A Study on the Sensitivity Analysis of the Financial Analysis Item in Apartment Project (공동주택 사업의 수지분석 항목에 대한 민감도 분석에 관한 연구)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.100-109
    • /
    • 2006
  • Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.

Definition of an Integrated Contract Package for Application of Multi-Trade Subcontract System (다공종 통합발주방식 적용을 위한 통합공종 규명에 관한 연구)

  • Song Hyung-Suk;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.385-388
    • /
    • 2002
  • The construction industry has complicated production processes with diverse disciplines and subcontractors, which is the major cause of lowered productivity. To solve this problem, multi-trade subcontract system is recently suggested. Some general construction companies have applied this method to some sections of work process. However, this is in the early stage of application. The purpose of this study is to define an integrated contract package for improving both contractor and subcontractor efficiency. First, this study recognizes construction company to need of multi-trade subcontract system. Finally, it suggests feasible activities which can be useful for a construction company to apply to this subcontract system.

  • PDF

A Qualitative Analysis of Construction Projects From Supply Chain Management Perspective

  • Min Jung-Ung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.80-87
    • /
    • 2004
  • This paper presents an analysis of construction project management from supply chain management perspective to gain insight from all constituents and to identify areas of improvement. In order to suggest opportunities for improvement, interviews with the members of a typical urban office building project in US were held. Based on that, a qualitative analysis of construction projects is presented. Focusing on electrical and mechanical sub-systems, this study illustrates the roles of subcontractors, suppliers, distributors, and manufacturing representatives as well as the complexity that a general contractor fares in managing its supply chain. The author$^{\circ}\phi$s recommendations are focused on process restructuring and automation, which include some quantifiable performance measures, incentives, and their alignment with each other

하도급정책-공정위, 불공정하도급거래 통합정보 시스템(USIS) 구축 사업 추진

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.218
    • /
    • pp.38-39
    • /
    • 2008
  • 정부 부처에 산재돼 있는 하도급거래정보를 하나로 묶는 불공정하도급거래통합감시망이 구축될 예정이다. 공정거래위원회는 최근 정부 부처에 산재돼 있는 하도급거래정보를 하나로 묶는 '불공정하도급거래통합정보시스템'을 올 11월까지 구축하기로 하고 사업에 착수했다고 밝혔다. 공정위에 따르면 하도급 서면실태조사결과가 누적돼 매년 수만개 업체의 하도급 자료가 축적되고 하도급법 적용 범위가 서비스업종까지 확대돼 적용대상 사업자수가 대폭 늘었지만, 현재의 정보시스템으로는 불공정하도급거래를 체계적으로 감시하는데 한계가 있고, 법위반 혐의를 포착해 조사에 활용하는 사전대응 기능이 미흡하기 때문에 불공정하도급거래 통합 감시망을 구축하게 된 것이다. 불공정하도급거래통합정보시스템이 구축되면 불공정하도급 발생 위험 정보를 신속하게 전파할 수 있고 경보발령 체계 확보로 조기 확산방지 능력을 갖추게 되며 특히 업종, 업체, 법 위반 유형에 따라 체계적인 정보 관리 및 분석이 가능하고 업체에 대한 사건처리의 진행상태도 파악할 수 있게 될 것으로 기대되고 있다.

  • PDF

하도급대금 어음.대물변제 "뚝" - '09.1.28일부터 '하도급대금 지급확인 제도' 시행 -

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.42-46
    • /
    • 2009
  • 최근 건설경기 침체에 따라 하도급 대금을 현금으로 지급하지 않고 불법 장기어음이나 미분양 아파트로 대물변제 등의 불법 하도급대금 지급행위를 근절하기 위해 국토해양부가 지난 1월 28일부터 '하도급대금 지급확인제도' 시행에 들어갔다. 하도급대금 지급확인제도는 원도급자가 하도급자에게 지급한 공사대금 내역과 하도급자가 수령한 하도급 대금을 발주자가 직접 비교 확인하여 하도급 대금의 적정지급 여부를 점검토록 한 것으로, 국토부 산하 지방청(국토관리 해양항만 항공)과 공사 공단에 전담부서를 지정하여 수시로 지급실태를 점검하고, 5개 국토관리청이 관할 구역 내에 공공발주 공사에 대하여 하도급대금 시급 실태를 총괄 관리하는 제도이다. 이 제도의 시행으로 공공공사에서는 불법 하도급대금 지급행위를 원천 차단 하여 불법 부당한 대금지급 관행이 근절될 것으로 기대된다. 이같은 제도를 시행하게 된 것은 그동안 대한설비건설협회(회장 강석대)가 불법 하도급대금 지급 근절을 위해 끊임없이 건의한 결과이다. 협회는 그동안 2차례에 걸친 국토부 차관과의 간담회를 비롯하여, 한나당 및 국토부 등 관련기관에 수차례에 걸쳐 건의했으며, 특히 연말에 이명박 대통령께 직법 건의하는 등 불법 하도급대금의 근절을 위해 많은 노력을 기울였다. 협회의 이러한 건의에 대해 국토부가 일정 부분을 수용함으로써 이 제도가 시행된 것이다.

