DOI QR코드

DOI QR Code

Integrating a Machine Learning-based Space Classification Model with an Automated Interior Finishing System in BIM Models

  • Ha, Daemok (Department of Civil Engineering, Seoul National University of Science and Technology) ;
  • Yu, Youngsu (Department of Civil Engineering, Seoul National University of Science and Technology) ;
  • Choi, Jiwon (Department of Civil Engineering, Seoul National University of Science and Technology) ;
  • Kim, Sihyun (Department of Civil Engineering, Seoul National University of Science and Technology) ;
  • Koo, Bonsang (Department of Civil Engineering, Seoul National University of Science and Technology)
  • Received : 2023.01.17
  • Accepted : 2023.05.25
  • Published : 2023.07.31

Abstract

The need for adopting automation technologies to improve inefficiencies in interior finishing modeling work is increasing during the Building Information Modeling (BIM) design stage. As a result, the use of visual programming languages (VPL) for practical applications is growing. However, undefined or incorrect space designations in BIM models can hinder the development of automated finishing modeling processes, resulting in erroneous corrections and rework. To address this challenge, this study first developed a rule-based automated interior finishing detailing module for floors, walls, and ceilings. In addition, an automated space integrity checking module with 86.69% ACC using the Multi-Layer Perceptron (MLP) model was developed. These modules were integrated into a design automation module for interior finishing, which was then verified for practical utility. The results showed that the automation module reduced the time required for modeling and integrity checking by 97.6% compared to manual work, confirming its utility in assisting BIM model development for interior finishing works.

Keywords

Acknowledgement

This work is supported in 2023 by the Korea Agency for Infrastructure Technology Advancement (KAIA) grant funded by the Ministry of Land, Infrastructure and Transport (Grant RS-2021-KA163269).

References

  1. Bloch, T., and Sacks, R. (2018). "Comparing machine learning and rule-based inferencing for semantic enrichment of BIM models." Automation in Construction, 91, pp. 256-272. https://doi.org/10.1016/j.autcon.2018.03.018
  2. Ha, D.M., Yu, Y.S., and Koo, B.S. (2022). "A Study on the Establishment of Rule-Based Modules for Automating the Design of Interior Finishes in Architectural Buildings." Journal of KIBIM, 12(1), pp. 42-54. https://doi.org/10.13161/KIBIM.2022.12.1.042
  3. Hong, S.H., Koo, B.S., Yu, Y.S., Ha, D.M., and Won, Y.K. (2022). "Evaluation of Practical Requirements for Automated Detailed Design Module of Interior Finishes in Architectural Building Information Model." Korean Journal of Construction Engineering and Management, 23(5), pp. 87-97.
  4. Im, M.S. (2021). "Digital Innovation Strategies and Future Prospects in the Construction Industry." Construction Engineering and Management, 22(1), pp. 13-18.
  5. Jeon, S.M., and Kim, D.W. (2013). "BIM parametric modeling." Technical Report, Ssangyong Engineering and construction, Korea, pp. 20-24.
  6. Jeong, S.J., Ham, N.H., Kim, J.H., and Kim, J.J. (2012). "A Study on the Application of BIM for Design Efficiency in the Early Design Stage." Proceeding of Annual Conference of the Architectural Institute of Korea , 32(1), pp. 61-62.
  7. Khosakitchalert, C., Yabuki, N., and Fukuda, T. (2020). "Automated modification of compound elements for accurate BIM-based quantity takeoff." Automation in Construction, 113, pp. 103-142. https://doi.org/10.1016/j.autcon.2020.103142
  8. Kim, H.J., Kim, E.Y., and Jun, H.J. (2020). "Automation of BIM Design Work in Open BIM Platform." Proceeding of Annual Conference of the Architectural Institute of Korea, 40(2), pp. 175-178.
  9. Kim, H.Y., and Lee, J.K. (2016). "A Study on the Application of BIM-enabled Interior Panel Design by the control of Parametric Objects and their Properties." Journal of the Korean Institute of Interior Design, 25(6), pp. 70-78.
  10. Kim, I.H., Yang, J.I., Cho, G.H., and Choi, J.S. (2012). "A study on the BIM-based Automation of Envelope Form Generation at the Schematic Design Phase of Supertall Buildings." Journal of the Architectural Institute of Korea Planning & Design, 28(11), 11-18.
  11. Kim, J.H., Jang, P.G., and Jeon, B.H. (2012). "A Parametric Modeling Methodology Optimized for Korean Traditional House." Journal of the Architectural Institute of Korea Planning & Design, 28(2), pp. 105-112.
  12. Kim, S.A. (2017). "Parametric Design and Its Implication in Design Practice." Korean architects 2017, 7, pp. 146-155.
  13. Kim, S.A., Yoon, S.W., Chin, S.Y., and Kim, T.Y. (2009). "A Development of Automated Modeling System for Apartment Interior to Improve Productivity of BIM-base Quantity Take-Off." F1-score Journal of the Architectural Institute of Korea, 25(9), pp.133-143.
  14. Koh, I.L., Kim, M.K., Min, Y.G., and Chung, T.S. (2012). "A Study on the 'Level of Information' in BIM-based Design Process." Journal of The Korean Digital Architecture.Interior Association, 12(3), pp. 111-117.
  15. Kolarevic, B. (2015). "Architecture in the Digital Age : Design and Manufacturing." Taylor & Francis , New York, p. 17.
  16. Lee, M.K., and Chin, S.Y. (2013). "A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior." Korean journal of construction engineering and management, 14(1), pp. 12-22. https://doi.org/10.6106/KJCEM.2013.14.1.012
  17. Lee, W.B., Kim, S.H., Yu, Y.S., and Koo, B.S. (2022). "Development of Graph based Deep Learning methods for Enhancing the Semantic Integrity of Spaces in BIM Models." Korean Journal of Construction Engineering and Management, 23(3), pp. 45-55.
  18. Mcneel, (2017). "Rhino entity."  (Jan, 13, 2023)
  19. Park, S.H., Kim, H.S., and Yoon, D.Y., (2015). "A study for automated division of composite walls for quantity take-off in construction document phase." Korean Journal of Computational Design and Engineering , 20(2), 124-132. https://doi.org/10.7315/CADCAM.2015.124
  20. Park, S.K., and Lee, J.K. (2015). "A Study on the Technological Connections between BIM (Building Information Modeling) and Interior Architecture Design-Focusing on the Applications of Spatial Object and its Properties." Journal of Korea Design, 34. pp. 35-44. https://doi.org/10.17246/jkdk.2015..34.004
  21. Song, J.Y., Kim, J.J., and Lee, J.K. (2019). "Spatial information enrichment using NLP-based classification of space objects for school bldgs. in Korea." ISARC, Proceedings of the International Symposium on Automation and Robotics in Construction, IAARC Publications, 36, pp. 415-420.
  22. Woo, S.H., Kim, S.B., and Choo, S.Y. (2014). "A Study on the Otimazation of Architectural Skin Panel using Visual Programming Language." Journal of the Architectural Institute of Korea Planning & Design, 30(12), pp. 13-20.
  23. Yoon, M.C. (2013). "A BIM-Based Architectural Model Takes Advantage of the Estimate Model Process". Journal of the Architectural Institute of Korea Planning & Design, Architectural Institute of Korea, 29(9), pp. 95-102.