• Title/Summary/Keyword: 거더교

Search Result 251, Processing Time 0.029 seconds

Comparison of Efficiency by Span in Various Railway Bridge Types (철도교량형식의 경간에 따른 효율성 비교연구)

  • Lee, Tae-Gyu
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.7
    • /
    • pp.511-517
    • /
    • 2014
  • The superstructure type of the railway bridge in our country, is mainly classified into the box girder and the I-type girder. The box girder is widely used in the high speed railway bridge because of the safety due to dynamic behavior. The I-type girder is used in the conventional railway bridge, and is also divided into the general type and the composite type, and the newly modified types have been developed. According to the current railway bridge design code, the girder design by the span length in various railway bridge types are performed in this study. The suitable girder height by the span length are analyzed, and the comparative analysis of the structural efficiency and the economical efficiency is carried out. From this study, the composite type girder is appeared the good result in respect of the structural efficiency. However, in the economical aspect, the general I-type girder is required less cost than the other types.

Comparison of Girder Height and Construction Cost by Span in Various Types of Railway Bridge (철도교량형식의 경간에 따른 형고 및 공사비 비교연구)

  • Lee, Tae-Gyu;Oa, Seong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.471-476
    • /
    • 2008
  • The superstructure type of the railway bridge in our country, is mainly classified into the box girder and the I-type girder. The box girder is widely used in the high speed railway bridge because of the safety due to dynamic behavior. The I-type girder is used in the conventional railway bridge, and is also divided into the general type and the composite type, and the newly modified types have been developed. According to the current railway bridge design code, the girder design by the span length in various types of railway bridge is performed in is study. The suitable girder height and the construction cost by the span length are analyzed, and the comparative analysis of the structural efficiency and the economical efficiency is carried out. From this study, the composite type girder is appeared the good result in respect of the structural efficiency. However, in the economical aspect, the general I-type girder is required less cost than the other types.

The Development of Improved Construction and Design Method on Continuous Preflex Girder Bridge (연속 프리플렉스 거더교의 개선된 시공법과 설계식의 개발)

  • Koo, Min Se;Park, Young Je;Kim, Hun Hee
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.2 s.75
    • /
    • pp.183-194
    • /
    • 2005
  • In the previous construction method of continuous preflex composite girder bridge, we raised the inner support, and cast slab concrete innegative moment section, then lowered it to introduce compressive force in the slab. There were a few problems in the process such as the time required in raising the support and the bending of the camber. Therefore, this paper represents an improved construction method of continuous preflex composite girder by only moving downward the inner and outer supports to figure out problems in previous construction method. This paper proposes a design formula to find a proper cross section of preflex girder.

Calculation of Crack Width of the Top Flange of PSC Box Girder Bridge Considering Restraint Drying Shrinkage (구속 건조수축을 고려한 PSC BOX 거더교 상부플랜지 균열폭 산정)

  • Young-Ho Ku;Sang-Mook Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.30-37
    • /
    • 2023
  • The PSCB girder bridge is a closed cross-section in which the top and bottom flanges and the web are integrated, and the structural characteristics are generally different from the bridges in which the girder and the floor plate are separated, so a maintenance plan that reflects the characteristics of the PSCB girder bridge is required. As a result of analyzing damage types by collecting detailed safety diagnosis reports of highway PSCB girder bridges, most of the deterioration and damage occurring during use is concentrated on the top flange. In particular, cracks in the bridge direction on the underside of the top flange occurred in about 70 % of the PSCB girder bridges to be analyzed, and these cracks were judged to be caused by indirect loads such as heat of hydration and drying shrinkage rather than structural cracks caused by external loads. In order to improve durability and reduce maintenance costs of PSCB girder bridges in use, it is necessary to control restraint drying shrinkage cracks from the design stage. Therefore, in this paper, the cracks caused by drying shrinkage under restraint, which is the main cause of cracks under the flanges of the top part of the PSCB girder bridge, were directly calculated using the Gilbert Model, and the influencing factors such as the amount of reinforcing bars, diameter and spacing of reinforcing bars were analyzed. As a result of the analysis, it was found that the crack width caused by restraint drying shrinkage exceeded the allowable crack width of 0.2 mm for reinforcing bars with a reinforcing bar ratio of 0.01 or less based on the H16 reinforcing bar and a reinforcing bar with a diameter greater than H19 based on the reinforcing bar ratio of 0.01. Finally, based on the results of the crack width review, a method for controlling the crack width of the top flange of the PSCB girder bridge was proposed.

Structural Performance Verification of RDT Girder Bridge Feasible to Fill with Planting Ground (식재기반을 담는 RDT 거더교의 구조성능 검증)

  • Ha, Tae-Yul;Han, Jong-Wook;Yang, In-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.3
    • /
    • pp.2219-2228
    • /
    • 2015
  • The proposed RDT(Reversed Double T) girder bridge is suitable to eco corridor, because of its cross section which resembles Korean alphabet vowel "ㅛ". The total height and cost of bridge would be reduced for its inner space containing some of plant soil. In this study, the performance of the RDT girder was assessed by comparing results of static test with those of nonlinear analysis. The cracking load of the RDT girder was evaluated more than two times of design load.

