1 |
Tamura, G. T., 1994, Smoke Movement and control in High-rise Buildings, National Fire Protection Association, Quincy, Massachusetts
|
2 |
Yu, J. Y., 2004, Evaluation of Stack Effect according to the Shape and the Window Area Ratios of Lobby in High-rise Buildings, Proceedings of CTBUH 2004 Conference
|
3 |
Tamblyn, R. T., 1991, Copying with Air Pressure Problems in Tall Buildings, ASHRAE Transactions, Vol. 97, Part 1, p. 826
|
4 |
Yu, J. Y., 2008, The design procedure for reducing stack effect problems in the tall complex building, proceedings of Indoor Air 2008
|
5 |
Tamblyn, R. T., 1993, HVAC system Effects for Tall Buildings, ASHRAE Transabtions, Vol.99, Part 2
|
6 |
Donald E. Ross, 2004, HVAC design guide for tall commercial buildings, ASHRAE
|