Browse > Article
http://dx.doi.org/10.7840/kics.2014.39C.8.615

I3A Framework of Defense Network Centric Based C2 Facilities  

Kim, Young-Dong (AJOU University Department of NCW Engineering)
Lee, Tae-Gong (AJOU University Department of NCW Engineering)
Park, Bum-Shik (AJOU University Department of NCW Engineering)
Abstract
Ministry of National Defense, MND, established a "Master Plan of Military Facility" in 2010 based on the defense reform to prepare for future war. It was a plan for consolidating small military facilities into battalion units, reflecting on and preparing for the needs of various changes in defense environment as well as balanced growth of ROK Army, Navy, and Air Force. However, to move forward with "Military Facility Master Plan," current design criteria for military facilities need to be revised to be enacted due to numerous calculation errors in facility footprints because of the absence of a sound facility criteria. Because the future war environment will be changed from Platform basis to Network Centric Warfare basis, Command & Control capability of C4I systems is getting more important. Therefore, Successful mission accomplishment can be secured by convergence of facility and military Information Technology(IT). So, MND should quickly prepare for the operational guidance, design criteria and policy that are suitable for Network Centric Warfare accomplishment, and implement infrastructure of IT and installation of C2 facility in conjunction with consolidation movement of military facilities. In this paper, we propose the defense I3A framework in order to solve this problem.
Keywords
I3A Framework; NCW; C2(Command & Control) Facility; Design Criteria & Guidance for Defense Information Infrastructure; Convergence;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Technical Implementation Group, "US army installation & campus area network design guide," USAISEC Technology Integration Center, pp. 3-10, Mar. 2010.
2 H. S. Chun, "A study on convergence service between construction and information technology," in Proc. KICS, vol. 2009, no. 6, pp. 422-425, Jun. 2009.
3 D. Ryu, J. I. Si, Y. H. Kim, and Y. R. Lee, "A study on framework according to IT Infra construction step-by-step for u-City Service revitalization," in Proc. KICS, vol. 2009, no. 6, pp. 814-816, Jun. 2009.
4 Headquarters Department of the Army, "Army regulation 500-3, U.S. army continuity of operations program policy and planning (COOP)," US Army COOP Policy Headquarter, pp. 45-87, Apr. 2008.
5 J. Lee and T. Lee, "Study on the capability driven EA framework enterprise transformation," J. Informatization Policy, vol. 15, no. 1, pp. 96-117, 2008.
6 Deputy of DoD, "DIACAP(DoD information assurance certification and accreditation process)," DoD Directive 8510.01 Deputy DoD, pp. 2-13, 2007.
7 J. G. Lee and T. G. Lee, "Introduction of defense information integration model based on EA for NCW," KIDA. Defense Policy Research, Winter, pp. 12-13, 2006.
8 J. A. Zachman, "The zachman framework for enterprise architecture," Zachman International, pp. 4-8, 2003.
9 Implementation Engineering Subject Matter Expert, "Technical Criteria for the Installation Information Infrastructure Architecture(I3A)," US Army Information System Engineering Command(USAISEC) Technology Integration Center, pp. 1-112, Oct. 2013.
10 MND(Ministry of National Defense), "Defense․ military facilities criteria of information communication installation," MND Defense.Military Facilities Criteria, pp. 1-123, Jul. 2013.
11 MND, "A study for an enact & revision of defense․military facilities criteria and work guidance," Defense․Military Facilities Criteria, pp. 7-12, 2012.
12 Department of the Army facilities Standardization Program, "Command & control facilities and others army headquarters, 3.9 communication and security system," US Army Corp of Engineers UFC 4-140-03 Standard Design, pp. 21-27, Jul. 2012.
13 USACE, "UFC 1-300-09N design procedure," US Army Corp of Engineers UFC, pp. 63-70, Feb. 2011.
14 Technical Implementation Group, "SIPRNET technical implementation criteria final_Ver6," USAISEC, Distribution C, pp. 45-87, Oct. 2010.
15 National Counterintelligence Executive, "Technical specification for construction management of sensitive compartmented information facilities," US DoD Deputy for Security, Version 1, pp. 72-76, May 2011.
16 H. K. Yang, H. J. Cha, and Y. G. Cho, "A study on the reform of a defence IT governance system," J. KICS, vol. 35, no. 5, pp. 777-784, May 2010.   과학기술학회마을
17 T. G. Lee, NCW theory and application, Hongrung publishing Company, pp. 519-549, 2007.