Acknowledgement
This work was supported by Kyonggi University Research Grant 2022.
References
- Chen B, Jiang S, Qi L, Su Y, Mao Y, Wang M, Cha HS. Design and implementation of quantity calculation method based on BIM data. Sustainability. 2022 Jun;14(13):7797. https://doi.org/10.3390/su14137797
- Khosakitchalert C, Yabuki N, Fukuda T. Improving the accuracy of BIM-based quantity takeoff for compound elements. Automation in Construction. 2019 Oct;106:102891. https://doi.org/10.1016/j.autcon.2019.102891
- Oh SW, Sung BJ, Kim YS, Kim JR. The development of an 3D CAD building element information: focused on the apartment housing. Journal of the Architectural Institute of Korea Structure & Construction. 2001 Jun;17(6):103-12.
- Monteiro A, Martins JP. A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Automation in Construction. 2013 Nov;35:238-53. https://doi.org/10.1016/j.autcon.2013.05.005
- Lee DG, Lee HC, Park JY. A study on the estimation accuracy through BIM-based detailed cost estimation. Journal of the Korean Housing Association. 2019 Oct;30(5):1-8. https://doi.org/10.6107/JKHA.2019.30.5.001
- Kim TH, Hong CG, Kim SK. Algorithm for the reinforced concrete framework material take-off. Korean Journal of Construction Engineering and Management. 2003 Jan;4(1):114-21.
- Yun S, Kim S. Basic research on BIM-based quantity take-off guidelines. Architectural Research. 2013 Jun;15(2):103-9. https://doi.org/10.5659/AIKAR.2013.15.2.103
- Kim S, Chin S, Kwon S. A discrepancy analysis of BIM-based quantuty take-off for building interior components. Journal of Management in Engineering. 2019 Jan;35(3)0000684. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000684
- Kim MH, Jo CW, Yun SH. Improvement of bill of quantities of door and window work for BIM-based cost estimation. Journal of KIBIM. 2020 Jun;10(2):12-20. https://doi.org/10.13161/kibim.2020.10.2.012
- Jun KH, Yun SH. The case study of BIM-based quantity take-off for concrete and formwork. Journal of KIBIM. 2011 Mar;1(1):13-7. https://doi.org/10.13161/kibim.2011.1.1.013
- Yoon JD, Cho HS, Lee JH, Shin JY, Kim ES. A comparison of quantity take-offs of RC structures based on BIM. Journal of the Computational Structural Engineering Institute of Korea. 2020 Feb;33(1):35-44. https://doi.org/10.7734/COSEIK.2020.33.1.35
- Park YJ, Won SK, Han CH, Lee JB. A study on 3D BIM collaborative approximate estimating model of structural work for apartment projects. Journal of the Architectural Institute of Korea Structure & Construction. 2011 Jun;27(6):123-30.
- Ahn JH, Lim NG. A study on the application of BIM for reinforcement concrete structural work. Journal of the Korea Institute for Structural Maintenance and Inspection. 2018 Jan;22(1):158-66. https://doi.org/10.11112/jksmi.2018.22.1.158
- Cha YN, Kim SA, Chin SY. An accuracy analysis on quantity take-off using BIM-based spatial object. Journal of KIBIM. 2014 Dec;4(4):13-23. https://doi.org/10.13161/kibim.2014.4.4.013
- Lee JC. A study on the effective calculation of rebar QTO in the early design phase through the application of BIM model. Journal of the Architectural Institute of Korea Structure & Construction. 2019 May;35(5):145-52. https://doi.org/10.5659/JAIK_SC.2019.35.5.145
- Taghaddos H, Mashayekhi A, Sherafat B. Automation of construction quantity take-off: using building information modeling (BIM). The proceedings of 2016 construction research congress. 2016 May 31-Jun 2; San Juan, Puerto Rico. Reston (VA): American Society of Civil Engineers; 2016. p. 2219-27. https://doi.org/10.1061/9780784479827.221
- Sabol L. Challenges in cost estimating with building information modeling. WA: Design + Construction StrategiesI; 2008. 16 p.
- Zima K. Impact of information included in the BIM on preparation of bill of quantities. Procedia Engineering, 2017 Dec;208:203-10. https://doi.org/10.1016/j.proeng.2017.11.039
- Sattineni A, Bradford RH. Estimating with BIM: a survey of us construction companies. 2011 Proceedings of the 28th ISARC; 2011 Jun 29-Jul 1; Seoul, Korea. Seoul (Korea): The International Association for Automation and Robotics in Construction; 2011. p. 564-9. https://doi.org/10.22260/ISARC2011/0103
- Joo SU, Kim CK, Kim SU, Noh JO. BIM-based quantity takeoff and cost estimation guidwlines for reinforced concrete structures. Journal of the Computational Structural Engineering Institute of Korea. 2017 Dec;30(6):567-76. https://doi.org/10.7734/COSEIK.2017.30.6.567