision played a major role. Establishing consistency in design and construction through integrated planning and landscape design supervision is required to cultivate craftsmanship and foster landscape coordinators in today's industrialized practice. The accumulation of related follow-up studies and supplementation of the system is anticipated.

Study on Energy Performance And Economic Evaluation of Windows System with Built-in Type Blinds (블라인드 내장형 창호시스템의 에너지 성능 및 경제성 평가에 관한 연구)

  • Joe, Won-Hwa;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.97-104
    • /
    • 2010
  • This study evaluated the energy efficiency of a windows system using built-in blinds, with regard to their insulation performance and their blocking of solar radiation. The study took advantage of the "Physibel Voltra" program as a physical simulation of heat transfer. To simulate the "Physibel Voltra" program, I practiced a mock-up test to determine heating quality and translation condition. I analyzed the propensity to annual energy consumption, the annual quantity of heat transfer, and the annual cooling and heating cost through a computer simulation for one general household in an apartment building. In the test, it was found that compared to a general windows system, a windows system with built-in blinds reduced the annual heat transfer by 10% in cooling states and by 11% in heating states when the blind was up. When the blind was down, the windows system with built-in blinds reduced the annual heat transfer by 25% in cooling states and 30% in heating states. When a windows system with built-in blinds is compared with a general windows system, the quantity of cooling and heating loads is reduced by 283.3kw in cooling states and 76.3kw in heating states. This leads to a reduction in the required cooling and heating energy of 359.6kw per house. It is thus judged that the use of a windows system with built-in blinds is advantageous in terms of reducing greenhouse gas emissions, because the annual TOE (tons of oil equivalent) per house is reduced by 0.078TOE, while $tCO_2$ is reduced by $0.16tCO_2$. In addition, compared with a general windows system, the cost of cooling and heating loads in the system reduces the annual cooling cost by 100,000won, and the annual heating cost by 50,000won. Ultimately, this means that cooling and heating loads are cut by 150,000won per year.

The Comparative Study on Incentive System for Integrated Design of Low-Energy Buildings (저에너지건물 통합설계 인센티브 체계 비교 연구)

  • Lee, Byungyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.6
    • /
    • pp.129-139
    • /
    • 2016
  • The purpose of this paper was to comparatively investigate the efficient building incentives in Korea and foreign countries and to seek strategies to enhance low energy building integrated design market infrastructure in Korea. The structure of incentive policies were composed of four main component: 1) types of financial aids and beneficiaries, 2) energy performance criteria and verification methods, 3) supports for low energy building integrated design, and 4) funding sources for incentive programs. Every overseas incentive program has adopted a design team incentive along with building owners incentive and the range of target buildings have been extended from new construction to remodeling projects. The main system of the program is the performance standard through which projects were investigated and the level of incentive are decided. Initially, the integrated performance has been investigated through simulation methods, but the construction performance evaluation and energy monitoring methods are emerging. In addition, the direct support and educational support for integrated design has been provided to enhance the foundation of relative markets. Financial funding is also a key component of the program and more aggressive funding strategies have been adopted.

The Economic Comparision through LCC Analysis on each Graded Alternatives for Green Remodeling of Public Building (공공건축물의 그린리모델링 수준별 LCC (Life Cycle Cost) 분석을 통한 경제성 비교)

  • Kim, Jaemoon;Lee, Junghyuk;Lee, Duhwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.38-49
    • /
    • 2018
  • Since the ratification of the Paris Agreement (COP21), the government is continuously strengthening policies for the reduction of greenhouse gas of the construction industry in accordance with the growing importance of reducing greenhouse gas and obligation of the government. Especially, the government emphasizes the need to improve the energy performance of old public buildings. Since 2014, the government is running a pilot project in which the government supports the construction cost of the green remodeling project of old public buildings and it is intended to develop the best practice of green remodeling and activate the green remodeling in the private sector. In this study, we analyzed the economical efficiency of the old public buildings by each level through green remodeling and conducted building related investigation and equipment measurement to plan the alternatives of the corresponding buildings. The improvement plan is a green remodeling plan that integrates alternatives. Five improvement plans were developed for each level to analyze the economic feasibility of each plan. As for the analysis method, the first energy demand amount calculation and the LCC analysis were performed through ECO2. In the LCC aspect, the improved 3/4 plan (middle level plan) was the most excellent and results were obtained in the order of the highest cost plan followed by the lowest cost plan. As a result, it is expected that it can be utilized as a basic data for future green remodeling performance plan and economic feasibility analysis in the future.

