• Title/Summary/Keyword: 건설기술진흥법

Search Result 47, Processing Time 0.02 seconds

Quantitative Analysis of Rietveld Method Minerals by Sintering Temperature of Cement Clinkers with Fly Ash (리트벨트법에 의한 석탄재를 적용한 시멘트 클링커의 소성 온도별 광물 정량분석)

  • Yoo, Dong-Woo;Im, Young-Jin;Park, Tae-Gyun;Lee, Chang-Hyun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.4
    • /
    • pp.514-519
    • /
    • 2020
  • In this study, cement clinkers were sintered at each temperature by replacing some of the clay components of cement clinkers with coal materials. The mineral phase change of sintered cement clinker was quantitatively analyzed by XRD-Rietveld method. As the sintering temperature of cement clinker increased, the amount of belite decreased, the amount of alite increased, and the amount of free-CaO decreased. The form of alite and belite could be distinguished at sintering temperature of 1450℃ or higher. The crystal size was greatly increased at 1500℃ sintering. It was confirmed that the excessive sintering was progressed. Free-CaO decreased with the increase of sintering temperature. At 1450 ℃ or higher, it was less than 0.5%. In 1450℃ or greater, it is determined that enough sintering is included. Therefore, the application of fly ash as a raw material of cement clinker was judged to be usable as a source of chemical components of alumina and iron raw materials.

A Study on Estimation Method of Concrete Sleeper Strength for Sleeper Floating Track using Rebound Hardness Test Method (반발경도법을 이용한 침목플로팅 궤도의 콘크리트 침목 강도추정 기법 연구)

  • Chung, Jee-Seung;Lee, Jeong-Sug;Choi, Jung-Youl
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.277-282
    • /
    • 2022
  • The sleeper floating track (STEDEF) in this study was a track type in which a very soft resilience pad was installed under a relatively thin concrete sleeper (RC Block). Therefore it was expected that the resilience pad could affect the estimation results of the concrete strength. In this study, field applicability evaluation was performed to apply the rebound hardness test method, which was a general method for estimating the compressive strength of concrete in civil structures, to concrete sleepers of railway tracks. In order to analyze the strength estimation technique of concrete sleepers reflecting the characteristics of track structures different from those of civil structures, the parameter experiments that could affect the strength estimation results of concrete sleepers in a serviced line were performed. As a result of the study, the appropriate hitting position was suggested considering the shape of the concrete sleeper, and the difference in strength estimation results according to the condition of the concrete sleeper and supporting conditions was derived.

원자력 NEWS

  • Korea Atomic Industry Forum
    • Nuclear industry
    • /
    • v.26 no.4 s.278
    • /
    • pp.85-103
    • /
    • 2006
  • 국제원자력규제자협의회(INRA) 정식 가입/ "원자력 기술 주도국으로 부상"/ "방패장 건설 사업 착실히 추진"/ 방폐장 처분 방식 "객관적이고 투명하게"/ 인도네시아 국회의장 고리 원전 방문/ 세계 원자력 안전 전문가들 한 자리에/ 아시아 태평양 지역 17개국 원자력 협력 토의/ 국제핵융합실험로(ITER) 공동이행협정문서 최종 확정/ 한 · IAEA, 원자력방호기술 향상 방안 협의/ 울진 원전 6호기 리스크 정보 활용 정기 검사 수행/ IAEA, 국내 원전 안전 점검 협의 위해 방한/ 중국 원전 기술단 방한/ 울진 원전 총발전량 4천억kWh 돌파/ 원전 안전 관리 실태 불시 점검 결과 양호/ '핵융합연구센터' 공식 출범/ 핵융합에너지개발진흥법 제정을 위한 공청회 개최/ 제9차 한-미 안전조치 기술협력 회의 개최/ 개량핵연료 'PLUS7' 첫 상용화/ 베트남 원자력 협력 강화 워크숍 개최/ "2015년엔 세계 최우수 발전회사"/ 'APR1400'중국에 적극 홍보/ 한수원, 협력기업에 500억원 지원/ "한국 원자력 도입 경험 배우겠다"/ 방사선원 사고 대비 예방 안전 체계 구축/ "한수원 신용 등급 A+"/ 울진 6호기 '첫번째' 계획 예방 정비착수/ '2006 원자력 체험전' 개최/ 원자로 내부 이물질 감시 시스템 개발/ 월성 3호기 정비 완료, 발전 재개/ IAEA안전조치이행자문단 월성 원전 방문/ 제11회 원자력안전기술정보회의 개최/ 월성 1호기 방사능 방재 전체 훈련 실시/ (주)선바이오텍, 첫 '연구소 기업' 공식 승인/ 방사선원 안전성 향상 워크숍 개최/ 양성자 가속기 사업 본격 궤도에/ 스웨덴 프로스마르크 원전 관계자 방한/ "방폐장 유치한 성숙한 시민 의식 감탄" / "올해는 혁신을 체질화하겠다"/ KAERI, 연구윤리위원회 발족/ 2005년 지식 활동 우수 그룹 포상/

