• Title/Summary/Keyword: 개인 및 공용공간

Search Result 22, Processing Time 0.017 seconds

A Study on the Operation Plan of Powered Wheelchair and Electric Scooter Charging Station (전동휠체어 및 전동스쿠터 충전소 운영 방안 연구)

  • Kim, Seung Eon;Kim, Kyung Sik;Kang, Jung Bae;Song, Byung Seop
    • 재활복지
    • /
    • v.21 no.2
    • /
    • pp.191-216
    • /
    • 2017
  • Recently, according to demands for a mobility right of people with disabilities, the use of powered mobility device has been rapidly increased and recharging facilities have been set up in many places of country. But the standards for the installation and management of the facilities are not clear and many problems are brought up in operating the facilities. Therefore, regulations and realities of recharging facilities were investigated and the user survey was progressed. On the basis of the research results, a rational and efficient installation and management plan was drawn up. The plan suggests that the recharging facilities should be installed in a building managed by government and many kinds of public building like library, theater, sports facilities, department store, museum, etc. Further, the recharging facilities should secure independent place which have specified area for protecting of privacy and provide some amenities for people with disabilities to enhance the conveniences.

A re-appraisal of scoring items in state assessment of NATM tunnel considering influencing factors causing longitudinal cracks (종방향균열 영향인자 분석을 통한 NATM터널 정밀안전진단 상태평가 항목의 재검토)

  • Choo, Jin-Ho;Yoo, Chang-Kyoon;Oh, Young-Chul;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.479-499
    • /
    • 2019
  • State assessment of an operational tunnel is usually done by performing visual inspection and durability tests by following the detailed guideline for safety inspection (SI) and/ or precision inspection for safety and diagnosis (PISD). In this study, 12 NATM tunnels, which have been operational for more than 10 years, were inspected to figure out the cause of longitudinal cracks for the purpose of modifying the scoring items in the state assessment NATM tunnel related to the longitudinal crack and the thickness of concrete lining. All investigated tunnels were classified into four groups depending on the shape and usage of each tunnel. The causes of longitudinal crack occurrence were analyzed by investigating the correlations between the longitudinal crack and the following four factors: the patterns of ground excavation; construction state of primary support system; characteristics of material properties of the concrete lining; and thickness of lining which was obtained by Ground Penetration Radar (GPR) tests. It was found that influencing factors causing longitudinal cracks in the lining were closely related with the construction condition of the primary support system, i.e. shotcrete, rockbolt, and steel-rib; crack occurrences were not much affected by the excavation patterns. As for the properties of concrete lining materials, occurrence of the longitudinal crack was mostly affected by the following three items: w/c ratio; contents of cement; and strength of lining. When estimating the lining thickness of the concrete lining by GPR tests and taking thickness effect into account in the statement assessment, it was concluded that increase of the index score by an average of 0.03 (ranging from 0.01 up to 0.071) is needed; a more realistic way of state assessment should be proposed in which the increased index score caused by lack of lining thickness should be taken into account.