• Title/Summary/Keyword: 개량형 듀로메타

Search Result 2, Processing Time 0.013 seconds

A Study on the Estimation of Setting Time for High Strength Concrete Using Durometer (개량형 Durometer를 이용한 고강도 콘크리트의 응결시간 추정 가능성 분석)

  • Sin, Se-Jun;Han, Soo-Hwan;Hyun, Seung-Yong;Kim, Jong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.87-88
    • /
    • 2020
  • The purpose of this study is to explore the possibility of estimating optimum surface finish time of the fresh concrete placed at the job site by applying a surface hardness test meter(Durometer). Tests are carried out by measuring and comparing the Penetration resistance test and hardness test by Durometer. Penetration resistance tester and improved Durometer are similar, but the higher the temperature, the higher the setting time, and the higher the correlation was shown. When the hardness value of the improved Durometer is about 50 HD, it is found that the initial and 80 HD represent the end. It is expected that this will be useful in determining the finish time of the surface at the actual site.

  • PDF

A Study on the Estimation of Setting Time for Concrete Using Durometer (개량형 Durometer를 이용한 콘크리트의 응결시간 추정 가능성 분석)

  • Sin, Se-Jun;Han, Soo-Hwan;Hyun, Seung-Yong;Kim, Jong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.169-170
    • /
    • 2020
  • The purpose of this study is to explore the possibility of estimating optimum surface finish time of the fresh concrete placed at the job site by applying a surface hardness test meter(Durometer). Tests are carried out by measuring and comparing the Penetration resistance test and hardness test by Durometer. Penetration resistance tester and improved Durometer are similar, but the higher the temperature, the higher the setting time, and the higher the correlation was shown. When the hardness value of the improved Durometer is about 50 HD, it is found that the initial and 80 HD represent the end. It is expected that this will be useful in determining the finish time of the surface at the actual site.

  • PDF