  • PDF

Analysis of Unit-works for Design for Safety in Construction Work : Focus on Construction Projects of OO Corporation (설계의 안전성 검토를 위한 건설공사의단위작업 분석: OO공사의 발주공사를 중심으로)

  • Kim, Jin-Won;Cho, Gun-Hee;Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.7 no.4
    • /
    • pp.315-322
    • /
    • 2016
  • Recently, Ministry of Land, Infrastructure and Transport has amended the law to Design for Safety in working design stage of construction work. There should be informed the disaster likelihood and severity of unit-works to decide risk of unit-works in Design for Safety. Therefore, the construction disaster data of ${\bigcirc}{\bigcirc}$ corporation were classified as 24 unit-works and the disaster likelihood and severity of unit works were analyzed in this study. The safety management level of unit-works which based on analysis data was suggested 3 groups; special management and emphasis management, regular management. The results of this study can be used as basic information to perform Design for Safety in construction. And this information will be able to reduce the disaster.

A Study on the Improvement of the Safety Management Plan under the Construction Technology Promotion Act by Field Survey (현장실태조사를 통한 건설기술진흥법 상 안전관리계획서의 개선방향에 대한 연구)

  • Yoon, Young Geun;Lee, Myeong-Gu;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.4
    • /
    • pp.30-37
    • /
    • 2018
  • Although the safety management plan review system according to the Construction Technology Promotion Act for securing the safety of the construction work is a fundamental system essential for the prevention of the construction industry disaster, the necessity of its improvement has been raised because it often fails to meet the original purpose. In this study, through the analysis of the effect of the safety management plan and the problems of the operation, we suggest ways to improve it in view of the construction accident reduction and conducted surveys on the construction site through the questionnaires of the client, construction company, and construction business technology manager. In order to improve the effectiveness of this system as a result of the study, it is necessary to distribute the guidelines for the preparation of the safety management plan, manuals, etc., to simplify the contents of the safety management plan, also the step-by-step approval of the safety plan can be a solution. For this, it is necessary to revise the policy through consultation with the Ministry of Land, Transport and Maritime Affairs and related experts.

A Study on Monitoring of Mitigation of Rail Corrosion using Sacrificial Anode Cathodic Protection Method (희생양극법을 적용한 철도 레일의 방식효과 모니터링 연구)

  • Choi, Jung-Youl;Park, Jong-Yoon;Lee, Kyu-Yong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.367-371
    • /
    • 2019
  • In this study, we proposed the sacrificial anode cathodic protection method as a countermeasure to reduce the corrosion of railway rails under oceanic climatic conditions and proved the anticorrosive effect experimentally. In addition, the proposed sacrificial anode cathodic protection method were tested on site to examine long-term rail corrosion monitoring and field applicability for more than 26 months and to prove the effectiveness of rail corrosion. As a result of monitoring the corrosion state using the cellophane tape method, the appearance of the applied sections with sacrificial anode cathodic protection method was good at the present time about 26 months after the field test laying, and no abnormalities and other abnormalities of the rail welded section and the rail web were found. Hence, in places where no sacrificial anodes were installed, rust progressed rapidly. In addition, the proper spacing of sacrificial anodes was found to form the most stable corrosion coating at 1.0 ~ 1.5m. After about 26 months of monitoring, the installation of sacrificial anodes could help stabilize the overall rail corrosion level, even if the spacing was somewhat wider.

A Study on the Estimation of the Proper Rates of Safety Management Cost in the Construction Technology Promotion Law for Reasonable Construction Safety Management (합리적인 건설안전 관리를 위한 건설기술진흥법상 안전관리비의 적정요율 산정에 관한 연구)

  • Yoon, Young Geun;Oh, Tae Keun;Lee, Myeong-Gu;Seong, Joo Hyun;Jung, Min Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.84-91
    • /
    • 2018
  • Despite the government 's efforts to reduce constructional disasters, it has been pointed out that the safety management cost of the Construction Technology Promotion Act does not reflect the actual site. Therefore, it is necessary to study the proper guideline of the safety management cost which can be used as the most fundamental measure to prevent construction accidents. Moreover for the securement of the reasonable safety management costs, it is important to calculate its appropriate rate. Thus, in this study, the appropriate rate of safety management cost was proposed by the construction cost & type based on the 111 execution plans of safety management cost, and the rate is analyzed to be 1/10 of the occupational safety and health management cost. The results of this study will be a guideline in improvement to the proper schedule rating system improvement and in implement of pilot projects.

