DOI QR코드

DOI QR Code

An Analysis on the Current State of Design Value Engineering and Improvement Methods

설계VE 연구 실태분석 및 개선방안 연구

  • Park, Sun-Hee (Department of Architectural Design, Seoul National University of Science and Technology) ;
  • Kim, Won-Pil (Department of Architectural Design, Seoul National University of Science and Technology)
  • 박선희 (서울과학기술대학교 일반대학원 건축학) ;
  • 김원필 (서울과학기술대학교 건축학과)
  • Received : 2023.05.06
  • Accepted : 2023.06.30
  • Published : 2023.07.28

Abstract

VE(Value Engineering) is a systematic process in which members of team, an expert group, reviews the feasibility of design and field application by function and alternatives through cooperation in various fields of expertise. This study is aimed at analyzing how far the current design VE has developed theoretically and practically. Accordingly, the current status was analyzed based on the application of the design, construction VE document research methodology and researcher's activities of design VE reviewed work from 2015 to the present. Based on the design VE common elements, the entire process was divided into 6 components: process, utilization plan, task performance stage, application case, technique use, and others. The study found that the absence of considerate awareness of design VE members, data management and systematization were required for review, implementation of design VE review tasks, overall management operation with guaranteed expertise from step-by-step tasks to follow-up management. Construction projects suggested such improvement measures as the expansion of design VE review, implementation period, payment of fees, and supplementation of compulsory approval of proposals in building construction stage. This will be used as a guideline for improving the process of activating design VE and work performance manual.

Keywords

Acknowledgement

이 연구는 서울과학기술대학교 교내 연구비 지원으로 수행 되었습니다.

