Practical modeling and quantification of a single-top fire events probabilistic safety assessment model

  • 투고 : 2022.10.11
  • 심사 : 2023.03.24
  • 발행 : 2023.06.25

초록

In general, an internal fire events probabilistic safety assessment (PSA) model is quantified by modifying the pre-existing internal event PSA model. Because many pieces of equipment or cables can be damaged by a fire, a single fire event can lead to multiple internal events PSA initiating events (IEs). Consequently, when the fire events PSA model is quantified, inappropriate minimal cut sets (MCSs), such as duplicate MCSs, may be generated. This paper shows that single quantification of a hypothetical single-top fire event PSA model may generate the following four types of inappropriate MCSs: duplicate MCSs, MCSs subsumed by other MCSs, nonsense MCSs, and MCSs with over-counted fire frequencies. Among the inappropriate MCSs, the nonsense MCSs should be addressed first because they can interfere with the right interpretation of the other MCSs and prevent the resolution of the issues related to the other inappropriate MCSs. In addition, we propose a resolution process for each of the issues caused by these inappropriate MCSs and suggest an overall procedure for resolving them. The results of this study will contribute to the understanding and resolution of the inappropriate MCSs that may appear in the quantification of fire events PSA models.

키워드

과제정보

The authors would like to thank the anonymous reviewers for their valuable comments and suggestions to improve the quality of our paper. This work was supported by the National Research Foundation of Korea (NRF) grant funded by the Korean government (MSIT) (RS-2022-00144204).

참고문헌

  1. B. Najafi, et al., EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities: Volume 2: Detailed Methodology, Electric Power Research Institute (EPRI), Palo Alto, CA, and U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research (RES), EPRI TR-, Rockville, MD, 2005, 1011989 and NUREG/CR-6850.
  2. ASME/ANS, Addenda to ASME/ANS RA-S-2008, Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications, ASME/ANS RA-Sa-2009, The American Society of Mechanical Engineers, New York, U.S., September, 2009.
  3. D.I. Kang, S.H. Han, K.Y. Kim, An approach to the construction of a one-top fire event PSA model, Nucl. Eng. Des. 239 (2009) 2514-2520. https://doi.org/10.1016/j.nucengdes.2009.07.026
  4. D.I. Kang, Y.H. Jung, Comparative study on the construction of support system initiating event FT s for a fire probabilistic safety assessment, Nucl. Eng. Des. 332 (2018) 345-356. https://doi.org/10.1016/j.nucengdes.2018.03.038
  5. R.C. Anoba, Mapping of fire events to multiple internal events PRA initiating events, in: International Topical Meeting on Probabilistic Safety Assessment and Analysis (ANS PSA 2011), Wilmington, NC, March 13-17, 2011.
  6. B.T. Albinson, G.T. Zucal, D.E. Vanover, Integration of a fire initiating event decision tree into a fire PRA, in: International Topical Meeting on Probabilistic Safety Assessment and Analysis (ANS PSA 2013), September, Columbia, SC, 2013, 22-26.
  7. N. Lovelace, M. Johnson, M. Lloyd, Approach for integration of initiating events into external event models, in: Probabilistic Safety Assessment and Management (PSAM 12), Honolulu, Hawaii, 2014.
  8. P.E. Risley, C. Worrell, K. Christiansen, An approach for apportioning fire scenario frequencies to induced initiating events, in: International Topical Meeting on Probabilistic Safety Assessment and Analysis (PSA 2019), Charleston, SC, April 28-May 3, 2019.
  9. D.I. Kang, Y.H. Jung, A Study on Mapping Fire Events to Multiple Initiating Events in a One-Top Fire Event PSA Model, KAERI/TR-9200/2022, Korea Atomic Energy Research Institute, Daejeon, Korea, 2022.
  10. S.H. Han, H.G. Lim, S.C. Jang, J.E. Yang, AIMS-PSA: a software for integrated PSA, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), Seoul, Korea, 2016.
  11. EPRI, FTREX 2, 0 User Manual (3002018234), EPRI, Palo Alto, CA and KAERI, 2020. Daejeon, South Korea.
  12. W.E. Vesely, et al., FT Handbook, USNRC, 1981. NUREG-0492).
  13. S.K. Park, W.S. Jung, Probability subtraction method for accurate quantification of seismic multi-unit probabilistic safety assessment, Nucl. Eng. Technol. 53 (2021) 1146-1156. https://doi.org/10.1016/j.net.2020.09.022
  14. Korea Hydro, Nuclear Power Co, Probabilistic Safety Assessment for Ulchin Units 3&4 [Level 1 PSA for External Events: Main Report], Ltd, 2004.