A Study on Improvement Plans for Safety and Health Technical Support Project on Small Business by Field (소규모 사업장 안전보건 기술지원사업의 분야별개선방안에 대한 연구)

  • Yongro Ahn;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.625-632
    • /
    • 2023
  • Due to the recent occupational accidents, the government made efforts such the Severe Accident Punishment Act and roadmap for reducing severe accidents. In particular, more than 80% accidents occur in small businesses, such as those with less than 50 employees and construction sites with a construction cost of less than 100 million, and practical efforts are needed to reduce them. In small businesses, the appointment of a safety managers and safety and health management regulations have been excluded in whole or in part, and technical guidance from an institution specializing in accident prevention is compulsory to supplement them. In this study, the problems of the safety and health technology support project for small workplaces has been identified through a survey and improvement plans were proposed.

Example of Legislation on the Space Relations of Every Countries in the World and Main Contents of the Space Exploration Promotion Act and Future Task in Korea (세계 각국의 우주관계 입법례와 우리나라 우주 개발진흥법의 주요내용 및 앞으로의 과제)

  • Kim, Doo-Hwan
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.20 no.1
    • /
    • pp.9-43
    • /
    • 2005
  • The Korean government established her first "National Space Program" in 1996, and revised it in 2000 and 2005. As embedded in the National Space Program, Korea aims to become one of the world's top countries in space technology by 2010. All of 13 satellites are planned to be put into orbit as schematized, which include 7 multi-purpose satellites, 4 science satellites and 2 geostationary orbit satellites. The Space Center in Korea is to be built at Woinara-Do, Bongrae-Myon, Koheung-Goon, Junlanam Province on the southern coast of the Korean peninsular. The first phase of the construction of the space center will be finished by 2007 for launch of KSLV-l. This will make Korea be the 13th advanced country in space development having a launching site in the world. The "Space Center" will serve as the infrastructure for the development of space technology and related technology, and plan to launch a low earth orbit satellite in 2007. A second science satellite made in Korea will be launched from the space center by 2007. From 2010, the center will be operated on a commercial basis operating launch facilities for low-to mid-altitude orbit satellites. Since the 'Aircraft Industry Promotion Act' was replaced by the 'Aerospace Industry Development Promotion Acf of 1987, this Act had been amended seven times from 1991 year to 2004. Most of developed countries has been enacted the space law including the public or private items such as an (1)DSA, (2)Russia, (3)the United Kingdom, (4)Germany, (5)France, (6)Canada, (7)Japan, (8)Sweden, (9)Australia, (10)Brazil, (11)Norway, (12)South Africa, (13)Argentina, (14)Chile, (15)Ukrainian etc. As the new Space Exploration Promotion Act was passed by the resolution of the Korean Congress on May 3, 2005, so the Korean government has made the public proclamation the abovementioned Act on May 31, this year. This Act takes effect on December 1, 2005 after elapsing six months from the date of promulgation. The main contents of Space Exploration Promotion Act of 2005 is as the following (1)establishing a basic plan for promoting space exploration, (2)establishment and function of national space committee, (3)procedure and management of domestic and international registration of space objects, (4)licensing of launch by space launch vehicles, (5)lability for damages caused by space accidents and liability insurance, (6) organizing and composition of the space accident investigation committee, (7)Support of non-governmental space exploration project, (8)Requesting Support and Cooperation of Space Exploration, (9)Rescue of Astronauts and Restitution of Space Objects, etc.. In oder to carry out successfully the medium and long basic plan for promoting space exploration and to develope space industry in Korea, I think that it is necessary for us to enlarge and to reorganize the function and manpower of the Space Technology Development Division of the Ministry of Science & Technology and the Korea Aerospace Research Institute. Korea has been carrying out its space program step by step according to the National Space Program. Korea also will continually strengthen the exchange and cooperation with all the countries in the world under the principle of equality, friendship relations and mutual benefits. Together with all other peoples around the globe, Korea will make due contribution towards the peaceful utilization of space resources and promotion of human progress and prosperity.

  • PDF

A Study on the Proper Rate of the Safety Management Cost under the Construction Technology Promotion Act by Direct Calculation (건설기술진흥법 상 안전관리비에 대한 적산 및 품셈을 통한 적정 요율 산정에 관한 연구)

  • Chae, Yong Sup;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.68-75
    • /
    • 2018
  • The safety management cost system under the Construction Technology Promotion Act has contributed greatly to the prevention of construction accidents according to the chronological changes and social demand, but various problems have been pointed out. The biggest problem is that the safety management cost is earmarked very low because other items of safety management costs except for the safety inspection are not appropriately included in the actual construction site. Furthermore, it has been pointed out that it is difficult to settle the orderer due to the lack of specific use criteria. Therefore, in order to secure the proper safety management cost, this study is to estimate the actual cost by using of specification, quantity, material cost, labor cost for each type of the safety management item The results of this study were compared with the 71 cases of safety management costs in the safety management plan. In addition, analysis of unclear or unnecessary items in the current safety management cost and criteria and suggestions for improvement are provided. It is hoped that the results of this study will contribute to the rational safety management rate calculation.