Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.5
/
pp.35-44
/
2018
The purpose of this study was to derive the factors that affect the development cost and the priority/weight of effectiveness in the pre-development stage of a service robot to estimate the development cost. In particular, the functions of service robots vary according to the field of application, and their prices are not only different but most of them are small-scale production; hence, a cost estimation is necessary. In this research, the factors affecting the service robot development cost in the process of service robot development and adding functions are classified as a functional factor while the factors that affect the entire development cost due to environmental causes, in which the service robot is operated or in the development process, are classified as an adjustment factor. The FGI was conducted to derive the factors and a Delphi survey was conducted among 84 domestic experts to determine the weights of the factors. As a result of the analysis, six functional factors (41 detailed criteria) and five adjustment factors (17 criteria) were derived, the cost weight and rank of the factors were suggested. This study suggests that the development cost of the service robot can be used as a decision-making strategy to select the operation functions in the development process, and can be utilized as an essential tool for the service robot development.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.12
no.3
/
pp.211-217
/
2019
In this study, we compare and analyze the attributes of the software development cost model according to the shape parameters change of the Type-2 Gumbel lifetime distribution using the NHPP model. In order to analyze the software failure phenomena, the parametric estimation is applied to the maximum likelihood estimation method, and the nonlinear equations are calculated using the bisection method. As a result, when the attributes of the cost curves according to the change of shape parameters are compared, it is found that the larger the number of shape parameters, the lower the software development cost and the faster the release time. Through this study, it is expected that it will be helpful for the software developers to search for the development cost according to the software shape parameters change, and also to provide the necessary information for the attributes of the software development cost.
데이터베이스에 대한 논의 중 비용 산정에 대한 연구는 그리 큰 성과를 얻지 못했다. 그동안 논의는 많이 되었으나 실질적으로 데이터베이스 비용산정에 대해 집중적으로 연구한 것은 미비하다고 할 수 있다. 본고는 그러한 데이터베이스 비용산정에 대한 방향 설정과 이후 연구 과제에 대해 기술하고 있어서 향후 데이터베이스 비용산정에 기초 자료로 제공되기를 기대한다.
Proceedings of the Korea Information Processing Society Conference
/
2014.11a
/
pp.632-633
/
2014
군용장비를 시험하고 훈련하는데 사용되는 모의 소프트웨어는 체계마다, 장비마다 새로이 개발된다. 따라서 모의 소프트웨어를 설계, 개발하는 시간이 길어지고 관리 비용도 늘어난다. 이러한 비용을 줄이고자 본 논문에서는 모의 소프트웨어 개발을 위한 어플리케이션 프레임워크를 제안한다. 먼저 모의 소프트웨어가 공통으로 설계될 수 있는 부분을 추출하고, 이를 어플리케이션 프레임워크에서 미리 만들어진 형태로 제공한다. 여기서 추출한 공통 설계 구조는 다른 장비와의 연동을 위해 메시지를 주고 받는 인터페이스를 구현하는 부분이다. 이 인터페이스를 일관성 있게 개발하기 위하여 코드 생성 프로그램의 형태로 어플리케이션 프레임워크를 설계하였다. 설계된 어플리케이션 프레임워크는 일관된 개발 환경을 제공하여 모의 소프트웨어 개발 시, 설계 및 개발 시간을 줄이고 관리비용을 줄일 것으로 기대된다.
In this study, industry-specific application systems operation cost estmation models are suggested. We reviewed operation cost models of previous researches, and developed a strong need for industry-specific operation outsourcing cost models. Security industry operation cost model and medical care industry outsourcing cost model are proposed, and tested with empirical data. We showed the validity of industry-specific application systems outsourcing cost models. Future research will be needed to develop outsourcing cost models for other industries and to refine cost models developed in this study.
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.119-119
/
2015
스마트워터그리드의 목적은 기존 용수부족 문제의 근본적인 해결을 위해 새로운 취수원을 개발하고, 지역 내의 수자원을 효율적으로 활용하는 방안을 강구하는 시스템을 구축하는데 있다. 따라서 운영비용을 최소화하면서 수요처에 적정한 수량과 수질의 용수를 공급할 수 있도록 해야한다. 스마트워터그리드 구축 시 설비 비용에 대한 부담으로 보급 확산에 어려움을 겪을 가능성이 높으므로, 비용 효과적(Cost-effective)인 측면에서 스마트워터그리드의 경제성을 검토할 필요성이 있다. 본 연구에서는 자료의 한계로 인해 기존의 다중수원에 대한 경제성분석 사례를 인용하여 상수도 생산원가 절감액, 댐 건설과 관련된 비용의 감소, 물 오염 감소 등으로 편익을 간접적으로 계산하고, 기술적으로 물량이 충분하다는 가정하에 다중수원들간의 비용효과분석 수행하였다. 분석결과, 현재 공급하고 있는 상수도 시스템이 다른 다중취수원에 비해 비용효과적 우위에 있는 것으로 나타났다. 지하수, 해수담수화 등 새로운 수원을 찾는 노력이 필요하며 지하수는 가장 쉽게 활용할 수 있는 대체 수원이지만, 관정개발에 많은 비용이 들고 대량으로 수원을 공급하기 어렵다는 단점이 있다. 해수담수화는 대체수자원으로서 중요성이 더욱 강조될 것으로 보이지만, 시설의 설치 및 운영에 드는 높은 비용과 함께 육지에서 물을 대량으로 연안에서 멀리 떨어져 있거나 고도가 높은 지역은 해수담수화 기술의 적용이 어려울 것으로 여겨진다.
Korean Journal of Construction Engineering and Management
/
v.17
no.1
/
pp.3-9
/
2016
This study proposes a approximate cost estimation system based on Excel with VBA using weighted CBR(Case Based Reasoning). One characteristic of this system is that it generates the sheet automatically as many as the number of similar case and new estimation when it performs a case learning and a new estimate and cell formula is automatically entered into each sheet. User can be free to compose a combination of attribute factors because they can select up to ten attribute factors. This paper presents an applicability of estimation model for estimating the soil remediation cost when it use a landfarming method. When compared to a estimation model by using average unit cost and optimum multiple regression, this model shows a better result. This study was aimed at landfarming method, but it is expected that a cost estimation model using CBR will be more likely to apply in soil remediation technologies which various remediation technologies and pollutant species exist.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.305-310
/
2001
The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.4
/
pp.1639-1650
/
2013
Road pavement management is an important activity that affects to national economy, movement and safety of people, and also demands huge amount of budget. Therefore, its management strategy must be established under objective information. In addition, decision support system that produces the management strategy needs to consider practical benefits from various aspects. Considering these aspects, this paper aimed to develop a customized Korean life cycle cost analysis model estimating various effects on road users and socio-environmental costs based on pavement condition. The suggested LCCA model focused on Korean national highway, and tried to adopt a national guideline recommended by Korean government for securing credibility of estimation results. In the development processes, some of the suggestions that do not fit well in the situations of pavement management field were added, altered, or partially modified. These attempts to develop customized asset management system would be an important step to break away from passive attitudes relying on ready-made software, but also to improve awareness about the social benefits from the better maintenance strategy.
세계 각국에서는 군용차량을 획득하고 개발, 운용함에 있어 개발 비용(경제성)이 부차적인 요소가 아니라 핵심적인 결정 요소로 작용하고 있다. 따라서 우리 군도중전술차량을 개발할 때 비용을 절감하면서 성능을 향상시킬 수 있는 방안 – 현존 차량의 개량, 개조와 병행해서 상용 차량의 군용화 방안 – 으로 모색하여야 할것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.