Acknowledgement
본 연구는 국토교통부 "2023년 터널관리시스템 운영"의 일환으로 작성되었습니다.
References
- An, J.W., Kim, H.K. (2016), "Developments of performance-based assessment technique for existing tunnels", Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 6, pp. 525-533. https://doi.org/10.9711/KTAJ.2016.18.6.525
- Bae, G.J., Lee, S.W., Cho, M.S., Lee, K.H. (2001), "Study on investigation and analysis about damage of tunnels", Journal of Korean Tunnelling and Underground Space Association, Vol. 3, No. 3, pp. 31-43.
- Chen, Y., Gao, Y., Shi, S., Xu, F., Zhao, W. (2022), "Characteristics of transient pressure in lining cracks induced by high-speed trains", Journal of Wind Engineering and Industrial Aerodynamics, Vol. 228, pp. 1-11.
- Korea Expressway Corporation (2012), A study on the minimization of longitudinal cracks of tunnel lining concrete in the roof, pp. 1-5.
- Traffic Monitoring System Home page, https://www.road.re.kr (July 20, 2023).