1 |
류한국, 김태희, 선형 공정계획 모델의 액티비티 관계의 경계조건 분석, 한국건설관리학회논문집, 12(1), 23-32, 2011
과학기술학회마을
DOI
ScienceOn
|
2 |
류한국, 장명훈, CPM공정표를 선형 공정표로 변환하기 위한 액티비티 생성 방법, 대한건축학회논문집 - 구조계, 27(10), 161-168, 2011
|
3 |
이재섭, 선형계획법을 이용한 건설공사 공기지연 분석방법, 대한건축학회논문집 - 구조계, 23(8), 213-220, 2007
과학기술학회마을
|
4 |
이재섭, 학습효과와 선형계획법을 이용한 건설공사 공기지연 분석방법, 대한건축학회논문집 - 구조계, 24(5), 185-192, 2008
과학기술학회마을
|
5 |
Ammar, M., Float analysis of non-serial repetitive activities, Journal of Construction Management and Economics, 21(5), 535-542, 2003
DOI
ScienceOn
|
6 |
Ammar, M. and Mohieldin, Y., CPM/RSM: CPM-Based repetitive scheduling method III, Middle East Regional Civil Engineering Conference, Egypt Section, ASCE, Reston, VA, 2002
|
7 |
Arditi, D. and Albulak, M., Line-of-balance in pavement construction, Journal of Construction Engineering and Management, 112(3), 411-424, 1986
DOI
ScienceOn
|
8 |
Duffy, G., Oberlender, G. and Jeong, D., Linear scheduling model with varying production rates, Journal of Construction Engineering and Management, 137(8), 574-582, 2011
DOI
ScienceOn
|
9 |
El-Rayes, K. and Moselhi, O., Resource-driven scheduling of repetitive projects, Construction Management and Economics, 16(4), 433-446, 1998
DOI
|
10 |
Fan, S. and Tserng, H., Object-oriented scheduling for repetitive projects with soft logics, Journal of Construction Engineering and Management, 132(1), 35-48, 2006
DOI
ScienceOn
|
11 |
Hegazy, T., Computer-based construction project management, Prentice Hall, Upper Saddle River, NJ, 2002
|
12 |
Hegazy, T. and Kamarah, E., Efficient repetitive scheduling for high-rise construction, Journal of Construction Engineering and Management, 134(4), 253-264, 2008
DOI
ScienceOn
|
13 |
Hegazy, T. and Wassef, N., Cost optimization in projects with repetitive nonserial activities, Journal of Construction Engineering and Management, 127(3), 183-191, 2001
DOI
ScienceOn
|
14 |
Jaafari, A., Criticism of CPM for project planning analysis, Journal of Construction Engineering and Management, 110(2), 222-233, 1984
DOI
ScienceOn
|
15 |
Lucko, G., Productivity scheduling method compared to linear and repetitive project scheduling methods, Journal of Construction Engineering and Management, 134(9), 711-720, 2008
DOI
ScienceOn
|
16 |
Lucko, G. and Orozco, A., Float types in linear schedule analysis with singularity functions, Journal of Construction Engineering and Management, 135(5), 368-377, 2009
DOI
|
17 |
Maravas, A. and Pantouvakis, J., A fuzzy repetitive scheduling method for projects with repeating activities, Journal of Construction Engineering and Management, 137(7), 561-564, 2011
DOI
ScienceOn
|
18 |
Mattila, K. and Abraham, D., Resource leveling of linear schedules using integer linear programming, Journal of Construction Engineering and Management, 124(3), 232-244, 1998
DOI
ScienceOn
|
19 |
Reda, R., RPM: Repetitive project modeling, Journal of Construction Engineering and Management, 116(2), 316-330, 1990
DOI
|
20 |
Russel, A. and Wong, W., New generation of planning structures, Journal of Construction Engineering and Management, 119(2), 196-214, 1993
DOI
ScienceOn
|
21 |
Selinger, S., Construction planning for linear projects, Journal of the Construction Division, 106(2), 195-205, 1980
|
22 |
Yang, T. and Ioannou, P., Scheduling system with focus on practical concerns in repetitive projects, Journal of Construction Engineering and Management, 22(6), 619-630, 2004
DOI
|
23 |
Strdal, O. and Cacha, J., Time space scheduling method, Journal of the Construction Division, 108(3), 445-457, 1982
|
24 |
Suhail, S. and Neale, R., CPM/LOB: New methodology to integrate CPM and line of balance, Journal of Construction Engineering and Management, 120(3), 667-684, 1994
DOI
ScienceOn
|