• Title/Summary/Keyword: 가시도 해석

Search Result 260, Processing Time 0.031 seconds

Talbot imaging of periodic amplitude objects and its visibility (주기적인 진폭격자들에 의한 Talbot 결상 및 가시도 분석)

  • Kim, Young-Ran;lee, Seung-Bok;Jo, jae-Heung;Chang, Soo;Rim, Cheon-Seog
    • Korean Journal of Optics and Photonics
    • /
    • v.12 no.2
    • /
    • pp.83-90
    • /
    • 2001
  • The Talbot effect for periodic objects with the spatial period p illuminated by expanded coherent light is analyzed by Fresnel diffraction theory, and the Talbot distance (Zr) at which we can observe 1: 1 imaging without any lenses can be defined. We confmned experimentally the Talbot imaging of line, circular, X -type and '||'&'||'copy;-type 2 dimensional alTay gratings at ZT. At the same time, we observed phase reversed Talbot imaging at Zr/2 and Talbot subimage with p/2 at Zr/4 and 3Zr/4. The visibility of Talbot images as a function of the number of slits of the input grating was measured by the FFf (Fast Fourier Transform) results of these images. As a result stationary maximum visibility of V = 0.25 was obtained from grating numbers with more than 15 slit pairs.

  • PDF

Parametric Study for Seismic Design of Temporary Retaining Structure in a Deep Excavation by Dynamic Numerical Analysis (동적수치해석을 이용한 대심도 흙막이 가시설 내진설계 변수연구)

  • Yang, Eui-Kyu;Yu, Sang-Hwa;Kim, Dongchan;Kim, Jongkwan;Ha, Ik-Soo;Han, Jin-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.12
    • /
    • pp.45-65
    • /
    • 2022
  • In this paper, a diaphragm wall that supports soils and rock was modeled using FLAC, a finite difference analysis program, to evaluate the seismic behavior of temporary retaining structures in a deep excavation. The appropriateness of the numerical model was verified by comparing its results with those of the centrifuge test performed in a similar condition. The bending moment distribution along the diaphragm wall shows a very similar tendency, and the maximum acceleration obtained at the backfill and top of the wall shows a difference within 5%. Based on the developed model, a parametric study was conducted in various input earthquake, ground, and excavation conditions. The maximum structural forces and bending moment under earthquake loading were compared with the maximum values during excavation, from which the critical condition that requires a seismic design was roughly sorted out. The maximum bending moment of a wall that retains soil layers increased 17%. Particularly, the axial force of struts located in loose soils increased 32% under 100 years return period of an earthquake event, which strongly is estimated to require seismic design for structural safety.

Applicability of Pseudostatic Analysis for the Seismic Design of Temporary Retaining Structures in a Deep Excavation (흙막이 가시설 내진설계를 위한 등가정적해석의 유효성 분석)

  • Yu, Sang-Hwa;Kim, Dong-Chan;Kim, Jongkwan;Han, Jin-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.9
    • /
    • pp.35-50
    • /
    • 2023
  • A preliminary study is conducted to develop seismic design guidelines for temporary retaining structures in a deep excavation. The study involved a comprehensive literature review of the seismic design standards applied domestically and internationally, as well as various methods to calculate seismic earth pressure for pseudostatic analysis. The FLAC 2D, a two-dimensional finite difference analysis program, was utilized to perform pseudostatic analysis using the Semirigid pressure method, Wood method, and Mononobe-Okabe method. The resulting analysis data for the wall moment and axial force of the strut were compared with the dynamic analysis outcomes to evaluate the applicability of pseudostatic analysis. The Semirigid pressure method predicted the most reasonable moment for Stiff walls experiencing horizontal displacements up to 0.4%H. Predicting the axial force of the strut exactly was challenging because the pseudostatic analysis cannot consider dynamic soil-structure interaction; however, it is deemed available for conservative preliminary review to ensure safety.

