References
- CBE Group, Innovative Automated Plants; https://www.cbetunnels.com/en/precast-plants/automated-plants.html.
- Ebrahimy, Y., AbouRizk, S.M., Fernando, S. and Mohamed, Y. (2011), "Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain", Eng. Constr. Architect. Management, 18(5), 462-480. https://doi.org/10.1108/09699981011074600
- Gruebl, F. (2006), Segmental rings (critical loads and damage prevention), International Symposium on Underground Excavation and Tunneling, Bangkok, Thailand.
- Guglielmetti, V., Grasso, P., Mahtab, A. and Xu, S. (2007), Mechanized Tunneling in Urban Areas: Design methodology and construction control, CRC Press, London, UK.
- Hamidi, J.K., Shahriar, K., Rezai, B. and Rostami, J. (2010), "Performance prediction of hard rock TBM using rock mass rating (RMR) system", Tunn. Undergr. Sp. Tech., 25(14), 333-345. https://doi.org/10.1016/j.tust.2010.01.008
- Hariyanto, A.D., Kwan, H.P. and Cheong, Y.W. (2005), "Quality control in precast production a case study on tunnel segment manufacture", DIMENSI J. Architect. Built Environ., 33(2), 153-164. https://doi.org/10.9744/dimensi.33.2.%25p.
- Herrenknecht Formwork Technology GmbH (2015), Sophisticated All-Around Solution: Carousel Segment Production for BOSSLER Tunnel; https://www.herrenknecht-formwork.com.
- Hon, K.K.B. (2005), "Performance and evaluation of manufacturing systems", CIRP Annals Manufact. Technol., 54(2), 139-154. https://doi.org/10.1016/S0007-8506(07)60023-7.
- Hosseininasab, S.M.E. and Ershadi, M.J. (2015), "Patterns of variation and correlation in quality control characteristics of segment installation: a case study", Int. J. Quality Reliab. Management, 32(3), 236-249. https://doi.org/10.1108/IJQRM-11-2012-0149
- Hudson, J.A. and Harrison, J.P. (2000), Engineering Rock Mechanics: An Introduction to the Principles, Elsevier Science, Oxford, UK.
- ITA, (2000), "Guidelines for the design of shield tunnel lining", Tunn. Undergr. Sp. Tech., 15(3), 303-331. https://doi.org/10.1016/S0886-7798(00)00058-4.
- Jalali, M. and Beik, P. (2018), "Analysis of lining load of mechanized tunnels - a case study of Zayanderood dam to Kashan water conveyance tunnel", Tunn. Undergr. Sp. Eng., 6(2), 19-36.
- Katebi, H., Rezaei, A.H., Hajialilue-Bonab, M. and Tarifard, A. (2015), "Assessment the influence of ground stratification, tunnel and surface buildings specifications on shield tunnel lining loads (by FEM)", Tunn. Undergr. Sp. Tech., 49(1), 67-78. https://doi.org/10.1016/j.tust.2015.04.004
- Rezaei, A.H. and Ehterami, A.A. (2019), "Surface buildings risk classification and evaluation of in-situ piles effect in mitigation the settlements caused by excavation of metro tunnels in urban areas", J. Transport. Infrastruct. Eng., 5(1), 97-119.
- Rezaei, A.H., Shirzehhagh, M. and Baghban Golpasand, M.R. (2019), "EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements", Geomech. Eng., 19(2), 153-165. https://doi.org/10.12989/gae.2019.19.2.153.
- Riechers, J. (2014), "Customized state-of-the-art segment production", segmental lining conference (CBIP), Delhi, India.
- Shayanfar, M.A., Mahyar, P., Jafari, A. and Mohtadinia. M. (2018), "Classification of precast concrete segments damages during production and transportation in mechanized shield tunnels of Iran", Civil Eng. J., 3(6), 412-426. https://doi.org/10.28991/cej-2017-00000101
- Tajik, M., Omid Frough, O. and Tavakoli, H.R. (2015), "Quality assessment of segmental lining installation in mechanized excavation case study: Tehran-Karaj water conveyance tunnel (lot II)", Tunn. Undergr. Sp. Eng., 3(1), 37-50.
- Tunnel Business Magazine (2014), Innovations in Precast Concrete Segmental Linings: Case Studies from Around the World; https://tunnelingonline.com/innovations-precastconcrete-segmental-linings-case-studies.
- TURO (2010), Segment Factory, Tabriz Urban Railway Organization; http://tabrizmetro.ir/?PageID=44
- Wang, S., Tang, J., Zou, Y. and Zhou, Q. (2020), "Research on production process optimization of precast concrete component factory based on value stream mapping", Eng. Constr. Architect. Management, 27(4), 850-871. https://doi.org/10.1108/ECAM-10-2018-0455
- Wang, T., Abdallah, M., Clevenger, C. and Monghasemi. S. (2021), "Time-cost-quality trade-off analysis for planning construction projects", Eng. Constr. Architect. Management, 28(1), 82-100. https://doi.org/10.1108/ECAM-12-2017-0271
- Zhao, C., Alimardani, A., Barciaga, T., Kamper, C. and Mark, P. (2017), "Prediction of tunnel lining forces and deformations using analytical and numerical solutions", Tunn. Undergr. Sp. Tech., 64(1), 164-176. https://doi.org/10.1016/j.tust.2017.01.015