과제정보
This work was supported by the Nuclear Safety Research Program of the Korea Foundation of Nuclear Safety funded by the Korean government's Nuclear Safety and Security Commission [grant number 2203027-0122-CG100]; and the Nuclear Research & Development Program of the National Research Foundation of Korea funded by the Korean government's Ministry of Science and ICT [grant number NRF-2017M2B2B1071973].
참고문헌
- OECD/NEA, Probabilistic Risk Criteria and Safety Goals (NEA/CSNI/R(2009)16), Organisation for Economic Cooperation and Development/Nuclear Energy Agency, 2009.
- R. Bartel, WASH-1400 the Reactor Safety Study - the Introduction of Risk Assessment to the Regulation of Nuclear Reactors (NUREG/KM-0010), United States Nuclear Regulatory Commission, 2016.
- USNRC, The Reactor Safety Study e an Assessment of Accident Risks in U. S. Commercial Nuclear Power Plants (NUREG 75/014), United States Nuclear Regulatory Commission, 1975.
- W.E. Vesely, F.F. Goldberg, N.H. Roberts, D.F. Haasl, Fault Tree Handbook (NUREG-0492), United States Nuclear Regulatory Commission, 1981.
- NASA, Fault Tree Handbook with Aerospace Applications, National Aeronautics and Space Administration, 2002.
- A.D. Swain, H.E. Guttmann, Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications e Final Report (USNRC/CR1278), United States Nuclear Regulatory Commission, 1983.
- A. Kolaczkowski, J. Forester, E. Lois, S. Cooper, Good Practices for Implementing Human Reliability Analysis (NUREG-1792), United States Nuclear Regulatory Commission, 2005.
- ASME, Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications, The American Society of Mechanical Engineers, 2002.
- NEI, Probabilistic Risk Assessment(PRA) Peer Review Process Guidance (NEI 00-02), Nuclear Energy Institute, 2000.
- USNRC, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities (Draft Regulatory Guide 1.200), United States Nuclear Regulatory Commission, 2004.
- A.D. Swain, Accident Sequence Evaluation Program Human Reliability Analysis Procedure (NUREG/CR-4772), United States Nuclear Regulatory Commission, 1987.
- D. Gertman, H. Blackman, J. Marble, J. Byers, C. Smith, The SPAR-H Human Reliability Analysis Method (NUREG/CR-6883), United States Nuclear Regulatory Commission, 2005.
- W. Jung, D. Kang, J. Kim, Development of A Standard Method for Human Reliability Analysis(HRA) of Nuclear Power Plants (KAERI/TR-2961), Korea Atomic Energy Research Institute, 2005.
- J. Forester, A. Kolaczkowski, E. Lois, D. Kelly, Evaluation of Human Reliability Analysis Methods against Good Practices (NUREG-1842), United States Nuclear Regulatory Commission, 2006.
- J. Park, A.M. Arigi, J. Kim, A comparison of the quantification aspects of human reliability analysis methods in nuclear power plants, Annals of Nuclear Energy 133 (2019) 297-312. https://doi.org/10.1016/j.anucene.2019.05.031
- Awwal Mohammed Arigi, Gayoung Park, Jonghyun Kim, Dependency analysis method for human failure events in multi-unit probabilistic safety assessments, Reliability Engineering & System Safety 203 (November 2020), 107112.
- Sarah M. Herberger, Ronald L. Boring, Human failure event dependence: what are the limits?, in: Proceedings of the 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), 2~7 October, 2016. Seoul, Korea.
- Andrew Miller, Stephen M. Hess, Curtis L. Smith, R&D Roadmap to Enhance Industry Legacy Probabilistic Risk Assessment Methods and Tools, INL/EXT-20-59202, United States Department of Energy, August 2020.
- M. Cepin, DEPEND-HRA - a method for consideration of dependency in human reliability analysis, Reliability Engineering and System Safety 93 (2008) 1452-1460. https://doi.org/10.1016/j.ress.2007.10.004
- EPRI, FTREX 1.9 Software Manual (3002012968), Electric Power Research Institute, 2018.
- H.A.N. Sang Hoon, L.I.M. Ho-Gon, J.A.N.G. Seung-Cheol, Y.A.N.G. Joon-Eon, AIMS-PSA, A software for integrated PSA, in: Proceedings of the 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), 2~7 October, 2016. Seoul, Korea.
- W.S. Jung, J.E. Yang, Truncation Uncertainty of the Fault Tree Analysis in the Probabilistic Safety Assessment of Nuclear Power Plants, Korea Atomic Energy Research Institute, 2004. KAERI/TR-2820/2004.
- D.I. Kang, W.D. Jung, J.E. Yang, A Human Reliability Analysis of Post- Accident Human Errors in the PSA of KSNP, KAERI/TR-2950/2005), 2005.