A Study on the Fatigue Design of Joint Detail of Vertical Stiffener in Two-Girder Bridge (2거더교의 수직보강재 연결상세부의 피로설계에 관한 연구)

  • Kwon, Soon Cheol;Kyung, Kab Soo;Park, Jin Eun
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.93-103
    • /
    • 2009
  • Two-girder bridge is composed of primary members such as deck slab and main girder, and secondary member such as cross beam, vertical and horizontal stiffeners etc,. Two-girder bridge is prescribed as a non-redundant load path structure in the ASSHTO and the Korean Highway Bridge Design Code. Such structure is that if one girder is damaged, problems of function and safety of the bridge are caused. From the reasons, fatigue cracks in two-girder bridge can affect safety of the bridge seriously. Therefore, in this paper, fatigue evaluation was performed at connection parts of vertical stiffener and web with radius of curvature of scallop of vertical stiffener and thickness of web as variables. Such joint is known as a detail which has high possibility of fatigue crack in the bridge. Based upon the analytical results, preferable joint detail in terms of fatigue and simple empirical formula for fatigue evaluation of the detail were suggested.

Monitoring of Long-Term Behavior of The Continuous IPC Girder Bridge (IPC거더 연속교의 장기거동 모니터링)

  • Lee, Hong-Woo;Ahn, Jeong-Seang;Kim, Kyoung-Won;Yu, Sang-Hui
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.349-352
    • /
    • 2008
  • IPC girder is more prestressed and has smaller sectional area than the conventional PSC-I type girder due to incremental prestressing along the construction process. The continuous IPC girder bridge may have problems in serviceability and stresses at internal supports because it is very flexible. In this paper, The long-term behavior of the continuous IPC girder bridge is studied through long-term structural analysis and monitoring the deflections. The long-term behavior is monitored right before the introduction of 2nd prestressing that is the construction process different from the conventional PSC-I type girder bridge. The total station of high-precision was used in measuring the deflections. According to the monitoring result so far, the continuous IPC girder bridges does not show remarkable long-term behavior like severe camber or deflection and the measured deflections are very similar to the results of long-term structural analysis.

  • PDF

A Study on the Fatigue Crack at Welded Joint for Steel Plate Girder Railway Bridge (강철도 플레이트거더교 용접이음부 피로균열의 평가에 관한 연구)

  • Park, Jin-Eun;Kyung, Kab-Soo;Lee, Sung-Jin;Jo, Yun-Jae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.306-309
    • /
    • 2010
  • 강철도 플레이트거더교의 경우 일반적으로 레일의 폭보다 거더 사이의 폭이 넓기 때문에 거더에 편심이 작용하게 된다. 이러한 편심 영향으로 거더 내측 상부플랜지에 휨변형이 일어나게 되어, 상부플랜지와 수직보강재 용접이음부에 반복하중에 의한 피로균열이 발생되고 있는 것으로 보고되고 있다. 본 연구에서는 공용중인 강철도 플레이트거더교를 대상교량으로 하여 공용하중에 대한 구조해석을 실시하였다. 대상교량에 대한 현장계측을 기초로 구조모델링을 검증하였고, 검증된 구조모델링을 사용하여 열차하중 하에서의 상부플랜지와 수직보강재 용접연결부에서의 피로균열 보강방안에 대한 구조해석을 실시하였다. 또한 상부플랜지와 수직보강재 용접이음부 상세해석을 통하여 피로균열 발생위치를 확인하고 연결이음부의 적절한 보강방안을 제시하고자 한다.

  • PDF

Development of the Purlin Hanging System Form for the Girder Bridge Slab and Economic Analysis (거더교 상판 콘크리트 타설용 거푸집 개발 및 경제성 분석)

  • Lim, Jeeyoung;Kim, Sunkuk;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.3
    • /
    • pp.271-278
    • /
    • 2016
  • In the case of South Korea, steel girder bridge (steel box or H-steel) and PSC (Pre-Stressed Concrete) girder bridge are the representative upper structures of railroad and road bridges. These structures account for 75% of the total bridge constructions and 80% of the total construction cost. Since the form work for concreting bridge slab is difficult, various construction methods developed and applied. However, several problems in those methods did not solve partially, including cost increase by material loss and rise of labor costs, quality deterioration by unskilled workers, increased construction time by complicated method, reduced productivity, safety accident by high place work, difficult transportation by big member, and rise of maintenance cost by material characteristic. Alternative method is needed to solve problems of as-is methods. Therefore, the purpose of this study is development of the purlin hanging system form for the girder bridge slab and its economic analysis. Through the findings of this study, it was verified that the purlin hanging system form is possible 60% reduction in cost and 80% reduction in time as comparison with conventional method.

A Study on the Characteristics of Dynamic Behaviors for Continuous PSC Girder Bridges with Integral Pier Cap (교각일체형 연속 PSC 거더교의 동적거동 특성 연구)

  • Jeong, Young Do;Koo, Min Se;Yi, Seong Tae;Kim, Hee Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.1
    • /
    • pp.94-105
    • /
    • 2013
  • Recently, the construction industry has been changed in such a way that the cost for bridge construction should be optimized or reduced. Therefore, bridges are required be cost-effective in terms of initial construction as well as in the maintenance during service stage. In order to reduce the cost for bridge construction, the Rahmen typed structure, in which the bridge components from superstructure to substructure are integral, has many advantages to reduce the size of structural members including girders, since the loadings from superstructure may be transferred to substructure through the connecting rebars such as stud, etc. This paper studied on the continuous Up and Down Prestressed Concrete (UD PSC) girder bridge in which the reinforced concrete pier cap is integral with the part of girders in superstructure. In previous studies, it is known that the structural behavior of continuous UD PSC girder bridge is quite different compared to the one of the bridges with conventional bearings or shoes to support the loading from girders. Nevertheless, it has hardly been studied about the structural behavior of bridge with UD PSC girder. Therefore, in this study, various dynamic behaviors of continuous UD PSC girder bridge with integral pier cap have been analyzed using numerical method. Furthermore, an equation to evaluate the impact factor is suggested for the UD PSC girder bridge which has two to three continuous spans.