• Title/Summary/Keyword: 강-PSC 연결부

Search Result 10, Processing Time 0.026 seconds

Behaviors of Joints with Perfobond Rib Shear Connectors in Steel-PSC Hybrid System (Perfobond Rib을 적용한 강-PSC 혼합구조 연결부의 거동 평가)

  • Kim, Sang Hyo;Lee, Chan Goo;Yoon, Ji Hyun;Won, Jeong Hun
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.6
    • /
    • pp.647-657
    • /
    • 2009
  • This paper studies the behavior of joints in steel-PSC (prestressed concrete) hybrid beams, which is necessary for the application of hybrid beams to spliced girder bridges, and proposes a new type of joint with improved construction convenience and structural behavior. In the proposed joint, perfobond rib shear connectors are attached to the upper and lower plates, which are expanded from the steel girders and located between the steel girder and the PSC girder. The experimental tests were performed on hybrid beams with the suggested joint. The results showed that all the beams had similar ultimate strengths and failure modes, due to the failure of their PSC parts. The composite action of the perfobond ribs was verified by examining the initial stiffness and cracks of the test beams. In addition, the test beams showed a higher degree of ultimate strength than the beams with stud shear connectors in the joints that had been previously studied. Thus, the proposed joint is effective for the steel-PSC hybrid beam.

An Experimental Study for Joints in Hybrid PSC-Steel Beam with Perfobond rib (Perfobond rib을 적용한 PSC-강 복합구조 연결부 거동에 대한 실험적 연구)

  • Won, Jeong-Hun;Park, Se-Jun;Yoon, Ji-Hyun;Kim, Sang-Hyo;Lee, Chan-Goo;Kim, Sung-Jae
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.17-20
    • /
    • 2008
  • This study presents experimental results of Steel-PSC hybrid beams having a rear plate joint with a perfobond rib shear connector between the steel girder and the prestressed concrete girder. Three specimens of 3.9m length(3.6m span length) were tested to evaluate the flexural characteristics of the joint under the condition of the three point loading. Based on load-deflection curves and failure modes of specimens by the experimental test, it is found that the proposed joint with the perfobond rib shear connector shows the higher strength and initial stiffness and the sufficient ductility. Therefore, the suggested perfobond rib shear connector can perform effectively as the joint of the Steel-PSC hybrid structural system.

  • PDF

An Experimental Study on Flexural Behaviors of Hybrid PSC-Steel Beam with Perfobond rib connectors (Perfobond rib 전단연결재로 연결된 PSC-강 혼합구조 보의 휨 거동 실험)

  • Yoon, Ji-Hyun;Won, Jeong-Hun;Kim, Sang-Hyo;Lee, Chan-Goo;Kim, Sung-Jae
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.101-102
    • /
    • 2009
  • This paper presents experimental results of a PSC-steel hybrid beam connected with the joints which has perfobond rib shear connectors. The flexural behaviors and failure modes are investigated to verify the structural capacity of a tested hybrid beam.

  • PDF

Verification of experimental test for PSC-Steel-PSC hybrid beam using nonlinear FEM analysis (비선형 FEM 해석을 이용한 PSC-Steel-PSC 혼합구조 보의 휨 실험 검증)

  • Kim, Sang-Hyo;Won, Jung-Hun;Park, Se-Jun;Lee, Chan-Gu
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.517-520
    • /
    • 2009
  • 본 연구에서는 비선형 FEM 해석을 이용하여 PSC(Prestressed concrete)와 강으로 구성된 혼합구조 보의 휨 실험을 검증하였다. 혼합구조 보의 거동에 가장 큰 영향을 미치는 연결부는 Perfobond rib로 구성된 경우와 스터드로 구성된 경우를 고려하였다. 이종 재료가 접하는 경계면의 상호 작용에 대해 완전합성과 부분합성인 경우를 고려하여 혼합구조 보의 비선형 해석을 수행한 후 해석 결과와 실험 결과를 비교하였다. 하중-처짐관계, 파괴 형상 등의 해석 결과를 실험 결과와 비교한 결과, 부분합성을 고려한 모형이 실험 결과와 유사한 거동을 보였으며 또한 Perfobond rib를 갖는 실험체가 스터드를 갖는 실험체보다 해석 결과와 비교 시 안전측의 결과를 나타냈다.

  • PDF

The Structural Performance of PSC Frame System with GerberCs beam (게르버 보 형식의 PSC 골조시스템의 구조성능)

  • Kim, Sang-Sik;Choi, Kwang-Ho;Lee, Jong-Gyu;Song, Hun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.341-346
    • /
    • 2002
  • 이 연구는 게르버 보 형식의 포스트텐션 PC 골조 구조 시스템의 실용화를 위해 골조 전체의 구조 성능 시험을 수행하며, 여기서 보-기둥 접합부 및 내민 보-단순 보 접합부의 구조 성능과 골조의 안전성을 확인한다. 시험은 400 mm$\times$800 mm 단면의 경간 3 m 보와 500 mm$\times$600 mm 단면을 갖는 높이 3 m 기둥의 실물 크기 시험체를 제작하여, 기둥에 80 톤의 축 하중을 준 상태에서 단순 보 중앙에 하중을 가력하여 기둥-보 접합부와 단순 보-내민 보 단면 축소 연결부의 구조성능을 파악한다. 시험 결과, 보 - 기둥 접합부는 예상 설계 하중 40톤 이상에서도 강 접합에 가깝게 거동하였고, 단순 보- 내민 보의 단면 축소 연결부는 경사철근의 사용으로 초기 균열 및 균열 확산에 대한 억제 효과가 있었으며, 예상 설계 전단력 40톤에서 안전하다는 것이 확인되었다.

