Evaluation of Seismic Performance of Prefabricated Bridge Piers with a Circular Solid Section |
Kim, Hyun-Ho
(중앙대학교 건설환경연구원)
Shim, Chang-Su (중앙대학교 건설대학 토목공학과) Chung, Chul-Hun (단국대학교 공과대학 토목공학과) Kim, Cheol-Hwan (포스코건설 기술연구소) |
1 | 심창수, '국내외 교량의 급속시공 관련 동향분석' 대한토목학회지, 제53권, 12호, 2005, pp. 39-46 |
2 | http://www.fhwa.dot.gov/bridge/prefab/ |
3 | S.L. Billington and J.K. Yoon, 'Cyclic Response of Unbonded Posttensioned Precast Columns with Ductile Fiber-Reinforced Concrete', Journal of Bridge Engineering, ASCE, July/August, 2004, pp. 353-363 |
4 | Yu-Chen On, Methee Chiewanichakorn, Il-Sang Ahn, Amjad J. Aref, Stuart S. Chen, Andre Filiatrault, George C. Lee, 'Cyclic Performance of Precast Concrete Segmental Bridge Columns', TRB Annual Meeting CD-ROM, 2006 |
5 | Minehiro Nishiyama, Fumio Watanabe, 'Seismic performance of Precast Column-Foundation Counection Assembled by Post-tensioning', ECI Conference on Advanced Materials for Construction of Bridges, Buildings and Other Structures III, The Berkeley Electronic Press, 2005. Article 5 |
6 | 김현호, 심창수, 정철헌, 김철환, 안동근, '조립식 교각의 프리 스트레스 설계' 한국콘크리트학회 학술발표회 논문집, 제18권 2호, 2006, pp. 225-228 |
7 | 도로교설계기준, 한국도로교통협회, 2005 |
8 | Eurocode 4, Design of composite steel and concrete structures Part 1.1 General rules and rules for buildings, ENV 1994-2, CEN, 1994 |
9 | ACI, Building code requirements for structural concrete (ACI 318-02 and commentary (ACI 318R-02), American Concrete Institute ACI, 2002 |
10 | E.F. Gad, A.M. Chandler, C.F. Duffield and G.L. Hutchinson, 'Earthquake ductility and overstrength in residential structures,' Structural Engineering and Mechanics, Vol. 8, No.4, 1999, pp. 361-382 DOI ScienceOn |
11 | Prestley, M.J.N., Seible, F. and Calvi, G.M., Seismic Design and Retrofit of Bridges, John & Sone, Inc., 1996 |
12 | 森 拓也, 'プレキャストセグメント橋脚の耐震性', コンクリー ト工學論文, Vol. 38, No.5, 2000, pp. 44-47 |