Browse > Article
http://dx.doi.org/10.3741/JKWRA.2004.37.5.375

Flow Analysis of Parshall Flume Using FLOW-3D  

Oh, Byoung-Dong (한국수자원공사 조사기획처)
Kim, Kyoung-Ho (충북대학교 공과대학 토목공학)
Lee, Whan-Gi (한국수자원공사 기술본)
An, Sang-Do (한국수자원공사 설계처)
Publication Information
Journal of Korea Water Resources Association / v.37, no.5, 2004 , pp. 375-386 More about this Journal
Abstract
A water shortage is one of the most important factors for development and management of water resources. For reliable water shortage measurement in a stream, Korea Water Resources Corporation(KOWACO) founded five foot Parshall flume at Yong-dam experimental watershed in 2000. The Parshall flume has a specially designed shape to facilitate flow measurements by eliminating sediment deposition problem that could lead to an incorrect measurement. In this study, computational fluid dynamics(CFD) model was used to analyze flow behavior of Parshall Flume under free discharge of five headwater level cases. The flow rates computed by CFD model are compared with those by ISO's formula, USBR's formula and stage-discharge rating curves. Flow rates computed by ISO's and USBR's formula are mostly same, but flow rate by CFD model is larger than empirical value by 9% and flow rate by stage-discharge rating curves is less than empirical value by 16%.
Keywords
3D modeling; Parshall Flume; CFD; Water measurement;
Citations & Related Records
연도 인용수 순위
  • Reference
1 이길성, 김남일 (1997). '3차원 흐름해석을 위한 여수로 유입수로의 2차원 흐름해석.' 대한토목학회 학술발표회 논문집(II), pp. 71-74
2 한국수자원공사 (2003). 시험유역 운영(용담댐 상류 시험유역)-수자원의 지속적 확보기술개발사업. 2차년도 연구보고서
3 한국수자원공사 (2002). 2002년 용담댐 일원 하천유량측정등 수문조사 보고서, pp. 108-109
4 한국수자원공사 (1999). 갈수량측정 전용시설(Parshall flume)구축사업 실시설계보고서, pp. 19-30
5 Flow Science, Inc. (2000). FLOW-3D User's Manuals
6 Hirt, C.W. and Amsden, A.A. and Cook, J.L. (1974). An Arbitrary Lagrangian-Eulerian Computing Method for all Flow Speeds. J. comp. Phys. 14, 227   DOI   ScienceOn
7 Hirt, C.W. and Nichols, B.D. (1981). Volume of Fluid(VOF) Method for the Dynamics of Free Boundaries. J. comp. Phys. 39. No. 201   DOI   ScienceOn
8 Hirt, C.W. and Williams, K.A. (1994). FLOW-3D Predictions for free discharge and submerged Parshall flumes. USBR
9 Kim, N. (2003). Investigation of scale effects of hydraulic model for dam spillway using 3-D CFD model. Ph.D. dissertation, Seoul National University
10 ISO 9826 (1992). Measurement of liquid flow in open channels-Parshall and SANIIRI flumes. pp. 1-10
11 Nichols, B.D. and Hirt, C.W. (1971). Calculating Three-Dimensional Free Surface Flow in the Vicinity of Suvmerged and Exposed Structures. J. comp. phys. 12, 234
12 Reck, H. (1988). Submerged Flows in Parshall Flumes, Proceedings, National Conference, Hydraulics Division of the American Society of Civil Engineers, American Society of Civil Engineers, Colorado Springs, Colorado
13 USBR (1997). Water measurement manual. 3rd edition, pp. 8.40-8.60
14 USBR (1984). Water measurement manual. Revised reprint, pp. 43-85
15 안창진 (2003). 격벽식 분말활성탄 접촉조에 의한 이취미 제거 효율향상. 박사학위 논문, 충북대학교
16 ISO 8368 (1985). Liquid flow measurement in open channels - Guidelines for the selection of flow gauging structures. pp. 1-5
17 Wu, W., Rodi, W. and Wenka, T. (2000). 'Approximate Riemann Solvers in FVM for 2D Hydraulic Shock Wave Modeling'. Journal of hydraulics Engineering, ASCE, Vol.122, No. 12   DOI   ScienceOn
18 한국수자원공사 (2003). 2003년 용담댐 일원 하천유량측정등 수문조사 보고서, pp. 80-104
19 노성진 (2001). CFD를 이요한 장방형 침전지내 흐름의 수치모의, 서울대학교, pp. 3-17