1 |
Construction and Economy Research Institute of Korea(2013), "2014 construction business view ".
|
2 |
Hong, S. C., and Baek, S. H. (2010). "A Study on Development of the Business Indicators in SMEs : focused on manufacturing", Korea Small Business Institute.
|
3 |
Kim, D. H. (2001). "Advanced Econometric Methodology of Constructing Composite Indexes for Measuring Business Cycle", The Korean Journal of Applied Economics, KAAE, 3(1), pp. 77-108.
|
4 |
Kim, K. S. (2003). "Statistical Properties of Business Survey Index", The Korean Journal of Applied Statistics, KSS, 23(2), pp. 263-274.
과학기술학회마을
DOI
|
5 |
Kim, M. C. (2010). "Building Construction Composite Index and Econometric Forecasting Model", Korea Research Institute for Human Settlements.
|
6 |
Kim, Hy. W., Chin, K. H., Lee, K. S., and Kim, M. R. (2012). "A Study on Development of Construction Engineering Business Survey Index", korean journal of construction engineering and management, KICEM, 13(6), pp. 54-62.
과학기술학회마을
DOI
|
7 |
Korea Institute for industrial Economics & Trad (2013). "Special KIET industry economy".
|
8 |
Lee, E. D., and Kim, H. S. (2011). "Analysis of Construction Management Business Survey Index". korean journal of construction engineering and management, KICEM, 12(3), pp. 83-90.
과학기술학회마을
DOI
ScienceOn
|
9 |
OECD (2008). "Handbook on Constructing Composite Indicators". Methodology and User Guide.
|
10 |
Sharon L. Lohr. (1999). "Sampling: Design and Analysis". Duxbury Press.
|
11 |
Kim, J. Y., and Kim, M. C. (2002). "A Study on the Business Cycle Composited Index in the Construction Market, Korea Research Institute for Human Settlements.
|