  • PDF

A Survey of the Satisfaction Level of Construction Information System From Users' Viewpoints (현장 사용자 중심의 건설 정보시스템 만족도 조사)

  • Yoon eong-Hwan;Kim Yea-Sang;Chin Sangyoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.604-607
    • /
    • 2004
  • Most of large construction companies have developed construction information systems and their ultimate goals should be improvement of the management efficient of the construction projects. In order to make them successful, tile systems should be designed to meet system users' needs. Therefore purpose of this study Is to evaluate the current information management systems from the viewpoint of the system users, especially on-site engineers. Questionnaire surveys and interviews have been conducted for the highly ranked 10 construction companies on two major factors including the functions of the systems and satisfaction level of each function. From the surveys results, correlation between two factors has been statistically analyzed.

  • PDF

Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.

A Study on the Risk Evaluation of Construction Management Based on Risk Identification (위험도 기반 건설경영 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Lee, Gun;Yeo, Sang-Ku;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.83-91
    • /
    • 2009
  • Construction industry is a complex industry which should be invested with plenty capital, manpower and resources. Investment factors and inner and outer environmental factors should be managed systemically in terms with risk factors possible to occur. It maximizes the profit to establish construction management by managing risk systemically. While previous studies were executed with risk related to some special progress lively, studies about risk in managing construction company leave much to be desired. Therefore, this study examined risk in the whole construction management, showed the checklist and deduced the quantitative factors through questionnaire analysis from specialists. Also, priority and grade of construction management factors were evaluated by analyzing weight of construction risk factors.

Investigation of Disputes for Nominated Sub-contractor(NSC) -Focused on the Judicial Precedent of NSC issues in Singapore, Malaysia and Hong Kong- (아시아 건설 시장에서의 지정하도급자(NSC)문제에 관한 연구 - 싱가포르, 말레이시아 그리고 홍콩의 판례를 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun;Kim, Youngsuk;Lee, Boknam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.112-123
    • /
    • 2015
  • Many disputes are happened with various causes in overseas construction projects. One of major disputes is closely related with nominated subcontractors (NSC). This paper investigates 30 judical precedents for Singapore, Malaysia and Hongkong to analyze the detailed disputes related with the NSC, and then the judical precedents are classified into 6 categories: Delay and Defect Trouble (T1), Contract Relation (T2), Payment Trouble (T3), Set-off (T4), Liquidation (T5) and so forth (T6). According to the analytical results, the frequency of occurrence of disputes is considerably related with social and economical changes, and the dispute between NSC and employer for residential and commercial building projects is the most frequently happened case. As the results of analysis, therefore, it is concluded that the employer needs to response aggressively to the problems related with NSC, and it is also important to make the council for communication among related bodies. Furthermore, the institutional reform that make the role and the responsibility of employer consistent under considering contract terms and conditions is considered as the most important and fundamental issue.

A Study on the Effect of External Response to Construction Subcontract Disputes (건설하도급분쟁에 대한 외부적 대응노력(컨설팅)의 효과에 대한 연구)

  • Bae, Chan Young;Hyun, Byung Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.72-82
    • /
    • 2019
  • The purpose of this study is to find out how any organizational response or dispute-related consulting has a significant impact on management performance before or during a dispute over a construction subcontract dispute. In this study, multiple regression models were used to analyze the impact on consulting performance. According to the result of the analysis, the positive effects on the overall external consulting effect is influenced by five variables such as financial values, increase of the number of disputes, construction of response system by contents, construction of response system in each period, dispute response external response system. The original business operators were also more likely to be affected by internal activities of conflict response companies and the extent to which external response systems were established. This means that the supply and demand service provider's business environment is relatively poor, forcing it to be lower than the internal and external activities and influences of the original business operators of the conglomerates.