Analysis of multiple spurious operation scenarios of Korean PHWRs using guidelines of nuclear power plants in U.S. |
Kim, Jaehwan
(STANDARD Testing & Engineering Incorporated)
Jin, Sukyeong (STANDARD Testing & Engineering Incorporated) Kim, Seongchan (STANDARD Testing & Engineering Incorporated) Bae, Yeonkyoung (Fire Safety Group, Nuclear System Safety Lab., Central Research Institute, Korea Hydro and Nuclear Power Co.,Ltd) |
1 | CAN/CSA-N293-12, Fire Protection for Nuclear Power Plants, CSA Standards, 2012. |
2 | NEI 00-01(rev.3), Guidance for Post Fire Safe Shutdown Circuit Analysis, Nuclear Energy Institute, 2011. |
3 | Regulatory Guide 1.189(rev.2), Fire Protection for Nuclear Power Plants, U.S. Nuclear Regulatory Commission, 2009. |
4 | Wolsong Fire Hazard Analysis, Korea Hydro and Nuclear Power, 2011. |
5 | Y.S. Lee, H.S. Lim, I.H. Kim, Analysis of PHT pump seal leakage in CANDU reactors due to fire-induced multiple spurious operation, in: Transactions of the Korean Nuclear Society Autumn Meeting, 2018. |
6 | Y.S. Lee, Y.K. Bae, M.S. Kim, Analysis of multiple spurious operation scenarios for decay heat removal function of CANDU reactors, in: Transactions of the Korean Nuclear Society Autumn Meeting, 2016. |
7 | Notice No. 2015-11 of the Nuclear Safety and Security Commission, Technical Regulations Related to Fire Risk Analyses, Nuclear Safety and Security Commission, 2015. |