A Study on the Optimal Location of the Inclinometer and Strain Gauge in Small-Scale Underground Excavation (소규모 지하굴착에서 지중경사계와 변형률계의 최적 위치 선정에 대한 연구)

  • Gichun Kang;Jinuk Park;Byeongjin Roh;Jiahao Sun;Seong-Kyu Yun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.2
    • /
    • pp.23-33
    • /
    • 2023
  • Currently, there are cases in Korea where economic damage has occurred due to the ambiguity instrument installation and operation standards in the construction of temporary earth retaining wall, failing to prevent collapse of temporary earth retaining wall at the construction site in advance. Therefore, in this study, a numerical analysis was conducted to find the appropriate installation location of the inclinometer and strain gauge among the installed instruments shown in the design drawing of the temporary earth retaining wall. As a results, It was found that the installation position of the underground inclinometer is the corner of the retaining wall in the case of plane-deformation analysis, and the most displacement occurs in the center of the excavation surface in the case of 3D analysis. When the stress and moment are comprehensively analyzed, the corner is judged to be a vulnerable point. In the case of the strain gauge, In plane-deformation analysis and 3D analysis, the maximum bending stress occurred at the wale connection where the end of the strut and the counter strut are in contact. At this point, it is analyzed that it is necessary to focus on installing and managing the connection to prevent accidents from being vulnerable.

Implementation of the Equalization Circuits for High Bandwidth Visible Light Communications Using Phosphorescent White LED (인광성 백색 LED의 가시광 통신 변조 대역폭 향상을 위한 등화기 구현)

  • Sohn, Kyung-Rak
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.4
    • /
    • pp.473-477
    • /
    • 2015
  • In this paper, a commercial phosphorescent white light-emitting diode (WLED) visible light communication (VLC) system with an equalization circuit to achieve the high modulation bandwidth was designed and demonstrated. An analytical method to examine the performance of the equalizer was carried out using a general circuit-simulator, PSpice. The equalization circuit was composed of two passive filters with resisters and a capacitor and an active filter with an op-amp. Utilizing our post-equalization technology, the ~3.5 MHz bandwidth of phosphor WLED could be extended to ~25 MHz without using an optical blue-filter. In this VLC system with a single round-type WLED and a single PIN photo-diode, ASK data transmission up to 35 Mbps at a 1m free space distance was obtained. The resulting bit-error-rate was $7.6{\times}10^{-4}$, which is less than the forward error correction (FEC) limit of $3.8{\times}10^{-3}$.

Analysis of Dynamic Crack Propagation using MLS Difference Method (MLS 차분법을 이용한 동적균열전파 해석)

  • Yoon, Young-Cheol;Kim, Kyeong-Hwan;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.1
    • /
    • pp.17-26
    • /
    • 2014
  • This paper presents a dynamic crack propagation algorithm based on the Moving Least Squares(MLS) difference method. The derivative approximation for the MLS difference method is derived by Taylor expansion and moving least squares procedure. The method can analyze dynamic crack problems using only node model, which is completely free from the constraint of grid or mesh structure. The dynamic equilibrium equation is integrated by the Newmark method. When a crack propagates, the MLS difference method does not need the reconstruction of mode model at every time step, instead, partial revision of nodal arrangement near the new crack tip is carried out. A crack is modeled by the visibility criterion and dynamic energy release rate is evaluated to decide the onset of crack growth together with the corresponding growth angle. Mode I and mixed mode crack propagation problems are numerically simulated and the accuracy and stability of the proposed algorithm are successfully verified through the comparison with the analytical solutions and the Element-Free Galerkin method results.

Hydrological cycle analysis of the Seolma-Cheon experimental catchment using observation data (관측자료를 이용한 설마천 시험유역의 물순환 해석)

  • Kim, Dong-Phil;Jung, Sung-Won;Kim, Sung-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.776-780
    • /
    • 2005
  • 한국건설기술연구원에서 운영하고 있는 설마천 시험유역을 대상으로 관측자료를 이용하여 물순환 해석을 수행하고자 기초자료로 강우량, 유출량, 지하수이용량, 지하수위 변화에 의한 유역 저류량 등의 관측자료를 수집하여 2004년의 연간 물수지 분석을 수행하였다. 설마천 시험유역의 유역의 물순환 구조는 자연계의 유입과 유출이 지배적이며, 이들의 수문성분을 규명하기 위해서는 각각의 수문성분들의 관측 및 해석이 필요하며, 각 수문성분들의 물수지 분석을 통하여 정량적인 합의 결과를 가시적으로 확보함이 매우 중요하다. 신뢰도와 정확성에 근거한 관측자료를 이용한 물순환 해석결과는 수문성분들의 총체적 표현이라 할 수 있는 모형(model)의 중요 입력자료이며, 모형의 분석결과를 검증할 수 있는 중요한 기준이 된다 설마천 시험유역에 기 설치된 수문모니터링 자료로 물순환 해석을 수행하는 데는 부족함이 있다. 따라서, 추가적인 수문관측 및 모니터링이 필요하며, 지속적인 수문모니터링이 이루어진다면 보다 구체적인 물순환 관계를 규명할 수 있을 것으로 기대된다.