References

  1. Aboelmagd, Y. M., & Mobarak, W. F. (2021). Types of works in construction projects in terms of effectiveness when applying Value Engineering in Saudi Arabia, Journal of Engineering Sciences, 6(49), 704-733.
  2. Byong, B. S. (2011). Building construction cost savings through the improvement of various design VE work-focused on Busan cases, Korea Institute of Construction Engineering and Management, 2(2), 68-70.
  3. Cho, H. M., Hyun, C. T., Hong, T. H., Sim, J. G., & Moon, H. S. (2010). Development of VE suggestion form for post - management of multi - family housing VE proposals, Architectural Institute of Korea, 26(6), 111-119.
  4. Enforcement Decree of the Construction Technology Promotion Act, Ministry of Government Legislation 75 (2022). https://www.law.go.kr/
  5. Firmanda, Y. A., Oetomo, W., & Wulandari, E. (2022). Value engineering for drainage system planning on Soekarno Hatta road malang city, Journal of Community Service, 14(3), 2707-2725.
  6. Ha, S. R., Hyun, C. T., SON, M, J., & Kim, Y. S. (2011). Development of pre - workshop phase for the VE application at the early planning stage of the mega project, Korea Institute of Construction Engineering and Management, 12(4), 29-39. https://doi.org/10.6106/KJCEM.2011.12.4.29
  7. Ha, Y. K. (2013). The study regarding recent design VE bidding system and improvement for bidding Process in Korea, Master's Thesis, Korea University, 2013(2), 72-90.
  8. Heo, W. Y., & Yoon, J. O. (2013). The design through mechanical engineering / Fire protection VE case study, Architectural Institute of Korea, 29(2), 219-226.
  9. Hyun, J. H., Byong, B. S., Choi, E. G., Ha, C. D., & Moon, S. W. (2012). A case study on valu improvement through applying VE method in urban railway design, Journal of the Korean Society for Railway, 2012(5), 7-12.
  10. Ikhbayar, K. L., Jin, C. Q., Hyun, C. T., & Lee, S. H. (2022). A review method of the applicability for VE alternatives using building information modeling based virtual reality, Korean Journal of Computational Design and Engineering, 27(2), 189-203. https://doi.org/10.7315/CDE.2022.189
  11. In, H. J. (2012). A study on Kano-Quality model for user and owner's need analysis of design Value Engineering, Master's Thesis, Namseoul University, 45-48.
  12. Jeong, S. E. (2012). A process model for design Value Engineering(VE) using the chimera idea creation concept (CICC), Master's Thesis, Namseoul University, 2012(6), 65-869.
  13. Jeong, S. J. (2013). A study on the inventive thinking from the idea creation process of design VE by futures wheel (FWID), Master's Thesis, Namseoul University, 2012(12), 40-59.
  14. Jung, G. S. (2021a). A study on the VE process for optimizing the selection of slope stability construction method based on quality model, Master's Thesis, Pusan National University, 44-49.
  15. Jung, H. C., Kim, J. H., Han, S. W., & Hyun, C. T. (2013). A function analysis for application of VE in the planning phase of a construction project, Architectural Institute of Korea, 33(1), 581-582.
  16. Jung, J. W. (2021b). Comparing idea creation in VE systems, Korean Institute of Information Scientists And Engineers, 2018(6), 33-35.
  17. Kang, M. S., Yang, J. K., Huh, Y. K., & Kim, D. Y. (2019). Extraction and analysis for weight based core alternative evaluation factors of design VE quality model in the educational facility, Journal of the Architectural Institute of Korea, 37(12), 203-209.
  18. Kim, H. B. (2018). Development of brainstorming & business creativity codes method for VE idea generation, Master's Thesis, University of Seoul, 2018(8), 51-74.
  19. Kim, H. Q. (2017). Using business creativity codes (BCC) as an efficiency improvement method in the design phage VE of construction project, Doctoral Thesis, Sungkyunkwan University, 2016(10), 103-118.
  20. Kim, J. S., & Lim, H. C. (2015). Improvement method on ordering system of design phase VE, Architectural Institute of Korea, 17(3), 153-160.
  21. Kim, K. U., Oh, J. H., Lim, J. H., & Huh, Y. K. (2014). VE application to small and medium size private project, Architectural Institute of Korea, 30(6), 99-104.
  22. Kim, M. J., Kwon, S. H., & Lee, K. H. (2012). The development of an eco-value efficiency evaluation model according to the railway alignment change based on VE, Journal of the Korean Society for Railway, 2012(10), 1437-1442.
  23. Kim, S. T. (2014). Idea generation in Value Engineering using TRIZ contradiction, Master's Thesis, Pusan National University, 2014(8), 31-40.
  24. Kim, S. Y., & Yang, J. K. (2012). Process development and verification for construction VE object selection of performance-oriented, Korea Institute of Construction Engineering and Management, 13(4), 25-32.
  25. Kim, Y. H., & Kim, Y. S. (2010a). Problem analysis and improvement scheme based on questionnaire survey to design VE status for apartment buildings, Korea Institute of Construction Engineering and Management, 11(4), 51-58. https://doi.org/10.6106/KJCEM.2010.11.4.51
  26. Kim, Y. H., Han, J. G., & Chin, K. H. (2018). Direction of construction of VE system in bidding stage (centering on modular plant construction), Korean Society of Civil Engineers, 2018(10), 31-32.
  27. Kim, Y. S., & Kang, C. H. (2015). A study on the improvement direction for VE application to construction work, Architectural Institute of Korea, 35(2), 531-532.