  • PDF

Flexural Experiment of PSC-Steel Mixed Girders and Evaluation for Analyses on Tangentional Stiffness of Connection (프리스트레스트 콘크리트-강 혼합거더의 휨 실험 및 경계면 수평계수 분석)

  • Kim, Kwang-Soo;Jung, Kwang-Hoe;Sim, Chung-Wook;Yoo, Sung-Won
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.2
    • /
    • pp.231-237
    • /
    • 2008
  • This study was performed to evaluate joint behavior of prestressed concrete(PSC)-steel mixed girders through the flexural test of 14 beams according to embedded length, amount of reinforcing steel, stud arrangement, and prestressing force. All test beams were failed by turns of desertion of reinforcing steel, stud, and steel plate. From test results, prestressing force was more effective on performance of connection than stud arrangement and reinforcing steel. And the spacing of stud is also more effective than embedding length. This paper also presented 3D nonlinear analysis considering the slip of composite section as well as the static load tests of PSC-steel mixed girders. According to the slip modulus, the nonlinear analysis showed that the behavior of hybrid girders could be divided into three parts as full-composite, partial-composite and non-composite. However, the experimental results showed that the PSC-steel hybrid girders with shear connectors took the part of partial composite action in ultimate load stage. In addition, it was founded that stud shear connectors and welded reinforcements were contributed to improve the ultimate strength of hybrid girders for about 20%.

Analysis of the Composite Section in PSC-Steel Hybrid Girder (PSC-강 혼합거더의 연결부 거동 해석)

  • Kim Kwang Soo;Jung Kwang Hoe;Shim ChungWook;Yoo Sung Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.766-769
    • /
    • 2004
  • This paper presents 3D nonlinear analysis considering the slip of composite section as well as the static load tests of PSC-Steel hybrid girders. According to the slip modulus, the nonlinear analysis shows that the behavior of hybrid girders could be divided into three parts as full-composite, partial-composite and non-composite. However, the experimental results show that the PSC-Steel hybrid girders with shear connectors take the part of partial composite action in ultimate load stage. In addition, the load test results give that stud shear connectors and welded reinforcements have contributed to improve the ultimate strength of hybrid girders for about $20\%$.

  • PDF

Development of Prefabricated Voided-Slab Bridge Using PSC-I Girders (프리캐스트 I형 거더를 이용한 조립식 중공슬래브교 개발)

  • Kim, Hyun-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.6
    • /
    • pp.742-752
    • /
    • 2017
  • The bridge type of steel concrete composite rahmen or pre-flex has been applied where a lower depth girder is required due to vertical clearance restrictions caused by the crossing of rivers and roads. On the other hand, because these types are not only complicated to manufacture and construct, but also expensive, void slab bridges may be an alternative. In this study, prefabricated PSC-I shape girder was used to make a void slab and all procedures for bridge development, such as analysis, design, fabrication, and real-scale test, were included in the scope of research. The results of this study will provide sufficient background data to be applied to the field and the structural safety has been verified through experiments.

Experimental Study on Static Behavior of Laterally Strengthened Spliced Prestressed Concrete Girder using Bending Moment Connector (휨연결재에 의해 횡방향으로 보강된 분절 프리스트레스트 거더의 정적거동에 관한 실험적 연구)

  • Kim, Jae Heung;Kim, Jang-Ho Jay;Kim, Sung Bae;Yi, Na Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.287-295
    • /
    • 2010
  • The main purpose of this study is to investigate the static behavior of spliced prestressed concrete girder with bending moment connector and lateral prestressing. Four (4) spliced girders and one (1) monolithic girder had been fabricated and tested to compare their static behaviors. Same geometry and materials are used to fabricate these spliced and monolithic girders. A monolithic girder and one (1) spliced girder without lateral bending connector are used as control specimens to estimate the performance of three (3) spliced girders with lateral bending connector. Deflections at the middle of girders have been measured for evaluation. Also, strains of the concrete at the middle of span and connection points have been measured. It was found from the result that laterally strengthened spliced girders showed improved ultimate strength but less stiffness compared to the monolithic girder at the ultimate state. Laterally strengthened spliced girder also showed improved strength as well as improved stiffness compared to the spliced girder without lateral strengthening.

Stress Variation Characteristics of Temporary Fixed Steel Rod in FCM Bridge Construction Method (FCM 교량 가설 공법에서 임시 고정 강봉의 응력 변화 특성 )

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.21-29
    • /
    • 2023
  • In this study, the stress characteristics of temporary fixed steel rods were analyzed in the "temporary fixing system using internal prestressing tension", which is mainly applied to the construction of superstructures by FCM. It was difficult to confirm the changes in initial tensile force in this system because the steel rod was internally connected to the pier and the PSC BOX. Therefore, measurement was performed before and after the completion of each segment using an FBG sensor to measure the change in the micro length of the steel rod. The results of the analysis showed that 75% to 90% of the maximum vertical contraction of the steel rod that occurred until the completion of the cantilever segment occurred in the fixing ~ 1segment, and the maximum loss of initial prestressing force was 39%. Such excessive loss of tension force to 1 segment means that tension is needed to improve the precision of construction during the fixation, and re-tension is needed to secure stability for conduction of cantilever segments after the completion of 1segment. In the 2 ~ last segment, the stress of the steel rod decreased gradually, and in the summer, the decrease in stress tended to partially recover due to the increase in the length of the steel rod corresponding to the increase in the vertical volume of PSC BOX. The dominant factor in the stress change in 2~ last segment in this phenomenon is judged to be the change in the length of the steel rod according to the temperature. Unlike the change in length, the relaxation was 1.2-2.7%, which was mostly offset by the opposite stress corresponding to the temperature stress. Therefore, a plan was proposed to improve the internal stress, such as adjusting the fixation time.