• Title/Summary/Keyword: 건설용 리프트

Search Result 11, Processing Time 0.033 seconds

Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building (센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발)

  • Shin, Joong-Hwan;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.153-163
    • /
    • 2013
  • As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.

건설용 리프트 구동축의 저면 에코 소실에 관한 조사 연구

  • 이광길;이동주;김용국;양원백;김세완;박대식;박재석
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.283-288
    • /
    • 2003
  • 건설용 리프트는 아파트 건설 현장에서 없어서는 안될 필수 장비의 하나로 인식되고 있다. 건설경기의 부침에 따라 차이가 있기는 하나 우리나라에는 11,000여대의 리프트가 사용되고 있는 것으로 추정된다. 리프트는 사람이 탑승하거나 하물을 운반하는데 사용되고 있으며 산업안전보건법상의 유해·위험기계기구로 규정되어 법정검사를 받고 있다.

  • PDF

A Feasibility Study on Optimal Lifting Planning in the High-rise Apartment Building Construction (공동주택공사의 건설용 리프트를 이용한 양중계획 타당성 분석)

  • Lee, Jun-Bok;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.185-193
    • /
    • 2008
  • In order to improve work efficiency in high-rise apartment building construction, it is required to establish the major criteria and practical method for selecting the construction lifts. It is necessary to analyze work efficiency and economic feasibility depending on speed, size and capacity of lifting equipment and characteristics of construction projects. The purpose of this research is to develop the fundamental process and information for selecting the lift in order to plan and manage the material lifting and laborers' vertical transporting in the high-rise apartment building projects more effectively. In order to satisfy the objective of the research, work performance of the lifting machines with different speed and carrying capacity is analyzed under the practical constraints. In addition, potential economic evaluation is conducted. One of the significant findings of the research is that the mid-speed lift shows 43% improvement in work efficiency compared with the low-speed lift. The results of the research will be used as the basis for developing the further optimal lifting management system.

A Study on Optimal Inspection Interval for the Major Components of Construction Lift (건설용 리프트의 운행정보 및 고장데이터 분석을 통한 주요 부품별 점검주기 산출 연구)

  • Soh, Jiyune;Bae, Jaehoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.68-77
    • /
    • 2015
  • One of recent concerns for super-tall buildings is how to manage hoisting plans and equipment efficiently. Disasters are frequently occurred in relation to electromotive hoists and cranes which are commonly used in construction sites. For construction lifts, particularly, it is highly important to conduct regular inspections or prepare against breakdown in terms of safety. However, unfortunately the reality is that regular inspections are only flatly conducted according to operating hours only. A lift, whose life span is subject to the complicated considerations such as operating hours, loading condition, and the like of each component, is far too invalid as a means of maintenance. As a way to resolve this problem and improve its convenience and safety for users, this study intends to calculate individual inspection interval for the main components of lifts by measuring their actual operating hours with sensing technology and analyzing their historical data. The findings of study include calculation of inspection intervals for the main components of lifts and classification of components to check by the actual operating hours of lift (40, 90, 130, 400 hours), which are drawn up into tables. This will make an opportunity to suggest efficient maintenance measures by enabling prevention of safety accidents and enhancement of safety for workers. Also, it will lead to increasing productivity of works by eliminating sources of delaying the term due to the breakdown of lifts.

A study of Performance Requirement for Energy-Regenerative Lift (회생에너지 재생시스템을 적용한 건설용 리프트의 요구성능 도출)

  • Won, Myeungkyun;Lim, Hyunsu;Lee, Myungdo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.205-206
    • /
    • 2011
  • Various studies on energy saving for construction sites have been carried out and some construction machines using motors have installed regenerative systems such as elevators and excavators. The construction lift also uses motors and generates more regenerative energy when the lifts descend because lifts convey many construction materials and workers. For this reason, it is possible to apply the regenerative system to the construction lift. However, if the system is applied without considering the lift's characteristics, the new development would fail; we therefore need to propose a performance requirement. Thus, the purpose of this study is to propose a performance requirement for the energy-regenerative lift prior to developing the energy-regenerative lift.

  • PDF

The Development of Simulation Model for Calculating Hoisting Time of Double-Cage Construction Lift in Supertall Building Construction (Double-Cage 건설용 리프트의 양중시간 산정을 위한 시뮬레이션 모델 개발)

  • Kim, Wansoub;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.64-65
    • /
    • 2016
  • According to the recent increase in the height of supertall buildings, construction lift became one of most important equipment for vertical transportation of resources. However, increase in lifting load during peak time in which the resources are concentrated often causes a risk of construction delay. This study suggests a concept of Double-Cage construction lift, which is a lift with two cages attached together allowing transportation of resources on two consecutive work floors simultaneously. The aim of this study is to present a simulation model suitable for calculating hoisting time of Double-Cage construction lift. The proposed model is expected to be utilized when applying Double-cage construction lift for its efficient operation and management.

  • PDF

Development of An Optimal Call-response Algorithm of Construction Lift for High-rise Building Construction (초고층 건설용 리프트의 최적 호출 응답 알고리즘 개발)

  • Ahn, Heejae;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.6-7
    • /
    • 2018
  • Although the importance of the construction lift is increasing, no improvements are being made to its operating system. This study proposed an optimal call-response algorithm of the construction lift for high-rise building construction by using image sensing technology, height measuring sensor, and load cell. This algorithm makes turn-around decision of the construction lift by considering the information and the number of user. It occurs when the call comes from a floor where the construction lift already have passed. The purpose of this study is to reduce the total latency of the construction lift user. Furthermore, it is possible to prevent delay in construction duration by carrying out a priority operation of the construction lift for the critical workforce.

  • PDF