  • PDF

Hydrological cycle analysis of the small mountainous catchment (산지 소하천 유역의 물순환 해석)

  • Kim, Dong Phil;Hwang, Seok Hwan;Jung, Sung Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.676-680
    • /
    • 2004
  • 산지 소하천인 설마천 시험유역의 물순환 해석을 위한 기초자료로 강우량, 유출량, 지하수이용량, 지하수위 변화에 의한 유역 저류량 등의 관측자료를 이용하여 민간 물수지 분석을 수행하였다. 설마천 시험유역의 유역의 물순환 구조는 자연계의 유입과 유출이 지배적이며, 이들의 수문성분을 규명하기 위해서는 각각의 수문성분들의 관측 및 해석이 필요하며, 각 수문성분들의 물수지 분석을 통하여 정량적인 합의 결과를 가시적으로 확보함이 매우 중요하다. 신뢰도와 정확성에 근거한 관측자료를 이용한 물순환 해석결과는 수문성분들의 총체적 표현이라 할 수 있는 모형(model)의 중요 입력자료이며, 모형의 분석결과를 검증할 수 있는 중요한 기준이 된다. 설마천 시험유역에 기 설치된 수문모니터링 자료로 물순환 해석을 수행하는 데는 부족함이 있다. 따라서, 추가적인 수문관측 및 모니터링이 필요하며, 지속적인 수문모니터링이 이루어진다면 보다 구체적인 물순환 관계를 규명할 수 있을 것으로 기대된다.

  • PDF

Countermeasure against the Increse of Axial Force in Strut due to Thermal Load-A Case Study (온도하중에 의한 버팀보 축력증가 대책사례)

  • Kwon, Oh-Sung;Lee, Jong-Sung
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.193-198
    • /
    • 2006
  • 서울지하철 0호선 000 공구 000 정거장 구간은 버팀보 7단, 어스앵커 2단, 그리고 록볼트 3단의 개착식 가시설로 설계되어 있다. 버팀보 및 앵커 축력 계측을 위해 변형률계 및 하중계를 설치하고 연속계측 중, 4~6단 버팀보 수 개소에서 5월부터 하중이 급격히 증가하엿다. 따라서 굴착작업을 즉시 중단하고 관리기준치를 초과하는 하중이 계측된 STA.9k+750~800 구간의 5, 6단 버팀보 위치에 격간으로 총 20본(10본${\times}$2단), 그리고 STA.9k+900~920 구간의 7단 버팀보 위치에 격간으로 총 9본(9본${\times}$1단)의 버팀보를 추가적으로 설치 완료하였다. 이 때, 추가 버팀보는 선행하중잭을 이용하여 10ton의 선행하중을 재하하였으며, 향후 추가 보강 필요시 재하하중 증가가 가능하도록 조치하였다. 또한, 추가 설치된 버팀보, 그리고 이상하중이 발생된 버팀보에 계측기를 추가 설치하여 지속적으로 계측중이며, 띠장의 변위발생 구간은 스티프너 및 앵글 등을 응급조치하였다. 본 사례 연구에서는 보강 전.후의 계측결과 및 수치해석적 분석을 이용하여 가시설 굴착시 버팀보의 하중증가 원인 및 보강 효과를 규명하고, 향후 추가 굴착시의 안정성 여부를 검토해 보고자 하였다. 계측값 분석 결과, 추가버팀보 보강 후의 기존버팀보 축력 계측 결과 보강 직후 기존버팀보의 축력이 어느정도 감소하였으며, 이후 시간이 지남에 따라 축력이 더 이상 증가하지 않고 일정한 값에 수렴하는 경향을 보였다. 또한 수치해석 결과 온도 증가가 버팀보 축력증가에 미치는 영향은 버팀보 위치의 지반강성이 클수록 크며, 축력증가는 온도증가에 대체적으로 비례하였고, 추가버팀보의 보강 효과는 선행하중의 크기에 비례하는 것으로 나타났으며, 잔여굴착은 전반적으로 기존 버팀보의 축력 증가에 영향을 미치는 것으로 나타났다. 따라서 추가굴착시 지속적인 계측을 수행하며, 급격한 축력증가가 관찰될 경우 현재 보강된 버팀보의 선행하중 추가 재하, 굴착에 가장 큰 영향을 받는 최하단 버팀보의 추가보강 등의 대책방안을 제시하였다.

  • PDF