• Title/Summary/Keyword: 건축계획 및 설계

Search Result 234, Processing Time 0.027 seconds

Understanding of Blast Resistant Design and Performance Evaluation of a Building designed for Conventional Loads (방폭설계의 이해 및 일반하중에 대해 설계된 건축물의 방폭성능 평가)

  • Hong, Jong-Kook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.4
    • /
    • pp.83-90
    • /
    • 2018
  • Considering the increased threats from worldwide terrors and the increased demands on the blast resistant design of commercial buildings, this study is aimed at understanding the basic concept of blast resistant design and evaluating the blast performance with an actual design example. Although there are many differences between earthquake and blast loads, the design concept against both loads is similar in terms of allowing the plastic behavior of a structure and sharing the ductile detailing. Through the blast performance evaluation of a target building provided in this study, it is noted that a well-designed building for the conventional loads can have a certain level of blast resistance. However, this cannot be generalized since the blast load on a structure varies depending on the type of weapon, TNT equivalence, standoff distance, etc. Architectural planning with positioning the sacrificial structure or maintaining a sufficient standoff distance from the expected detonation is the simple and effective way of improving the blast resistance of a building.

수중주거공간계획을 위한 수중 Habitat 사례분석 연구

  • 박상욱;김승일;이한석
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.11a
    • /
    • pp.310-312
    • /
    • 2022
  • 거주공간은 외부 환경으로부터 거주자를 안전하게 보호하고 사람의 생존을 위한 기본적인 환경을 갖추어야 한다. 또한 사회적 소통과 활동, 그리고 보다 안전하고 쾌적한 생활(업무 등 목적 행위 포함)을 보장할 수 있어야 한다. 수중주거공간은 일반적인 거주환경과 다른 극한 환경이며, 입지에 따른 고립과 공간 활용의 제한이 있다. 따라서 수중주거공간의 거주성 확보를 위해 공간설계기술 및 관련 기준 개발이 필요하다. 수중 habitat 프로그램은 1962년부터 1977년까지 선진국 17개국이 총 65개 수중거주공간을 해저에 설치하고 운영한 것으로서 수중주거공간에 대한 많은 데이터를 축적하였다. 이 연구에서는 수중 habitat 프로그램의 사례를 분석하고, 특성을 도출하여 수중주거공간 계획에서 고려해야 할 요소를 정리하였다.

  • PDF

Experiments on Egress of the elderly in High-rise Building (초고층빌딩에서의 고령자 피난실험 (설문조사))

  • Youn, Ho-Ju;Hwang, Eun-Kyung;Kim, Jong-Hoon;Kim, Woon-Hyung
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.369-372
    • /
    • 2012
  • 최근 대형고층건축물의 수적증가로 인해 화재 발생 시 재실자의 피난안전 확보가 매우 중요하게 되었다. 특히 지속적인 증가를 보이고 있는 고령자는 화재발생시 피난 및 대응이 부족해 많은 피해가 예상되기에 고층건축물의 피난계획 및 설계 시부터 재해약자인 고령자의 피난안전성 확보가 우선시 되어야한다. 이를 위해서는 고령자의 피난행동특성에 대한 연구 및 실험을 통한 기초적인 피난Data구축이 선행 되어야하기에 본 연구는 고령자를 대상으로 초고층건물의 상향과 하양의 이동피난실험을 진행했으면 노인들의 체력수준, 공간인지 수준, 화재발생시 피난 선호 방식 등에 대한 의견을 수렴하고자 피난실험 전과 후로 구분하여 설문을 실시 분석하였다.

  • PDF

A Case Study on Legal Systems related to Floating Building (플로팅 건축물 관련 국내외 법제도 사례 연구)

  • Lee, Han-Seok;Lee, Myung-Kwon;Kang, Young-Hun
    • Journal of Navigation and Port Research
    • /
    • v.36 no.6
    • /
    • pp.449-458
    • /
    • 2012
  • Recently many different floating buildings are planed and constructed in the sea, river, etc. for active use of water spaces. But many problems are occurred in the process of floating building design, construction and management due to the inadequate legal system. This incomplete legal system has become one of the critical factors which are hampering the invigoration of floating buildings. Therefore this study is to suggest preliminary data and improvement directions through a case study with domestic and foreign examples of appropriate laws and law applications concerning floating buildings. As the results of this study the laws related to floating building have to be revised in the directions of qualifying legally floating building as 'building' but not 'ship', designating 'special zone' for floating building site, and applying the established 'building licensing procedure' to floating building also.