A Study for BIM based Evaluation and Process for Architectural Design Competition -Case Study of Domestic and International BIM-based Competition (BIM기반의 건축설계경기 평가 및 절차에 관한 연구 -국내외 BIM기반 건축설계경기 사례를 기반으로-)

  • Park, Seung-Hwa;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.23-30
    • /
    • 2017
  • In the AEC(Architecture, Engineering and Construction) industry, BIM(Building Information Modeling) technology not only helps design intent efficiently, but also realizes an object-oriented design including building's life cycle information. Thus it can manage all data created in each building stage and the roles of BIM are greatly expanded. Contractors and designers have been trying to adopt BIM to design competitions and validate it for the best result in various aspects. Via the computational simulation which differs from the existing process, effective evaluation can be done. For this process, a modeling guideline for each kind of BIM tool and a validation system for the confidential assessment are required. This paper explains a new process about design evaluation methods and process using BIM technologies which follow the new paradigm in construction industry through complement points by an example of a competition activity of the Korea Power Exchange(KPX) headquarter office. In conclusion, this paper provides a basic data input guideline based on open BIM for automatic assessment and interoperability between different BIM systems and suggests a practical usage of the rule-based Model Checker.

Alternative Design of Mega Structural Members of a Super-tall Building using 800MPa Grade High-performance Steel Plate (800MPa급 고성능 강재 적용한 초고층 메가 부재 대안설계)

  • Cho, So Hoon;Kim, Do Hwan;Kim, Jin Won;Lee, Seung Eun;Kim, Jin Ho
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.4
    • /
    • pp.299-309
    • /
    • 2014
  • HSA800 is a new high strength steel (HSS) plate for building structures developed by POSCO and RIST in 2011. It has upper and lower bounds for yield ($F_y$) and tensile ($F_u$) strength as of 650-770MPa and 800-950MPa, respectively, with yield ratio ($F_y/F_u$) limit as of 0.85 which make steel quality more reliable and enhance the seismic resistance of structures. As made by TMCP, it has a good weldability without increasing carbon percentage. The objective of this study is to provide alternative design of mega-structural members of the Lotte World Tower (555m, 123 story), a first super-tall building in Korea, using HSS considering structural safety, constructability, and cost-effectiveness. Steel outrigger trusses, belt-trusses and steel exterior columns were selected and analyzed to evaluate the structural performance between original and alternative designs using HSS. The results show that HSS can be applied to the members which do not affect lateral stiffness of a building and, in this study, approximately 1100tons of steel were saved. It implies that HSS can save overall construction costs - manufacturing, delivery, and erection costs - by reducing mega structural member size. HSA800 was very first applied to the Lotte World Tower based on the results of this study.

A Survey on the Performance-based Design Status of Fire-fighting Facilities through the Whole Design Drawings and Specifications (설계도서 전수조사를 통한 소방시설분야 성능위주설계 현황조사)

  • Jeon, Eun-Goo;Bae, Young-Hoon;An, Sung-Ho;Hwang, Cheol-Hong;Hong, Won-Hwa;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.33 no.5
    • /
    • pp.155-162
    • /
    • 2019
  • In Korea, the relevant laws and regulations for fire safety in buildings have been revised. Since 2011, Performance-based Design has been conducted for large-scale or high-rise buildings. However, the Korea's performance-based design is still at a level where life safety evaluation using fire and evacuation simulation tools is compared with existing methods. Although related studies have been conducted continuously for the mandatory performance-based design, the fact that it is relatively unsatisfactory for design and construction of fire-fighting facilities as it mainly focuses on administrative and institutional improvement measures or computer simulation. This study collected 91 performance-based design documents that were carried out nationwide at the initial stage of implementation until 2016 to analyze the status of performance-based design of fire-fighting facilities. As a result, fire-fighting facilities, except for fire extinguish system facilities, were not properly designed for performance. Furthermore, the designers found that if corresponding facilities or higher-level equipment with upgraded performance is additionally installed, the performance-based design fared well compared to the existing the prescriptive-based design.