Acknowledgement
This work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government (MSIT)(No.2020R1A2C1005263).
References
- Dzulkifli N, Sarbini NN, Ibrahim IS, Abidin NI, Yahaya FM, Azizan NZN. Review on maintenance issues toward building maintenance management best practices. Journal of Building Engineering. 2021 Dec;44:102985. https://doi.org/10.1016/j.jobe.2021.102985
- Chow JK, Liu KF, Tan PS, Su Z, Wu J, Li Z, Wang YH. Automated defect inspection of concrete structures. Automation in Construction. 2021 Dec;132:103959. https://doi.org/10.1016/j.autcon.2021.103959
- Lavy S, Jawadekar S. A case study of using BIM and COBie for facility management. International Journal of Facility Management. 2014 Dec;5(2):109458840.
- Lu Q, Chen L, Lee SH, Zhao X. Activity theory-based analysis of BIM implementation in building O&M and first response. Automation in Construction. 2018 Jan;85:317-32. https://doi.org/10.1016/j.autcon.2017.10.017
- Lin YC, Su YC. Developing mobile-and BIM-based integrated visual facility maintenance management system. The Scientific World Journal. 2013 Oct;2013:124249. https://doi.org/10.1155/2013/124249
- Chen W, Chen K, Cheng JC, Wang Q, Gan VJ. BIM-based framework for automatic scheduling of facility maintenance work orders. Automation in Construction. 2018 Jul;91:15-30. https://doi.org/10.1016/j.autcon.2018.03.007
- Teicholz P. BIM for facility managers. Nj: John Wiley & Sons; 2013. 352 p.
- Chen K, Yang J, Cheng JCP, Chen W, Li CT. Transfer learning enhanced AR spatial registration for facility maintenance management. Automation in Construction. 2020 May;113:103135. https://doi.org/10.1016/j.autcon.2020.103135
- Chen YJ, Lai YS, Lin YH. BIM-based augmented reality inspection and maintenance of fire safety equipment. Automation in Construction. 2020 Feb;110:103041. https://doi.org/10.1016/j.autcon.2019.103041
- Dai F, Olorunfemi A, Peng W, Cao D, Luo X. Can mixed reality enhance safety communication on construction sites? An industry perspective. Safety Science. 2021 Jan;133:105009. https://doi.org/10.1016/j.ssci.2020.105009
- Nguyen DC, Nguyen TQ, Jin R, Jeon CH, Shim CS. BIM-based mixed-reality application for bridge inspection and maintenance. Construction Innovation. 2021 Sep;22(3):487-503. https://doi.org/10.1108/CI-04-2021-0069
- Whiskard H, Jones D, Voller S, Snider C, Gopsill J, Hicks B. Mixed Reality tools as an enabler for improving Operation and Maintenance in Small and Medium Enterprises. 15th IFIP WG 5.1 International Conference; 2018 Jul 2-4; Turin, Spain. Cham, Switzerland: Springer; 2018. p. 3-14. https://doi.org/10.1007/978-3-030-01614-2_1
- Choi MY, Kim SY, Kim SH. Integration of 3D Laser Scanner and BIM Process for Visualization of Building Defective Condition. Journal of the Korea Institute of Building Construction. 2022 Apr;22(2):171-82. https://doi.org/10.5345/JKIBC.2022.22.2.171
- Choi JH, Um DY. A study on the feasibility of COBie to the wastewater treatment plant. KSCE Journal of Civil and Environmental Engineering Research. 2014 Feb;34(1):273-83. https://doi.org/10.12652/Ksce.2014.34.1.0273
- Artus M, Alabassy MSH, Koch C. A BIM based framework for damage segmentation, modeling, and visualization using IFC. Applied Sciences. 2022 Mar;12(6):2772. https://doi.org/10.3390/app12062772
- Terreno S, Asadi S, Anumba C. An exploration of synergies between lean concepts and BIM in FM: A review and directions for future research. Buildings. 2019 Jun;9(6):147. https://doi.org/10.3390/buildings9060147
- Akcamete A, Liu X, Akinci B, Garrett Jr JH. Integrating and visualizing maintenance and repair work orders in BIM: lessons learned from a prototype. Proceedings of the 11th International Conference on Construction Applications of Virtual Reality (CONVR); 2011 Nov 3-4; Weimar, Germany. Weimar (Germany): Verlag der Bauhaus-University; 2011. p. 639-49.