Design and Implementation of the Quantity Surveying and Shop Drawing System for Structures (BIM 기반 골조 물량산출 및 도면생성 모듈의 설계와 구현)

  • Lee, Byung-Kwon;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.132-135
    • /
    • 2011
  • 최근 설계 단계에서 설계품질 향상과 시공 단계에서 비용 절감을 효과를 기대하며 3차원 BIM 관련 기술에 대한 관심이 높아가고 있으며, 또한 부분적으로 기술 도입 효과가 나타나고 있다. BIM 기술은 크게 BIM 도구를 활용하여 설계정보를 디지털화하는 모델링 단계 기술과 BIM 모델로부터 설계 정보를 추출하여 업무 진행에 필요한 형태로 가공, 변환하는 정보 활용 기술로 구분하여 생각할 수 있다. BIM 기술에 대한 근자의 높은 관심에도 불구하고 실제 현장에 적용되어 가시적인 성과를 내는 데에 한계를 보이고 있는 이유 중 하나로 후자의 정보 추출 및 활용 기술의 범위와 완성도의 한계를 들 수 있다. 즉 많은 노력을 통하여 BIM 모델을 구축하더라도 이를 기반으로 물량산출, 도면 생성 등 가장 기본적인 업무조차도 현장에서 바로 사용할 수 있는 수준의 기능이 제공되고 있지 않다. 본 연구에서는 건축 골조를 대상으로 3차원 골조 모델을 이용하여 골조 물량, 특히 정확한 물량산출이 상대적으로 어려운 철근에 대하여 철근의 이음, 정착 등이 고려된 실행물량을 산출할 수 있는 시스템을 설계하고 구현하였다. 또한 3차원 모델을 기반으로 철근 배근시공도와 가공일람표를 관련 기준에 따라 정확히 자동 작성함으로써 골조공사가 효율적으로 수행되고, 특히 정확한 이음 및 정착과 가공 계획을 통하여 철근 손실율을 최소화함이 기대된다. 본 논문에서는 이러한 BIM 기반 골조 물량산출 및 도면생성 시스템과 관련하여 주요 시스템 설계 내용과 구현 결과에 대하여 기술한다.

  • PDF

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

Analysis of Sustainable Building Design Element in Winter Sports Stadia and Convention Centre (대규모 동계스포츠 및 집회시설의 친환경계획요소 분석)

  • Choi, Dong-Ho;Yang, Jeong-Hoon;Seok, Ho-Tae
    • Journal of Korean Association for Spatial Structures
    • /
    • v.9 no.3
    • /
    • pp.49-58
    • /
    • 2009
  • This paper is to draw basic data for the revitalization of the sustainable buildings and the improvement of sustainable building design technology in Korea by analysing the design techniques of sustainable building and the application of the techniques applied to the large volume buildings through the study of foreign cases. This study introduces the design elements of sustainable building applied to the two winter sports stadia and one convention centre which have recently completed for the 2010 Winter Olympics in Canada and analyses the design techniques of sustainable building by the lists of LEED Green Building Rating System as well.

  • PDF

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

Evaluation of the current and potential flood storage effect (평화의댐의 현재 및 잠재 홍수저류효과 평가)

  • Shin, Hyunsun;Lee, Jinwook;Cho, Eunsaem
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.389-389
    • /
    • 2019
  • 평화의댐은 발전 기능이나 수문 조작 등 인위적인 기능이 전혀 없기 때문에 단순히 홍수조절용댐으로 분류된다. 평화의댐의 여수로는 일반적인 댐과는 달리 임남댐에 대응하기 위한 단계별 건설계획을 고려하여 댐 우안부에 배수터널 형식으로 건설되었다. 현재 평화의댐은 4련의 배수터널(직경 10 m)을 통해서 상류의 유입량을 하류로 방류하고 있다. 방류 능력을 초과하는 홍수가 발생하는 경우에는 일시적인 저류를 통한 제한적인 홍수조절을 수행하고 있지만, 그 효과는 크지 않다. 향후 남북한 관계 개선으로 임남댐의 안정성을 확보할 수 있다면, 평화의댐을 보통의 다목적댐과 같이 활용할 수 있을 것이다. 이에 본 연구에서는 평화의댐을 일반 다목적댐처럼 활용할 수 있는 상황을 가정하고, 일련의 운영방식을 적용하여 운영 방식 변경 전후의 댐의 홍수저류효과를 살펴보았다. 이를 위해 댐의 설계빈도인 200년 빈도의 강우에 대해 모의하고, 여러 가지 시나리오별 저류량-방류량 관계를 구축하였다. 최종적으로 비선형 저수지 모형에 적용하여 댐 저류효과를 정량화하고, 현재 및 잠재 홍수저류효과에 대해 비교하고 토의하였다.

  • PDF