Acknowledgement
이 연구는 2023년도 한국연구재단 연구비 지원에 의한 결과의 일부임. 과제번호:2021R1F1A105205013
References
- Ahn, H.K., Ham, N.H., Kim, J.H., & Kim, J.J. (2013). A study on improvement of implementation documents using DSM(Design Structure Matrix). Journal of the Architectural Institute of Korea Planning & Design, 29(3), 173-181.
- Choi, I.S., Jung. B.H., Kim, J.H., & Kim, J.H. (2021). Structural design, quantity calculation, construction ㄴdetail drawing and construction management of BIM-based construction projects, Korea Structural Engineers Association, 28(4), 8-15
- Choi, E.H., Lee, T.G., & Kim, S.H. (2021). A suggestion on BIM mechanical design process and level of modeling detail. Korea Journal of Air-Conditioning and Refrigeration Engineering, 33(9), 476-483. https://doi.org/10.6110/KJACR.2021.33.9.476
- Ham, N., Moon, S., Kim, J. H., & Kim, J. J. (2018). Economic analysis of design errors in BIM-based high-rise construction projects: case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6), 05018006.
- Han, J.H., Kim, K.T., & Ahn, Y.H. (2018). Major risk factors to implement CM at Risk pilot project on the public sector. Korean Journal of Construction Engineering and Management, 19(3), 61-69.
- Hietanen, J., & Final, S. (2006). IFC model view definition format. International Alliance for Interoperability, 1-29.
- Hong, S.H., Koo, B.S., Yu, Y.S., Ha, D.M., & Won, Y.K. (2022). Evaluation of practical requirements for automated detailed design module of interior finishes in architectural building information model. Korean Journal of Construction Engineering and Management, 23(5), 87-97. https://doi.org/10.6106/KJCEM.2022.23.5.087
- Jang, H.B., Lee, J.S., & Ahn, Y.H. (2019). Integrated project delivery in the pre-construction phase : case study of IPD for lean construction. Korean Journal of Construction Engineering and Management, 20(6), 11-22.
- Jeong, D. Y., & Kim, H.J. (2021). A study on the necessity of BIM drawing by recognition of limitations of 2D drawing- focus on the paradigm shift in the 4th industrial revolution era -. Journal of the Korean Institute of Culture Architecture, 75, 169-176.
- Jung, J.H., Kim, J.W., & Kim, S.A. (2015). A study on the knowledge-based design system using design history and service visualization in BIM based design process. Journal of Korea Facility Management Asoociation, 10(2), 15-22.
- Kim, B.J., Ju, H.W., Jang, M.S., Kim, B.J., & Chin, S.Y. (2016). An analysis on design error issues of BIM conversion design projects through case studies. Journal of KIBIM, 6(2), 47-57. https://doi.org/10.13161/kibim.2016.6.2.047
- Kim, B.J., Kim, Y.J., & Chin, S.Y. (2018). A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase. Journal of KIBIM, 8(1), 33-42. https://doi.org/10.13161/KIBIM.2018.8.1.033
- Kim, Y.J., Kim, I.C., & Chin, S.Y. (2020). Developing a drawing template for BIM software to improve BIM based drawing work efficiency in the construction document phase. Journal of KIBIM, 10(4), 98-109. https://doi.org/10.13161/KIBIM.2020.10.4.098
- Lee, D.G., Cha, H.S., Kim, K.R., & Shin, D.W. (2015). Development of BIM-based construction document information database structure through the link to the BIM model and construction document information. Korean Journal of Construction Engineering and Management, 16(5), 42-53. https://doi.org/10.6106/KJCEM.2015.16.5.042
- Lee, G., Park, H. K., & Won, J. (2012). D3 city project-economic impact of BIM-assisted design validation. Automation in Construction, 22, 577-586. https://doi.org/10.1016/j.autcon.2011.12.003
- Lee, J.C., Jung, J.H., & Oh, H.O. (2013) Work efficiency analysis of BIM based structural drawing, Journal of the Architectural Institute of Korea Structure & Construction, 29(6), 21-28.
- Lee, W.B., Kim, S.H., Yu, Y.S., & Koo, B.S. (2022). Development of graph based deep learning methods for enhancing the semantic integrity of spaces in BIM models. Korean Journal of Construction Engineering and Management, 23(3), 45-55.
- Messner, J., Anumba, C., Dubler, C., Goodman, S., Kasprzak, C., Kreider, R., Leicht, R., Saluja, C., Zikic, N. & Bhawani, S. (2021). Building Information Modeling (BIM) Project Execution Planning Guide.
- Park, M.S., Jo, J.Y., Lee, H.S., Kwon, S.K., & Ahn, S.J. (2012). BIM design management process using the dependency structure matrix at the introduction phase. Journal of the Architectural Institute of Korea, 28(01), 37-45.
- Park, Y.S., & Moon, J.S. (2014). A study on the BIM design collaboration in block residential projects focused on the combination method of unit plan models. Journal of the Architectural Institute of Korea, 30(2), 15-22.
- Park, B.S., & Kim, O.K. (2022). A study on the application of design VE process in pre-construction phase for GMP determination of CM at Risk project. Korean Journal of Construction Engineering and Management, 23(5), 56-64.
- Park, B.S., & Kim, O.K. (2021). Performance analysis of pre-construction phase of CM at Risk project in public sector. Korean Journal of Construction Engineering and Management, 22(2), 97-105.
- Park, J.J., Kim, E.Y., Lim, S.Y., & Jun, H.J. (2022). Development of a customized BIM-based architectural design service platform for architectural design practitioners. Journal of the Architectural Institute of Korea, 38(1), 59-66.
- Park, S.M., Choo, S.Y., Ryu, J.L., & Woo, S.H. (2016). A proposal for required drawing information standard and Its effectiveness for writing BIM-based construction consent documents. Journal of the Regional Association of Architectural Institute of Korea, 18(2), 19-27.
- Park, S.J., Ha, J.W., Kim, J.G., Sim, J.H., Ahn, Y.H., & Lee, J.S. (2019). Introducing Korea's first industrial plant IPD process innovation case - POSCO Chemical Sejong Anode Materials Plant project. Korean Journal of Construction Engineering and Management, 20(5), 43-51.
- Shen, W., Hao, Q., Mak, H., Neelamkavil, J., Xie, H., Dickinson, J., Thomas, R., Pardasani, A. & Xue, H. (2010). Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review. Advanced engineering informatics, 24(2), 196-207.
- Song, J.K., & Ju, K.B. (2013). Development of rule for quality checking items to raise completeness of BIM model -focusing on the domestic BIM guidelines-. Korean Journal of Construction Engineering and Management, 14(5), 131-143. https://doi.org/10.6106/KJCEM.2013.14.5.131
- Sung, W.J., & Jeong, Y.H. (2020). Automation in site planning of apartment complex - through Rhino Grasshopper's parametric modeling and optimization-. Journal of KIBIM, 10(3), 22-32. https://doi.org/10.13161/KIBIM.2020.10.3.022