With the increasing trend of extreme rainfall that exceeds the design frequency of man-made structures due to extreme weather, it is necessary to review the safety of agricultural reservoirs designed in the past. However, there are no local government-managed reservoirs (13,685) that can be discharged in an emergency, except for reservoirs over a certain size under the jurisdiction of the Korea Rural Affairs Corporation. In this case, it is important to quickly deploy a mobile siphon to the site for preliminary discharge, and this study evaluated the applicability of a mobile siphon with a diameter of 200 mm, a minimum water level difference of 6 m, 420 (m2/h), and 10,000 (m2/day), which can perform both preliminary and emergency discharge functions, to the Yugum Reservoir in Gyeongju City. The test bed, Yugum Reservoir, is a facility that was completed in 1945 and has been in use for about 78 years. According to the hydrological stability analysis, the lowest height of the current dam crest section is 27.15 (EL.m), which is 0.29m lower than the reviewed flood level of 27.44 (EL.m), indicating that there is a possibility of lunar flow through the embankment, and the headroom is insufficient by 1.72 m, so it was reviewed as not securing hydrological safety. The water level-volume curve was arbitrarily derived because it was difficult to clearly establish the water level-flow relationship curve of the reservoir since the water level-flow measurement was not carried out regularly, and based on the derived curve, the algorithm for operating small and medium-sized old reservoirs was developed to consider the pre-discharge time, the amount of spillway discharge, and to predict the reservoir lunar flow time according to the flood volume by frequency, thereby securing evacuation time in advance and reducing the risk of collapse. Based on one row of 200 mm diameter mobile siphons, the optimal pre-discharge time to secure evacuation time (about 1 hour) while maintaining 80% of the upper limit water level (about 30,000 m2) during a 30-year flood was analyzed to be 12 hours earlier. If the pre-discharge technology utilizing siphons for small and medium-sized old reservoirs and the algorithm for reservoir operation are implemented in advance in case of abnormal weather and the decision-making of managers is supported, it is possible to secure the safety of residents in the risk area of reservoir collapse, resolve the anxiety of residents through the establishment of a support system for evacuating residents, and reduce risk factors by providing risk avoidance measures in the event of a reservoir risk situation.
최근 이상기후로 수공 구조물의 설계빈도를 상회하는 극한호우의 증가 경향이 뚜렷함에 따라 과거에 설계된 농업용 저수지의 안전성 검토가 필요하다. 그러나 한국농어촌공사 관할 일정 규모 이상의 저수지를 제외한 지자체 관리 저수지는 비상시 긴급 방류가 가능 저수지는 전무하다(13,685개소). 이러한 경우 이동식 사이펀을 현장에 빠르게 투입하여 사전 방류하는 방법이 긴요하며, 본 연구에서는 사전 및 긴급방류 기능을 동시에 수행할 수 있는 직경 200 mm, 최소 수위차 6 m, 420(m2/h), 10,000(m2/day)의 이동식 사이펀을 경주시 유금저수지를 대상으로 적용 가능성을 평가하였다. 테스트베드인 유금 저수지는 1945년 준공되어 공용기간이 78년 정도 경과한 시설물로 수문학적 안정성 분석 결과 현재 댐마루 구간의 최저높이는 27.15(EL.m)로 검토 홍수위 27.44(EL.m) 보다 0.29 m 낮아 제방을 통한 월류 가능성이 있고 여유고도 1.72 m 부족한 것으로 나타나 수문학 안전성을 확보하지 못하는 것으로 검토되었다. 유금저수지는 수위-유량 계측이 주기적으로 이루어진지 얼마 되지 않아 저수지의 수위-유량 관계 곡선식을 명확하게 확립하기 어려워 수위-용적 곡선을 임의로 도출하였으며 도출된 곡선을 기반으로 중소규모 노후저수지 운영 알고리즘을 통해 사전방류시간, 여수로 방류량을 고려하고 빈도별 홍수량에 따른 저수지 월류시간을 예측함으로써 사전에 대피 시간을 확보하고 붕괴위험을 저감할 수 있는 기술을 확보하였다. 직경 200 mm 이동식사이펀 1열 기준, 30년 빈도 홍수량 유입 시 상한수위 기준 80% 수준(약 30,000 m2)을 유지하면서 주민대피 시간(약 1시간)을 확보할 수 있는 최적 사전방류시간은 12시간 이전으로 분석되었다. 중소규모 노후저수지를 대상으로 사이펀 활용 사전방류기술 및 저수지 운영 알고리즘에 따라 이상기후 대비 사전에 방류를 시행하고 관리자의 의사결정을 돕는다면, 저수지 붕괴 위험지역 내의 주민들의 안전을 확보하고 주민대피 지원체계 구축을 통해 주민들의 불안감 해소, 저수지 위험상황 시 위험회피 수단 제공으로 위험요소 감소가 충분히 가능하다.
