Browse > Article

The Section-3 of Yeosu National Industrial Complex Approach Road Turnkey Project : Innovation of Bridge Structural Systems to Realize the Super Long-Span Suspension Bridge  

Cho, C.Y. (㈜유신코퍼레이션 구조본부)
Lee, M.J. (㈜유신코퍼레이션 구조본부)
Kim, J.H. (대림산업㈜ 특수교량팀)
Song, M.G. (두산중공업㈜ 기술연구원 신재생에너지개발팀)
Publication Information
Computational Structural Engineering / v.20, no.3, 2007 , pp. 33-43 More about this Journal
Keywords
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ge, Y. J., Yang, Y. X., and Zou, X. J.(2005), "Flutter Stabilization and Its Mechanism of Long-span Suspension Bridges with Slotted Box Girders", The Sixth Asia-Pacific Conference on Wind Engineering (APCWE-VI), Seoul, Korea, September 12-14, pp. 1283-1295
2 대한토목학회(2006), 케이블 강교량 설계지침(안)
3 (주)대림산업, (주)유신코퍼레이션(2003), 현수교 -기술과 변천
4 Larsen, A. and Hui, C. H. M.(2002), "Aerodynamic Investigations for the Deck of Stonecutters Bridge Emphasizing Reynolds Number Effects", The Second Internatinal Symposium on Wind and Structures, Busan, Korea, August 21-23, pp. 649-656
5 Larsen, A. and Walther, J. H.(1997), "Aeroelastic Analysis of Bridge Girder Sections based on Discrete Vortex Simulations", Journal of Wind Engineering and Industrial Aerodynamics, 67&68, pp. 253-265   DOI   ScienceOn
6 방명석 譯(1993), 현대의 현수교