• Title/Summary/Keyword: 건설사업관리용역 표준절차서

Search Result 2, Processing Time 0.016 seconds

Development of the Design Management Guidelines to Enhance the Capability of Public Clients (공공 발주자 역량 향상을 위한 설계관리 지침서 및 절차서 개발)

  • Shin, Kyoo-Chul;Park, Hyung-Keun;Lee, Young-Ho;Kwak, Jun-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.143-151
    • /
    • 2011
  • The process of design management by public client has not performed effectively due to lack of the formal guidelines and procedures in domestic public projects. The purpose of this research is to develop the guidelines and procedures of design management for public clients. The research methodology is to analyze current status of design management process in domestic and overseas cases and to develop the guidelines based on the administrative stages of design process along the project. The guidelines of design management developed by the design stages of pre-contract, contract, and post-contract stages to classify administrative procedures. The outcome of this research is able to be utilized by the public clients and design firms to standardize the process of design management and minimize potential risk during the process of the project.

A Study on Proposal to improve Domestic Construction Management Service Guide (국내 건설사업관리 업무지침의 개선(안)에 관한 연구)

  • Na, Kwang-Tae;Ryoo, Boong-Yeol;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$