• Title/Summary/Keyword: 건설기술진흥법

Search Result 47, Processing Time 0.024 seconds

Study of the Improvement of Information Management System on Subcontracted Service Results (하도급 용역실적 정보관리체계 개선 연구)

  • Kim, SeongJin;Kim, NamGon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.11
    • /
    • pp.6870-6876
    • /
    • 2014
  • Construction subcontracted services are conducted without clear systems, but to establish a sound trading order between the contractors and subcontractors, the government recently complemented a relevant system to legalize and systematically manage subcontracted services. This study prepared a system for managing the subcontracted construction service result after providing the optimal alternative plan through a related persons' interview, such as the ordering agency and the service company. Towards this end, the management system is provided to integrate subcontracted services and contracted services based on the system managing Construction Technology Service Result. The study findings can be shortened by more than 90% of the performance certification issuing work, and used to formulate measures to protect subcontractors, such as the prevention of low-priced subcontracts, by managing an objective and reliable subcontracted service result.

A Study on Activation of Vulnerable Worker Participation for Risk Assessment in Construction (건설업 위험성 평가 시 취약 근로자 참여 활성화 방안에 대한 연구)

  • Hyunjin Wi;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.533-538
    • /
    • 2024
  • The risk assessment under the Occupational Safety and Health Act was implemented in 2013, but since it is not mandatory, companies are operating it as a formality. Although legal obligations have been strengthened, such as the recent comprehensive revision of the Occupational Safety and Health Act and the enforcement of the Act on Punishment for Serious Accidents, the death rate has remained stagnant. Even if a risk assessment plan is properly established in order for employers to prevent industrial accidents through necessary measures, it is necessary to involve relevant workers so that they can understand and implement the contents of the risk assessment. In this regard, this study proposed applying efficient worker participation measures through on-site surveys to activate the participation of vulnerable workers in risk assessments. Key words : risk assessment, accident prevention, vulnerable class, worker participation

Study on Method of Improving execution by safety management plan in Construction Technology Promotion Act (건설기술진흥법 안전관리계획서의 실행력 향상 방안에 관한 연구)

  • Lee, Yong-Soo;Oh, Hee-kuen;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.2
    • /
    • pp.47-55
    • /
    • 2016
  • The objective of this study is to improve safe execution of the management plan in Construction Technology Promotion Act. This research addresses the issue how to prevent the collapse of facilities under construction and after completion, improve the examination system, and execute Improvement of Safety Management Plan. To achieve this goal, research providing insights into understanding the ways in which creating and presenting safety checks and deploying safety training measures effectively is imperative.

A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act (건설기술진흥법 안전관리계획서의 실행방안에 관한 연구)

  • Shin, Sung-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

A Study on the Effective Standard Career Development Program for Construction Engineer (건설엔지니어링 기술자 표준 경력관리 효율화 방안 연구)

  • Kim, Sang-Bum;Kim, Yong-Bi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1181-1189
    • /
    • 2013
  • This study illustrates the results of a background policy research conducted to provide supports for the 'Korean Engineering Industry Enhancement Law' promulgated by the Korean Ministry of Knowledge Economy. The main issue covered in this study is an effective way of managing standardized career development program for construction engineers. This study attempted to provide detailed criteria and guidelines for the public career development program for construction engineers by effectively collecting and analyzing relative. In doing so, various opinions from a wide range of stakeholders and related parties were gathered. In addition, an in-depth benchmarking investigation was performed with four main associations who have been operating their own career development management program for construction engineers. Some of the findings from this study have played a positive role specifying the details of the recently promulgated law such as 'Notice by Ministry of Knowledge Economy 2011-76: guidelines for managing construction engineer career'. This study was an empirical and practical research effort helping the government to set up an effective construction law system.