- Liu R, Issa RR. Design for maintenance accessibility using BIM tools. Facilities. 2014 Feb;32(3/4):153-9. https://doi.org/10.1108/F-09-2011-0078
- Becerik-Gerber B, Jazizadeh F, Li N, Calis G. Application areas and data requirements for BIM-enabled facilities management. Journal of Construction Engineering and Management. 2012 Mar;138(3):431-42. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000433
- Xie X, Lu Q, Rodenas-Herraiz D, Parlikad AK, Schooling JM. Visualised inspection system for monitoring environmental anomalies during daily operation and maintenance. Engineering, Construction and Architectural Management. 2020 Sep;27(8):1835-52. https://doi.org/10.1108/ECAM-11-2019-0640
- Pishdad-Bozorgi P, Gao X, Eastman C, Self AP. Planning and developing facility management-enabled building information model (FM-enabled BIM). Automation in Construction. 2018 Mar;87:22-38. https://doi.org/10.1016/j.autcon.2017.12.004
- Chung SW, Cho CS, Song JW, Lee KH, Lee SJ, Kwon SW. Smart facility management system based on open bim and augmented reality technology. Applied Sciences. 2021 Nov;11(21):10283. https://doi.org/10.3390/app112110283
- Seo KW, Kwon TH, Lee SH. COBie based maintenance document generation of railway track. Journal of the Computational Structural Engineering Institute of Korea. 2017 Aug;30(4):307-12. https://doi.org/10.7734/COSEIK.2017.30.4.307
- Koo KJ, Park SH, Cho DH. COBie document prototype for supporting BIM based smart maintenance of buildings. Journal of the Korea Academia-Industrial Cooperation Society. 2019 Dec;20(12):60-8. https://doi.org/10.5762/KAIS.2019.20.12.60
- Kang TW. COBie-based building information exchange system framework for building facility management. Journal of the Korea Academia-Industrial Cooperation Society. 2020 Aug;21(8):370-8. https://doi.org/10.5762/KAIS.2020.21.8.370
- Shin S, Moon H, Shin J. BIM-Based maintenance data processing mechanism through COBie standard development for port facility. Applied Sciences. 2022 Jan;12(3):1304. https://doi.org/10.3390/app12031304
- Lee SK, Yu JH, An HK. Improvement of information collection system in design and construction phasesfor efficient facility management. Journal of the Architectural Institute of Korea Planning & Design. 2012 May;28(5):33-42. https://doi.org/10.5659/JAIK_PD.2012.28.5.33
- Kim MW, Ock JH. Development of a project design stage BIM guide for project owners. Transactions of the Society of CAD/CAM Engineers. 2015 Sep;20(3):269-80. http://dx.doi.org/10.7315/CADCAM.2015.269
- Alizadehsalehi S, Hadavi A, Huang JC. From BIM to extended reality in AEC industry. Automation in Construction. 2020 Aug;116:103254. https://doi.org/10.1016/j.autcon.2020.103254
- Eastman C, Teicholz P, Sacks R, Liston K. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors. 1st ed. NJ: John Wiley & Sons; c2008. Chapter 12, BIM for Owners and Facility Managers; p. 93-147.
- Salamak M, Jasinski M, Plaszczyk T, Zarski M. Analytical modelling in dynamo. Civil Engineering Series. 2018 Jan;18(2): 36-43. https://doi.org/10.31490/tces-2018-0014
- Shared Parameters [Internet]. San Francisco CA: Autodesk Revit 2023. Available from: https://help.autodesk.com/view/RVT/2023/ENU/?guid=GUID-E7D12B71-C50D-46D8-886B-8E0C2B285988