  28. Kim, Y. S., & Kim, Y. H. (2010b). The efficiency scheme of design VE through the case studies of construction VE for apartments, Korea Institute of Construction Engineering and Management, 11(4), 59-67. https://doi.org/10.6106/KJCEM.2010.11.4.59
  29. Korea Value Engineering Institute. (2016). Construction VE expert basic course. Seoul, Korea Value Engineering Institute, 49-87.
  30. Kwon, M. D., Park, S. Y., & Jo, C. W. (2021). A utilization plan for automatic validation of BIM-based design VE, Korean Journal of Computational Design and Engineering, 26(3), 262-271. https://doi.org/10.7315/CDE.2021.262
  31. Lee, H. C., Hyun, C. T., Son, M. J., & Ji, S. M. (2011). Development of a Value evaluation model for design VE proposals using scenario planning, Architectural Institute of Korea, 27(4), 113-120.
  32. Lee, J. S., & Chun, J. Y. (2010). A method for selection of optimum alternative and decision making support process in construction VE, Architectural Institute of Korea, 26(3), 118-119.
  33. Lee, Y. J. (2013). A case study on the application of Value Engineering method to the educational facilities (Focused on osong high school project), Master's Thesis, Cheongju University, 2-21.
  34. Lim, J. K., Kim, S. H., & Lee, M. J. (2014). Development of web-based VE supporting system for effective workshop, Korea Institute of Construction Engineering and Management, 15(2), 71-78.
  35. Min, K. S. (2022). A study on the application of smart technology-based VE process model for construction safety management, Doctoral Thesis, Namseoul University, 2022(16), 1-21.
  36. Min, K. S. (2010). A study of the function analysis for the effective campus master plan through value engineering method, Korea Education and Environment Research Institute, 9(3), 41-48.
  37. Min, N. R. (2019). A study on improvement of design guidelines for apartment housing through case analysis of VE(Value Engineering), Master's Thesis, Seoul National University of Science & Technology, 93-96.
  38. Myoung, J. H., Park, J. H., Lee, Y. J., Jung, I. S., & Lee, C. S. (2010). A study on the development of evaluation indication for selection of VE team member, Architectural Institute of Korea, 26(2), 71-78.
  39. Ok, H., Kim, S. J., & Kim, T. H. (2017). Research on analyzing the current state of design VE information system and connection method, korea Computer Congress, 2017(6), 34-36.
  40. Ok, H., Kim, S. J., & Kim, T. H. (2018). A study on improvement for connecting function of design VE system in public construction, Korea Computer Congress, 2018(6), 21-23.
  41. Oh, M. J., Gwak, H. G., Cho, D. H., Park, S. H., & Koo, K. J. (2014). Space hierarchy-based alternative assessment components derived in design VE for elementary school construction, Architectural Institute of Korea, 35(1), 493-494.
  42. Park, B. S., & Kim, O. K. (2022). A study on the application of design VE process in pre-construction phase for GMP determination of CM at Risk project, Korea Institute of Construction Engineering and Management, 23(5), 56-64.
  43. Park, C. Y., Yun, S. M., & Lee, D. E. (2021). Establishing the strategy of effective construction VE for construction firms, Korea Institute of Construction Engineering and Management, 22(2), 80-87.
  44. Park, H. T., Park, C. S., & Jung, W. S. (2014). A study on the improvement of the design VE process using VE idea-databank system, Korea Institute of Construction Engineering and Management, 15(1), 28-38. https://doi.org/10.6106/KJCEM.2014.15.1.028
  45. Park, J. Y., Seo, H. H. & Kim, B. S. (2018). Improvement plan based on awareness investigation of construction VE system in domestic construction, Korea Institute of Construction Engineering and Management, 19(3), 79-88
  46. Park. M. S. (2016). A study on the improvements of the conventional bidding system through VE, Doctoral Dissertation, Hoseo University, 90-93.
  47. Park, Y. J. (2013). Performance and improvement of design VE, Korea land & housing corporation, Korea Institute of Construction Engineering and Management, 14(4), 29-36.
  48. Shin, J. B., O, J. H., Min, B. G., Son, B. D., & Kim, D. J. (2019). A study on value improvement(VE) of LTE-R radio construction Kyungbu high-speed train, Journal of the Korean Society for Railway, 2019(5), 26-28.
  49. Shin, Y. S. (2014). Utilization of business creative code for the effective idea generation for design - VE : SMPS design VE case study, Master's Thesis, Sungkyunkwan University, 49-59.
  50. Song, C. Y., & Yang, B. S. (2021). Development of mobile-based design Value Engineering(VE) supporting system for VE process improvement, The Korea Institute of Building Construction, 21(5), 433-443.
  51. Song, H. J., Kim, J. H., Han, S. W., & Hyun, C. T. (2015). A VE case study for improving of the public facilities maintainability (Focused on Korea job world new construction), Architectural Institute of Korea, 35(1), 503-504.
  52. Seog, H. S. (2012). A study on the efficient budget execution of military facilities using Value Engineering (Mainly focused on VE activation in design phase), Master's Thesis, Hanyang University, 32-41.
  53. Sung, D. S., Chung, W. Y., & Sung, M. J. (2021). Value Engineering for creative career education center construction project, Architectural Institute of Korea, 64(11), 60-63.
  54. Yang, J. K., Park, G. H., Lee, J. J., Kim, D. H., & Hawng, T. U. (2022). A study on the selection of Value improvement areas for remodeling VE in university facilities, Architectural Institute of Korea, 42(2), 1-4.