Surge Immunity Performance Enhancement Techniques on Battery Management System |
Kim, Young-Sung
(smart Grid Testing Department, Korea Electrotechnology Research Institute)
Rim, Seong-Jeong (Smart Grid Testing Department, Korea Electrotechnology Research Institute) Seo, Woohyun (Smart Grid Testing Department, Korea Electrotechnology Research Institute) Jung, Jeong-Il (Smart Grid Testing Department, Korea Electrotechnology Research Institute) |
1 | Electromagnetic compatibility (EMC) –Part 2-14:Environment – Over voltages on public electricity distribution networks, IEC 61000-2-14, 2006. |
2 | Electromagnetic compatibility (EMC) – Part 3-15: Limits – Assessment of low frequency electromagnetic immunity and emission requirements for dispersed generation systems in LV network, IEC 61000-3-15, 2009. |
3 | Low-voltage surge protective devices – Part 12: Surge protective devices connected to low-voltage power distribution systems – Selection and application principles, IEC 61643-12, 2008. |
4 | K. Matsumoto, K. Nishijima, T. Sato, T. Nabeshima, “A Two-Phase High Step Down Coupled-Inductor Converter for Next Generation Low Voltage CPU”, International Conference on Power Electronics-ECCE Asia, June 2011. |
5 | Ravishankar K. Iyer, David J. Rossetti, “A Measurement-Based Model for Workload Dependence of CPU Errors”, IEEE Transactions on Computers, Vol. c-35, No. 6, June 1986. |
6 | Low-voltage electrical installations –Part 4-44: Protection for safety – Protection against voltage disturbances and electromagnetic disturbances, IEC 60364-4-44, 2007. |
7 | Corrigendum 1 - Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test, IEC 61000-4-5, 2009. |
8 | Amendment 1 - Electromagnetic compatibility (EMC) - Part 4-18: Testing and measurement techniques - Damped oscillatory wave immunity test, IEC 61000-4-18, 2010. |
9 | Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test, IEC 61000-4-4, 2012. |