1 |
Han S. S. and Park B. H.(2010), "Comparative Analysis on the Delay Between Multi-legged Roundabout and Signalized Intersection," The Journal of The Korea Institute of Intelligent Transport Systems, vol. 9, no. 6, pp.83-93.
|
2 |
Kim N. H(2017), "A Study on the Operational Effects of Adjacent 5-Legged Roundabouts," Graduate school of Hanbat National University.
|
3 |
Kim T. Y., Kim K. H. and Park B. H.(2010), "Analysis on the effectiveness of roundabout at the diamond interchange using VISSIM," International journal of highway engineering, vol. 12, no. 4, pp.79-86
|
4 |
Lee D. W., Ko S. I. and Lee D. W.(2012), "Effectiveness Analysis of Transforming Many-Legs Type Intersection into Roundabout in Jeju," Journal of the Korean society of civil engineers, vol. 32, no. 6D, pp.623-636
DOI
|
5 |
Ministry of Land(2014), Infrastructure and Transport, Korea, Roundabout Design Manual.
|
6 |
Park B. H.(2014), "Applicability of Roundabouts to the Continuous 3 Signalized Intersections," Journal of the Institute of constructional technology, vol. 33, no. 1, pp.31-36
|
7 |
Park H. C.(2011), "Analysis of Measure of Effectiveness at 5-Legged Roundabouts - Focusing on the Okcheon Pgeori Intersection in Gangneung City," Graduate school of Kwandong University.
|
8 |
Park I. S.(2011), "A Study on Vitalizing Roundabouts : Focused on Roundabout in Dangjin-gun," Graduate school of Hanbat National University.
|
9 |
Seo, K. T.(2011), "A Study on the Operational Characteristics of Multi-Legged Roundabouts," Graduate school of Dankook University.
|