• Title/Summary/Keyword: 건설생산성

Search Result 1,038, Processing Time 0.027 seconds

A Survey of DEA Applications in Measuring the Efficiency Performance of Construction Organizations (비모수 분석방법에 의한 국내 건설조직 성과 측정 방향에 관한 연구 - DEA를 이용한 국내 연구 문헌 고찰을 기반으로 -)

  • Lee, Yoon-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.103-114
    • /
    • 2014
  • Data envelopment analysis (DEA) measures the relative efficiency of decision making units (DMUs) with multiple performance factors that are grouped into outputs and inputs. DEA has proven to be superior to simple aggregation of performance measures, and is also useful for evaluating the performance of construction companies for comparison with competitor performance. The purpose of this study was to survey literatures on the application of DEA methodology and to propose a methodological scheme to measure the performance of construction organizations. Articles on previous studies were surveyed and examined as part of a comprehensive review. The survey revealed that the application of DEA in the construction industry was li mited. Further, the survey indicated that there is a need for the development of a methodological framework on the special goals and subjects of performance measurement, methods of data structure and collection, selection of appropriate DEA models, analysis of results, and post-test. Based on the survey, this study identified and discussed the types of major issues and topics for future studies from a methodological perspective, which could be helpful to researchers interested in using DEA to study performance issues in construction organizations.

Improvement of the Pipe Welding Management Process for Petrochemical Plant Projects (석유화학 플랜트 배관공사용 용접관리 프로세스의 개선)

  • Shin, Euicheol;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.4
    • /
    • pp.47-54
    • /
    • 2015
  • 국내 플랜트 엔지니어링 및 건설 업체들의 수익성 악화가 지속됨에 따라 플랜트 원가 경쟁력 강화 및 생산성 향상에 대한 요구가 증대되고 있다. 본 논문에서는 ISO 도면으로부터 용접 포인트의 번호를 부여 하는 용접커팅플랜 작업과 용접이력관리를 위한 용접검사보고서 작성에 대하여 현행 프로세스를 분석하고 문제점을 도출하였다. 현행 프로세스에서는 수작업에 따른 생산성 저하와 현장변경요청 발생에 대한 검증의 어려움이 발생하여 전산화를 통하여 석유화학 플랜트 배관공사용 용접관리 프로세스를 개선하였다. 개선 효과의 검증을 위해 국내 석유화학 플랜트 건설 프로젝트를 대상으로 현장변경요청 발생률과 업무 생산성 향상에 대하여 개선 전후를 비교하였다. 개선된 프로세스를 적용하여 현장변경요청 발생률은 개선프로세스 적용 이전 대비 4.3%p 감소하였고, 업무 생산성은 개선프로세스 적용 이전 대비 생산성이 한 장당 0.13 시간 향상이 있음을 확인할 수 있었다.

  • PDF

A Study on the Productivity Analysis of Eco-friendly Road Cutter (친환경 도로 커팅기계의 생산성 분석에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyoon-Tai;Jun, Young-Hun;Ok, Chi-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.106-107
    • /
    • 2019
  • Recently, maintenance of old facilities has emerged as a major issue. In particular, the demand for road cutting and excavation is increasing due to the aging of underground facilities such as water supply, sewage and city gas. In addition, the development of eco-friendly equipment is required due to the environmental problems of noise and dust. Therefore, this study intends to analyze the performance in terms of productivity of the eco-friendly road cutter developed as part of the development of eco-friendly equipment, and to derive improvements.

  • PDF

A Study of the Construction Management Applied to SSG Expansion Project in Shenzhen, China (중국 건설공사의 CM 적용사례 연구 - 중국심천 삼성코닝 프로젝트 수행사례를 중심으로 -)

  • Jang Dae-Sung;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.26-30
    • /
    • 2004
  • 중국심천 삼성코닝 프로젝트 (SSG Expansion Project)는 전문적인 건설인력이 없는 발주처를 대신하여 설계단계에서 최종 턴 오버(turn over)까지 건설 전 과정에 대하여 CM을 수행한 사례로서 한국기업이 중국에서의 CM 업무를 성공적으로 수행한 대표적인 사례이며, 대규모 공장건설에 있어 건설과 생산설비의 설치에 대한 종합적인 공정관리와 설계, 시공을 동시에 수행하는 Fast Track 방식에서 범할 수 있는 설계오류 및 풀질저하에 대한 사전 예측관리, 현지의 건설특성에 적합한 각종 공법 및 요소기술의 제시를 통한 시공성 향상, 원가절감, 공기단축에 기여로 유사 프로젝트 대비 4개월 이상 단축하여 성공적으로 제품을 생산하는 성과를 달성한 사례이다. 이에 본 연구에서는 프로젝트의 각 단계별 주요 CM업무 수행현황 및 중국건설의 특징을 고찰하고, 한국기업의 중국 CM시장 진출 가능성과 진출을 위한 사전준비에 필요한 사업 단계별 유의사항에 대한 검토를 목적으로 한다. 국내 건설경기가 침체되어 있는 현재 본 연구를 통하여 중국 건설현황에 대한 올바른 이해와 중국 CM시장의 진출 및 성공에 밑거름이 될 수 있기를 기대한다.

  • PDF

Reinforced-Concrete Works Productivity and Influence Factor Analysis on Nuclear-Power-Plant Project (원자력발전소 건설현장의 철근콘크리트 공종 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-Ho;Kim, Kyoung-Uk;Ahn, Young-Chul;Oh, Jae-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.314-321
    • /
    • 2014
  • Nuclear power plant projects are being increased all over the world. The construction of nuclear power plants needs huge money and time, which makes conducting a detailed analysis of productivity through the whole process. Reinforced-concrete works productivity field data was collected for more than one year and analyzed from a nuclear-power-plant project in Korea. The productivities of formwork, rebar-work, and concrete pouring were $0.54m^2/man{\cdot}day$, $0.06ton/man{\cdot}day$, $1.98m^3/man{\cdot}day$, respectively. Moreover, it is revealed that 'Day of the Week' is a driver of the formwork activity and 'Overtime' is for all of the three. The results will be a great interest of industry personnel estimating time and cost of a new nuclear power plant.