A Study on Evaluation Method of Cable Tension for Railway Steel Composite Bridge (강철도 복합교량 케이블의 장력 평가기법에 관한 연구)

  • Choi, Jung-Youl;Lee, Soo-Jae;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.4
    • /
    • pp.407-413
    • /
    • 2022
  • In this study, the empirical formula for evaluating cable tension based on long-term measurement for about 3 years according to temperature change was proposed by proving the correlation between the expansion joint displacement of the upper road bridge and the cable tension of the lower railway bridge. The tension prediction results using the empirical formula for tension evaluation each cables proposed in this study were found to be in good agreement with the cable tension using the vibration method within 3%. Therefore, it was analyzed that it could be applied together with the vibration method that was an experimental technique, to predict and evaluate the cable tension in serviced railway steel composite bridge. As a result of applying the estimated temperature calculated by the empirical formula for expansion proposed in this study to the empirical formula, it was analyzed that a high level of reliability could be secured when compared with the vibration method. Therefore, it is judged that the empirical formula for cable tension evaluation reflecting the estimated temperature proposed in this study can be used to predict the tension of cables according to climate change in the future and establish a maintenance plan.

The Establishment of Roles and Titles of Quality Control Personnel for Construction Project Quality Assurance (건설공사 품질확보를 위한 품질관리 관련자의 역할 및 호칭 정립)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.871-878
    • /
    • 2017
  • The quality control personnel of the construction work shall establish and execute the quality control plan or the quality test plan and check the qualification of the used materials according to the process, the management of the test and inspection equipment, the quality education, the own quality inspection and measures. Management and quality test of Korea and plays an important role in preventing accidents. However, related organizations did not explicitly disclose their roles in quality testing and quality control tasks while changing the names of quality control personnel to test personnel and quality managers when revising related laws and regulations and the application of labor costs. Therefore, a research of this is needed to improve conflicting situation. In this study, the ambiguous title relation to the quality control persons is improved to meet the requirements of the construction work based on related laws and regulations, and each role and title is classified as 'quality tester' and 'quality manager'. In other words, the person who carries out the quality test of the "Construction Quality Test Standard" specified in the Guideline for Quality Management of Construction Projects shall be the "Quality Tester" and the person who performs the quality control plan establishment and execution work specified in the Enforcement Rule of the Construction Technology Promotion Act shall be referred to as the 'Quality Manager'.

Development of the Qualitative Model for Post Construction Evaluation (건설공사 사후평가의 정성평가 모델 개발)

  • Lee, Kyu-Sun;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.733-739
    • /
    • 2018
  • Various public construction projects have been performed for public welfare and appropriate evaluation of the effectiveness and efficiency has been required. In accordance with legislation of a post construction project evaluation in Construction Technology Promotion Act, all construction projects that exceed 30 billion won in budget are required to perform post evaluation. Korean Government provides post construction evaluation manual that includes both quantitative and qualitative criteria. However, it only provides general concepts and procedures not but detail guidelines for different construction project types and characteristics. Therefore, this paper developed a standard format for qualitative evaluation using survey through analyzing previous cases and research. As a result, the developed standard for survey can be applied for most civil and architectural facilities. However, it will need further research regarding establishment of detailed evaluation criteria for each type of facilities and data storage system for feedback.

A Study on the Effect of Construction Safety and Health Management on the Post-management of Safety Inspection Evaluation (건설공사 안전 보건관리가 안전점검평가 사후관리에 미치는 영향관계)

  • Kim, Jin Tae;Shin, Yong Seung;Moon, Yu Mi
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.228-240
    • /
    • 2022
  • A comprehensive safety management system will be required in accordance with the implementation of the Major Disaster Punishment Act for close-up safety management of construction sites. Safety management level evaluation management requires a comprehensive relationship between safety management under the Construction Technology Promotion Act and health and health management system under the Industrial Safety and Health Act. Purpose: Safety under the Serious Accidents Punishment Act. The ultimate goal is to study the comprehensive analysis and relationship of health management and to improve the safety evaluation level of health and health management. Methods: The feasibility of the questionnaire was confirmed through the second Delphi analysis of construction site experts and safety managers, and the regression coefficient and path analysis of potential variants in safety management, safety management, health management and safety inspection were confirmed. Result and Conclusion: In the structural model, the regression coefficient (89%) from safety management, health system, and safety management to safety inspection execution and lambda values of appropriate observation variables were confirmed. In the path analysis, the total effect (.809) was confirmed by mediating health hygiene in the relationship between health plan establishment adequacy and post-inspection management, and the path coefficient (.82) of temporary structure safety was confirmed.