1 |
Mitsubishi Heavy Industries, Ltd., 2009, Design Control Document for The US-APWR
|
2 |
Ministry of Government Legislation, 2008, Regulation on Technical Standards for Nuclear Reactor Facilities, Etc., 6 of Article 24.
|
3 |
10CFR50.2, Definitions.
|
4 |
Mitsubishi Heavy Industries, Ltd., 2010, Qualification and Test Plan of Class 1E Gas Turbine Generator System, MUAP-07024-NP, Rev.2.
|
5 |
KHNP, 2002, Design Plan of AAC for Shin-Kori and Shin-Wolsong Nuclear Power Plant.
|
6 |
Mitsubishi Heavy Industries, Ltd., 2010, Initial Type Test Result of Class 1E Gas Turbine Generator System, MUAP-10023-NP, Rev.0.
|
7 |
EPRI, 1990, Advanced Light Water Reactor Utility Requirements Document, Vol. 2, Rev.1.
|
8 |
U.S. Nuclear Regulatory Commission, 2007, Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants, NUREG/CR-6928.
|
9 |
U.S. Nuclear Regulatory Commission, 2009, "RAI NO. 394, " Rev. 0.
|
10 |
Mitsubishi Heavy Industries, Ltd., 2009, Design Control Document for The US-APWR Chap. 19 Probabilistic Risk Assessment and Severe Accident Evaluation, MUAP-DC0019, Rev.2.
|
11 |
U.S. Nuclear Regulatory Commission, 1998, Guidelines on Modeling Common-Cause Failures Probabilistic Risk Assessment, NUREG/CR-5485, Rev.0.
|
12 |
U.S. Nuclear Regulatory Commission, 1988, Station Blackout, Regulatory Guide 1.155.
|
13 |
KHNP, 2002, Review to select AAC for Shin-Wolsong Nuclear Power Plant.
|
14 |
Mitsubishi Heavy Industries, Ltd., 2009, "New I&C Technologies for US-APWR," Mitsubishi Heavy Industries Technical Review Vol. 46, No.4.
|
15 |
10CFR50.63, Loss of all alternating current power.
|
16 |
EPRI, 1990, Advanced Light Water Reactor Utility Requirements Document, Vol. 10.
|