DOI QR코드

DOI QR Code

Development of an Algorithm for the Automatic Quantity Estimation of Wall Rebar

  • Kim, Do-Yeong (Global R & PD Center Construction Project, SK bioscience) ;
  • Suh, Sangwook (Dept. Of architectural engineering Gachon university) ;
  • Kim, Sunkuk (Department of Architectural Engineering, Kyung-hee University) ;
  • Lwun Poe Khant (Department of Architectural Engineering, Kyung-hee University)
  • Received : 2023.06.18
  • Accepted : 2023.09.19
  • Published : 2023.09.30

Abstract

In order to devise a rebar usage optimization algorithm, it is necessary to calculate the exact rebar length and revise the arrangement of rebars into special lengths. However, the process of rearranging numerous rebars and manually calculating their quantities is time-consuming and requires significant human resources. To address this challenge, it is necessary to develop an algorithm that can automatically estimate the length of rebars and calculate their quantities. This study aims to create an automatic estimation algorithm that improves work efficiency while ensuring accurate and reliable calculations of rebar quantities. The algorithm considers various factors such as concrete cover, hook length, development length, and lapping length, mandated by the building codes, to calculate the quantity of rebars for wall structures. The effectiveness of the proposed method is validated by comparing the rebar quantities generated by the algorithm with manually calculated quantities, resulting in a difference rate of 1.14% for the hook case and 1.37% for the U-bar case. The implementation of this method enables fast and precise estimation of rebar quantities, adhering to relevant regulatory codes.

Keywords

Acknowledgement

This work was supported by the National Research Foundation of Korea (NRF) grants funded by the Korean government (MOE) (No. 2022R1A2C2005276).