이 논문은 행정안전부 기후변화대응 AI 기반 풍수해 위험도 예측기술개발사업의 지원을 받아 수행된 연구임(2022-MOIS61-005(RS-2022-ND634032)).
References
Babaeyan-Koopaei, K., Valentine, E.M., and Ervine, D.A. (2002). "Case study on hydraulic performance of Brent Reservoir siphon spillway." Journal of Hydraulic Engineering, Vol. 128, No. 6, pp. 562-567. https://doi.org/10.1061/(ASCE)0733-9429(2002)128:6(562)
Boatwright, J.D. (2014). Air-regulated siphon spillway: Performance, modeling, design, and construction. Master Thesis, Clemson University, Clemson, SC, U.S.
Choi, B.H., and Ryu, C.H. (2017). "Preparing the failure forecast for thereservoir (fill dam) for doubling the performance utilization of the reservoir disaster prevention measurement business." Journal of the Korea Water Resources Association, Vol. 50, No. 3, pp. 36-44.
French, M.J., and Widden, M.B. (2001). "The exploitation of low-head hydropower by pressure interchange with air, using siphons." Proceedings of the Institution of Mechanical Engineers, Part A: Journal of Power and Energy, Vol. 215, No. 2, pp. 223-230. https://doi.org/10.1243/0957650011538497
Houich, L., Ibrahim, G., and Achour, B. (2009). "Experimental comparative study of siphon spillway and over-flow spillway." Courrier du Savoir, Vol. 9, pp. 95-100.
James, W., and Young, B.C. (2001). "An approach to modeling realtime control of dynamic and static radial and sluice gates within EXTRAN." Journal of Water Management Modeling, Vol. 9, pp. 355-382. https://doi.org/10.14796/JWMM.R207-22
Kim, K.S., and Park, K.B. (2016). "Study on the hydrological safety of small old reservoirs." Advanced Science and Technology Letters, Vol. 140, pp. 83-86.
Ministry of Environment (ME) (2019). Standard guidelines for estimating flood volumes. No. 11-148000-001604-14, pp. 35-42.
Ministry of Land, Transport and Maritime Affairs (MLTM) (2011). Improvement and supplement of probability rainfall. No. 11-1611000-001995-01, pp. 43-51.
Park, D.S., and Oh, J.H. (2016). "Potential hazard classification of aged cored fill dams." The Journal of Engineering Geology, Vol. 26, No. 2, pp. 207-221. https://doi.org/10.9720/KSEG.2016.2.207
Park, K.B., Kim, K.S., Cha, S.H., and Ahn, S.S. (2016). "Assesment on flood control ability of small agricultural reservoir due to climate change." Proceeding of Korean Society of Hazard Mitigation Conference, p. 278.
Yoon, D.K. (2010). "Investigation of the methods for increasing flood control capacity of reservoir." Journal of Korean National Committee on Irrigation and Drainage, No. 45, pp. 37-42.
이메일무단수집거부
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.