Acknowledgement
This work was supported by the National Research Foundation of Korea (NRF) grant funded by the Korean Government (MSIT) (No. RS-2022-00144506)
References
- Korea Hydro & Nuclear Power. Nuclear Power Plant Status. KHNP; Gyeongju, Korea: updated Dec 2023; [cited Dec 2022], Available from: https://npp.khnp.co.kr/index.khnp?menuCd=DOM_000000102002001001.
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2013 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2014 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2015 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2016 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2017 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2018 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2019 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2020 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2021 ([in Korean]).
- Korea Hydro and Nuclear Power. Annual Report of Occupational Exposure in Nuclear Power Plants, KHNP, Gyeongju, Korea, 2022 ([in Korean]).
- Song C, Kong TY, Kim S, Son J, Kim H, Kim J, Park J, Kim HG, Kim Y. 2024. High-radiation-exposure work in Korean pressurized water reactors. Nuclear Engineering and Technology, under publication, https://doi.org/10.1016/j.net.2023.12.048.
- Korea Hydro and Nuclear Power. Development of Occupational Radiation Exposure Reduction Technology at Nuclear Power Plant, KHNP, Gyeongju, Korea, 2005.
- Korea Electric Power Corporation. Radiation Exposure Analysis Report, KEPCO KPS, Naju, Korea, 2022.
- Lee DH. 2017. Managerial Factors Influencing Dose Reduction of the Nozzle Dam Installation and Removal Tasks Inside a Steam Generator Water Chamber. J Ergon Soc Korea. 36(5):559-568. https://doi.org/10.5143/JESK.2017.36.5.559.
- Kim HG, Kong TY, Jeong WT, Kim ST. 2010. An Effects of Radiation Dose Assessment for Radiation Workers and the Member of Public from Main Radionuclides at Nuclear Power Plants. Journal of Radiation Protection. 35(1):12-20.
- Kim GH and Kong TY. 2010. Selection of the Most Appropriate Two-Dosemeter Algorithm for Estimating Effective Dose Equivalent during Maintenance Periods in Korean Nuclear Power Plants. Radiation Protection Dosimetry. 140(2):171-181. https://doi.org/10.1093/rpd/ncq073.
- Lee DH. 2018. Performance Evaluation of Experts Predicting the Delay Factors and the Delay Time of the Nozzle Dam Installation and Removal Tasks. J Ergon Soc Korea. 37(2):155-168. https://doi.org/10.5143/JESK.2018.37.2.155.
- Chae GS. 2004. Review on the Working Hours of the Radiation Work Plan for ECT through In-service Inspection. J Korea Asso Radiat Prot. 29(1):57-63.
- Oh HC, Na JH, Lee JS, Moon JH. 1999. Methodology to Reduce Occupational Dose in NPP Design. K. Korean Nuclear Society Conference.