References

  1. Almeida, J.P., Prodan, O., Tarquini, D., and Beyer, K. (2017). "Influence of lap splices on the deformation capacity of RC walls. I: Database assembly, recent experimental data, and findings for model development". Journal of Structural Engineering, 143(12). 
  2. ACI Committee 318 (2019). Building Code Requirements for Structural Concrete (ACI 318-19); and Commentary (ACI 318R-19), Farmington Hills, MI: American Concrete Institute. 
  3. Ali, K.N., Alhajlah, H.H., and Kassem, M.A. (2022). "Collaboration and Risk in Building Information Modeling (BIM): A Systematic Literature Review." Buildings, 12, p. 571. 
  4. British Standards Institution (1997). Structural Use of Concrete-Part 1: Code of Practice for Design and Construction, BS 8110:1997, London: British Standards Institution. 
  5. British Standards Institution (2020). BS 8666:2020, Scheduling, dimensioning, cutting and bending of steel reinforcement for concrete- Specification: British Standards Institution, UK. 
  6. Chen, Y., and Yang, T. (2015). "Lapping Pattern, Stock Length, and Shop Drawing of Beam Reinforcements of an RC Building." Journal of Computing in Civil Engineering, 29(1), 04014028. 
  7. Darwin, D., Dolan, C.W., and Nilson, A.H. (2016). "Design of Concrete Structures, 15th edition." MaGraw-Hill Education. 
  8. Hong, S., Koo, B., Yu, Y., Ha, D., and Won, Y. (2022). "Evaluation of Practical Requirements for Automated Detailed Design Module of Interior Finishes in Architectural Building Information Model." Construction Engineering and Management, 23(5), pp. 87-97. 
  9. Khosakitchalert, C., Yabuki, N., and Fukuda, T. (2020). "Automated modification of compound elements for accurate BIM-based quantity takeoff." Automation in Construction, 113, 103142. 
  10. Khondoker, Md. T.H. (2021). "Automated reinforcement trim waste optimization in RC frame structures using building information modeling and mixed integer linear programming." Automation in Construction 124. 
  11. Kim, S.K., and Kim, M.H. (1991). "A Study on the development of the optimization algorithm to minimize the loss of reinforcement bars." Journal of Architectural Institution Korea, 7, pp. 385-390. 
  12. Kim, S.K., Hong, W.K., and Joo, J.K. (2004). "Algorithms for reducing the waste rate of reinforcement bars." Journal of Asian Architectural and Building Engineering, 3, pp. 17-23.  https://doi.org/10.3130/jaabe.3.17
  13. Kim, D., Lim, C., Liu, Y., and Kim, S. (2020). "Automatic Estimation System of Building Frames with Integrated Structural Design Information (AutoES)." Iranian Journal of Science and Technology, Transactions of Civil Engineering, 44, pp. 1145-1157.  https://doi.org/10.1007/s40996-019-00308-5
  14. Kwon, K., Kim, D., and Kim, S. (2021). "Cutting Waste Minimization of Rebar for Sustainable Structural Work: A Systematic Literature Review." Sustainability, 13, 5929. 
  15. Kwon, K. (2023). "A Study on the Development of Optimization Algorithms for Near Zero Rebar Cutting Waste Rate (N0RCW), Doctoral Dissertation, Kyung Hee University. 
  16. Lee, I.J., Yu, H., and Chan, S.L.(2016). "Carbon Footprint of Steel-Composite and Reinforced Concrete Buildings." Standing Committee on Concrete Technology Annual Concrete Seminar, Hong Kong, Construction Industry Council. https://www.devb.gov.hk/filemanager/en/content_971/7_Carbon_Footprint_for_Steel_Composite_and_Reinforced_Concrete_Buildings.pdf(April 6, 2023). 
  17. Lee, D., Son, S., Kim, D., and Kim, S.K. (2020). "Special-Length-Priority Algorithm to Minimize Reinforcing Bar-Cutting Waste for Sustainable Construction." Sustainability, 12, 5950. 
  18. Lee, W., Kim, S., Yu, Y., and Koo, B. (2022). "Development of Graph-based Deep Learning methods for Enhancing the Semantic Integrity of Spaces in BIM Models." Construction Engineering and Management, 23(3), pp. 45-55. 
  19. Lim, J., Oh, J. and Kim, S. (2023). "Near-Zero Rebar Cutting Waste Management by Adjusting Lap Splice Position." Presentation Proceedings of the 8th World Congress on Civil, Structural, and Environmental Engineering (CSEE' 23) Lisbon, Portugal-March 29-31, Paper No. ICSECT 115. 
  20. Liu, J., Li, S., Xu., C., Wu, Z., Ao, N., and Chen, Y.F. (2021). "Automatic and optimal rebar layout in reinforced concrete structure by decomposed optimization algorithms." Automation in Construction, 126, 103655. 
  21. Mangal, M., Li, M., Gan, V.J.L., and Cheng, J.C.P. (2021). "Automated clash-free optimization of steel reinforcement in RC frame structures using building information modeling and two-stage genetic algorithm." Automation in Construction, 126, 103676. 
  22. Monteiro, A., and Martins, J.P. (2013). "A survey on modeling guidelines for quantity takeoff oriented BIM-based design." Automation in Construction 35, pp. 238-253.  https://doi.org/10.1016/j.autcon.2013.05.005
  23. Nadoushani, Z.S., Hammad, A.W.A., and Akbarnezhad, A. (2016). "A Framework for Optimizing Lap Splice Positions within Concrete Elements to Minimize Cutting Waste of Steel Bars." 33rd International Symposium on Automation and Robotics in Construction (ISARC). 
  24. Nadoushani Z.S.M., Hannad, A.W., Xiao, J., and Akbarnezhad, A. (2018). "Minimizing cutting wastes of reinforcing steel bars through optimizing lap splicing within reinforced concrete elements." Construction and Building Materials, 185, pp. 600-608.  https://doi.org/10.1016/j.conbuildmat.2018.07.023
  25. Nanagiri, Y., and Singh, R. (2015). "Reduction of Wastage of Rebar by using BIM and Linear Programming." International Journal of Technology, 5(2), pp. 329-334.  https://doi.org/10.5958/2231-3915.2015.00043.7
  26. Porwal, A., and Hewage, K. N. (2012). "Building information modeling-based analysis to minimize waste rate of structural reinforcement." Journal of Construction Engineering and Management, 138(8), pp. 943-954. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000508
  27. RICS NRM: New Rules of Measurement. http://www.rics.org/profession-standards/rics-standards-andguidance/sector-standards/construction-standards/nrm (May 22, 2023) 
  28. Tang, S., Liu, H., Almatared, M., Abudayyeh, O., Lei, Z., and Fong, A. (2022). "Towards Automated Construction Quantity Take-Off: An Integrated Approach to Information Extraction from Work Descriptions." Buildings, 12(3), p. 354. 
  29. Won, J., Cheng, J.C.P., and Lee, G. (2016). "Quantification of construction waste prevented by BIM-based design validation: case studies in South Korea." Waste Management, 49, pp. 170-180.  https://doi.org/10.1016/j.wasman.2015.12.026