Automation of Rebar Quantity Estimation in the Detailed Design Stage Using BIM Model Properties - Focused on the Calculation of Column Reinforcement Quantity -

BIM모델 속성정보를 활용한 상세설계단계에서의 철근 수량산출 자동화 방안 - 기둥 철근 수량산출 중심으로 -

  • Lee, Ha-Neul ;
  • Yun, Seok-Heon
  • 이하늘 (경상국립대학교 건축공학과) ;
  • 윤석헌 (경상국립대학교 건축공학과)
  • Received : 2024.08.28
  • Accepted : 2024.08.29
  • Published : 2024.09.30

Abstract

This study aims to simplify the rebar quantity estimation process during the detailed design stage of buildings by addressing identified issues in the existing rebar quantity estimation process and establishing a BIM-based simplification method. To validate the applicability of the proposed method, it was applied to a case study of 'K' High School, with the results compared to rebar quantities from shop drawings to assess usability in real projects. It showed an error rate of 1.4% for SHD22S and 2.63% for HD10 among the types of rebar used in the case model. SHD22S, used as the main rebar in the columns, exhibited this error due to differences in the calculation method for splice and anchorage lengths. HD10, used as stirrup rebar in the columns, showed errors due to the omission of hook length considerations in the simplified estimation formula. Although these discrepancies resulted in cumulative errors of 10 to 20 meters, the error rates of 1.4% and 2.63% respectively fall within the generally accepted rebar overage rate of 5%, suggesting that this method is sufficiently accurate for quantity estimation during the detailed design stage. This study presents a method for efficiently estimating rebar quantities based on BIM during the detailed design stage. While traditional 2D quantity estimation and BIM-based methods often suffer from inefficiencies due to repetitive tasks and high modeling complexity, the proposed method assumes BIM models at LOD200, which are less complex and automate most of the structural information required for rebar quantity estimation, thereby reducing repetitive tasks. However, to further minimize errors, especially those related to hook and anchorage length calculations, additional research is needed to refine the estimation process and expand its applicability to the entire building's rebar quantity estimation.

Keywords

Acknowledgement

이 연구는 국토교통부/국토교통과학기술진흥원의 2024년도 지원으로 수행되었음(과제번호 : RS-2021-KA163269).

References

  1. Cha, Y. N., Kim, S. A., Chin, S. Y. (2014). Analysis of Quantity Take-Off Accuracy Using BIM-Based Spatial Objects, KIBIM Magazine, 4(4), pp. 13-23. 
  2. Eom, J. E., Lee, J. H., Kim, J. H., Choe, I. S. (2014). Introduction of BIM-bAsed Rebar Modeling Automation System, Journal of Computational Structural Engineering, 27(3), pp. 18-24. 
  3. Ergen, F., Bettemir, O. H. (2022). Development of BIM Software with Quantity Take-Off and Visualization Capabilities, Journal of Construction Engineering, Management & Innovation, 5(1), pp. 01-14. 
  4. Jang, J. W. (2013). Development of Rebar Arrangement System for Reinforced Concrete Foundation Using Lean Design Technique based on Structural BIM, Masters Thesis, Hanyang University Graduate School, pp. 45-46. 
  5. Joo, S. W., Kim, C. K., Kim, S. W., Noh, J. O. (2017). Establishment of BIM-Based Quantity and Cost Estimation Guidelines for Reinforced Concrete Frames, Journal of the Computational Structural Engineering Institute of Korea, 30(6), pp. 567-576. 
  6. Jung, J. H., Kim, C. K., Lee, J. C., Kim, J. H., Kim, M. S. (2012). Representation of Rebar Using IFC at Schematic Structural Design Stage, Journal of the Architectural Institute of Korea: Structure, 28(1), pp. 59-67. 
  7. Kim, S. A., Park, G., Song, B. S., Choi, C. H., Chin, S. Y. (2016). Study on the Creation of Work Environment for Improving Productivity of BIM Estimation Tasks, Journal of the Korea Institute of Construction Engineering and Management, 17(1), pp. 56-65. 
  8. Kim, S. H., Kim, S. G., Seo, S. W., Kim, S. C. (2023). Development of Automated Algorithm for Slab Rebar Quantity Calculation, Journal of the Korea Institute of Construction Engineering and Management, 24(5), pp. 52-62. 
  9. Kim, Y. J., Kim, S. A., Chin, S. Y. (2012). A study on Improving the Reliability of BIM-Based Estimation Modeling Data, Journal of the Korea Institute of Construction Engineering and Management, 13(3), pp. 43-55. 
  10. Kusumaningroem, T. T., Gondokusumo, O. (2023). Comparison of Building Information Modeling and Conventional Methods for Concrete and rebar Quantity Take-Off, International Journal of Application on Sciences, Technology and Engineering, 1(2), pp. 674-684. 
  11. Lee, J. C. (2019). Efficient Rebar Quantity Calculation in the Early Design Stage Using BIM models, Journal of the Architectural Institute of Korea: Structure, 35(5), pp. 145-152. 
  12. Porwal, A., Hewage, K. N. (2011). Building Information Modeling-Based Analysis to Minimize Waste Rate of Structural Reinforcement, Journal of Construction Engineering and Management, 138(8), pp. 943-954. 
  13. Seo, H. S. (2014). A Study on the Application of Rebar Quantity Calculation and Construction Detailing Using 3D Modeling Technique, Masters Thesis, Seoul National University of Science and Technology Graduate School of Industry, p. 62. 
  14. Seong, J. G. (2012). Design and Development of BIM Based Rebar Shop Drawing System for Column and Wall, Masters Thesis, Daejeon University, pp. 76-79. 
  15. Sherafat, B., Taghaddos, H., Shafaghat, E. (2022). Enhanced Automated Quantity Take-Off in Building Information Modeling, Scientia Iranica A: Civil Engineering, 29(3), pp. 1024-1037. 
  16. Song, C. H., Kim, C. K., Lee, S. E., Choi, H. C. (2016). Establishment of BIM-Based Rebar Quantity Calculation Process in the Early Design Stage, Journal of the Computational Structural Engineering Institute of Korea, 29(5), pp. 447-454. 
  17. Ugochukwu, S. C., Nwobu, E. A., Udechukwu-Ukohah, E. I., Odenigbo, O. G., Ekweozor, E. C. (2020). Regression Models for Predicting Quantities and Estimates of Steel Reinforcements in Concrete Beams of Frame Buildings, Journal of Scientific Research & Reports, 26(7), pp. 60-74. 
  18. Yun, J. D., Cho, H. S., Lee, J. H., Shin, J. Y., Kim, E. S. (2020). Comparison of Rebar Quantity Calculation in Reinforced Concrete Structures based on BIM, Journal of the Computational Structural Engineering Institute of Korea, 33(1), pp. 35-44.